VCS PROJECT CONSULTANTS PVT. LTD.
QD MASTER INDEX
FOR
PIPE & PIPELINE
VPC – QD – PP - 004
00 27.10.2017 ISSUED AS STANDARD MG RD AD SK
Rev. No Date Purpose Prepared By Checked By Approved By Approved By
FORMAT NO. VPC-QD-002-RO Copyright VCS Project – All rights reserved Page 1 of 3
DOCNO: VPC-QD-PP-004
IDC / SQUAD CHECK MATRIX REV No: 00
PIPELINE & PIPING ENGINEERING DEPARTMENT DEPARTMENT
Input IDC / SQUAD Check Distribution
Deliverable
Others BU Piping
Discipline Data PC CS ME EL IN
(if applicable)
PE Survey Details/ Contract
PFDs/ P&IDs/
PC
Equipment List
Equipment
IDC IDC IDC IDC IDC
Layout
CS Coordinates and survey data
Equipment Data sheet/ size/ Vendor
ME
Drg.
PE Survey Details/Contract Document
Station Approach
IDC IDC IDC
Drawing
CS Plot Plan
PE Contract Document
Process Design Basis/P&IDs/Line
PC Piping General
List
Arrangement IDC IDC IDC IDC IDC
CS Plot Plan Drawing
ME Equipment size/Data sheets
FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 2 of 3
DOCNO: VPC-QD-PP-004
IDC / SQUAD CHECK MATRIX REV No: 00
PIPELINE & PIPING ENGINEERING DEPARTMENT DEPARTMENT
IDC / SQUAD Check Distribution
Input
Deliverable
Others BU Piping
Discipline Data PC CS ME EL IN
(if applicable)
PE Survey Details/ Contract
Borehole details, Leak sensor and
CS
pig signaller pit (if required)
Alignment sheets &
IDC IDC IDC
Crossing drawings
EL CP and OHL mitigation
IN OFC and Leak sensor requirements
EL CP and OHL mitigation
Bollards & Tell Tale post for OHL Pipeline Typical
CS IDC IDC IDC
mitigation & concrete slabs. drawings
IN OFC and Leak sensor requirements
Squad check is not mandatory and it may be carried out in case of requirement of urgent review for preponed schedule, if any at the sole discretion.
Released By:
ANUPAM DAS
FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 3 of 3