0% found this document useful (0 votes)
540 views

EIA Rawang Bypass First

none

Uploaded by

Norliyani Limen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
540 views

EIA Rawang Bypass First

none

Uploaded by

Norliyani Limen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 16
44 2 ‘Supplementary Environmental inact Assorsmant “ropa Roa rush Pant (CHAPTER 1 INTRODUCTION PRovecr TINE “The proposed development the ‘PROPOSED ROCK CRUSHING PLANT ON LOT 284, PT 474, PT 475, PT 476 & PT 4477 MEASURING 3.88 HA AT MUKIMI SERENDAH, DISTRICT OF HULU SELANGOR, SELANGOR DARUL EHSAN". PROJECT BACKGROUND ‘The Pralinnary Envrormental Impact Assessment (CIA for he Rawang Town Bypass Hiawav Gna blasting operation was submited othe Desartmnt of Fvkonment (O08) Selangorin September 2009 ada further Adéendum Report submited in March 2005, The Prelinary EIA approval fr the project was gen In Decomber 2005 and ‘sunjec fo various condition of pproval [As the issu at hat time wa withthe ignment averting trough the Tanian Wasa Kanching and any posse atenave designs weee internet a that time, apprval ofthe Preiminay EIA Report was provided upto CH 3160, inorder to alow fr any ‘possi change n the alignment par to crossing the boundary of the Taman Wrisan KKenchng. The ancarn was tal work progressing ino the Taman Warsan Kanching should not proced wihout pr approval Any werk beyond the CH 4400 of the new ‘lgnment at the Eastern Bypass that avers into te Taman Warian Kanching le to require a Suppementary report tobe submited for approval, Subsequent to thi. the ‘Supplementary EIA Repr forthe Proposed Now Elevated Alignment in Taman Warsan forthe Fanang “own Bypass Proje! (wil be refered toa the Phase 2~ Rawang Town ‘Bypass Highway was submit othe DOE Selangor and approved March 2007 Honever, due w the excessito granto reck preductlon resulting fom the Bissing ‘operation a the on-going Phase 2 ~ Rawang Town Bypass Highway and request ram DOE Selangor va eter datod 20" September 2013, another new Supplementary EIA is prepared forthe establishment of the rack eushing pant 6 supplement he previous EIA Reports approved in 2008 and 2007. The approval of tho Preliminary Ste Astestment (PAT) i sashes In Appendix 1. As the biasing acvty had been approved by the Deparment of Mneal and Geosclence Selangor er aporoval ter hn Append ) ed is steady ongoha, this SEIA wil eny cover the activites Invaved str the basting ‘ety which nds hauling othe blasted rock an ale the constuction and operation (of he rock crusting pant. Project Bet ‘The proposed project covers a total area of 3.88 hectares (959 acres) which located wihin the rightsFray (ROM) ofthe completed Phase 1 ~ Rawang Town Bypass Highway. The proposed projects to esabish a temporary rock crusting plant to crush grant rock fom the basing operation alte ongoing Phase 2 - Rawang Town Bypass Highway. ‘Een Ae Sen Br 7 4 18 Supplementary Environmental Impact Assess “Banos Roa rush Part The project seis situated aporoxiately 1 km south of Serendah Town and 4 ken northeast ofthe Rawang Town: Is accessible rom te Kua Lumpur ~ Kuala Selangor Expreseway (Route £25) fom Kuala Limpur and hen tering onto od Rang Highway (Route 1) hat connects oth completod Phase 1 Rawang Town Bypass Highway. The 'ocaion map ofthe proposed project iis shown in Fee. LATITUDE & LONGITUDE {Geographical th proposos project et is ocated within the flowing coordinates szroosz'n 101" se'090"e S2v0607N UI ae Gage S275055°N 1013 Sar" E S252" OTrse4OrE S20 578s'N tor se OTE F2VOuTN fOr ae LATE ‘CADASTRAL NAP ‘The projet ste located on Lot 284, PT 474, PT 476, PT 78 and PT 477 at Mukin Serondah, Distt of Hulu Selange, Solange, Based on th cadasral map, the se Is adjcent othe competed Phase 1 ~ Rawang Town Bypass Highway, The cadastral map of the proposed orojcl ans sureundng land shown in Figure 12, STATEMENT 0° NEED Need of th Prioet CS Mujur Sc Bd, sub-convactr of Pancana Enterprise Sh Bh plans to establish @ ‘emperary rock using plant in Mukim Serendah to cash rane rock rom he Blasting ‘peraion a he an going Phase 2— Rawang Town Bypass Highway and to produce road ‘ase material ant granite agaragte forth oe projet ‘The main aspads fr the proposed project such as the suroundng areas, existing topography, roa ereuation system, the soda and economic needs have. boon Ccansdered. The objective ofthe projet f to estblsh a temporary rock crushing plant thot mete te flouing ceria + Retain the isting topography and envronmentalqulty Provide an sdequate and efit infastuctur facies and ues “The study indicates that he proposed project area was sleted because of ts eratogle location, secestity and dstanco from eoncantations of reise! development. The topography of the ropcsed sto is vary sulle fr a rock crushing plan. the rock {cushing plant isnot established at the proposed st, Panzana Enerriee Sdn Bhd wil have fo Wanspat eat the blasted rate rock andor to souroe aggragate from the ‘exstng quaes in he vicinty of Mu Serendan er Hulu Selangor Dist of further ‘field. Long hauls fom tie existing quaries wil be uneconomic and increase the potential envrerenial impact lo he eating road usar fram eplage and movement of heavy vehices, “Frame Ais Sr Bd 12 ‘Supplementary Environmental ptt Assessment Prososad Rick Ching Pant ‘Based onthe physical properties and socio economic vakes surrounding the projet i, itean be conled that the projec ste wold bring fr the following edvantage *+ Provides oh onoorunes oresiants of Maki Serena “The proposed project is estimated fo provide job opportunites othe local resident. Besides ts, the project would also enhance slher economeal development “surcunding the ste. AS recut the seco ezanoml status ofthe Mukim Serendan Fesidents wl be enhance, ‘The proposed project wil provide granite aggregate forthe construction of bulings and toads he region, + Shorten he raveting tne and ost flectve “Tho location ofthe rock cus plant provides good eeanome eue in expect 0 houina ditnce. “The ratonale fhe proposed eject n Mukin Serendah i algo supported by data and Inoraton exacted from th Tenh Malaysia Pan, Suctre Pan of Selangor Laporan Pemerkssan andthe Local Pian of Mais Daerah ul Selangor. ‘Tenth MlaysiaPlan (2011 ~ 2016) Besed on the Tenth Malaysia Plan, the roposed project is clegorised as developing ‘smal and medium enterprises (SME), which has boen Kenified as one ofthe sstegy hich focuses en spcialistion ina few selected economic sectors and gograptes ‘rer fo move ito the league of highncome economias Represening 83.2% of all businosses in Malaysia and contibuting 56.4% of ttl employment in he cour, SMEs costiue an important component ofthe Malaysian ‘economy and have the potent o be a power engine growth and innovation. During the Ninh Plan period, despite considerate chalnges, vals added of SMES giew at 7.7%, faster tan th overall economic growth. Consequently, SME convbuton to GOP Increased fem 20.4% b 2005 1 31.4% in 2008, This was mainly stributed to poey inaves intocuced by the government incuding beter coordination ameng the Iminsties and aponies wih he establshnent of te National SME Developmen! Counc (ws00). Accorang to tte Plan, the government is commited to unlocking the groith and Innovation ptorial ef SMEs over tho Plan period wo create domest, regional sd Gbal champions. Thx, he flowing aves wil be undertaken ‘Reducing te regulatory costs borne by SMES ‘ulingcapcty and capabiiies of SNES ‘Supping he eroaon of on anirprenciil cate ‘Svenginening super systems fr SMES [Eahancng access to franc fr SMES ‘Thus, is shows ne proposed projets inne wt the Tenth Malaysia Plan a tnvelves th developmen: of medum indies in ode for Malaysia Yo achieve the aspiration of becoming a hghenceme advanced economy by 2020 “Eronment Ae Sin I s 153 184 61 Supplementary Environmental inact Assessment "roped fs Crus Pant ‘Structure Planof Selangor Laporan Pereriksaan (2002 ~ 2020) Iie important tat he project dovelopnent fall inne wth the local plan to ensue it wi conte and rot hinder th overall development of he Selango State. Tha project ste Is located in the Holy Ssingor Disrct of the Stale of Solange. The Selangor Government pln to implementa cider based development strategy ns order to ensire 2 balanced development amang the diferent dtrts In Selangor a6 sated In the “Laporan Pemeitsan Rancangan Stuur Nog Solange (20022020). This strategy has rested in 10 main zones of development, a= shown in Figure 1.3, end Muli Serondah fl under Zone E tat is earmarked for residential, insta, services and _2greultral. Th ultimate aim ofthe satay wast contibue towards @ developed stats {or the sale of Setangor and to be the front Iner i leading Malaysia to achive & ceveloped natn status by tte year 2020, Thus, the propesed project wil ply an Important parte contibaing to the gow ofthese seca in Selangor to comment the developmen strategy autinad inte Stucture lan. The proposed project ley Indicated a bon in tandom wi th ams and objectives on he Selanooe Goverment ‘Loca Plan of Derah Hulu Selangor 2020 Based on the Loca Plan of Daerah Hu Selangor, the projet ste fais under @ residential area Figure 1.4), Novorhooes, th proposed sit located within the ROW of the completed Phase 1 - Ravang Town Bypass Highway and ths had bean acinowedged by DOE Selangor without any ebjectons inthe PAT approval lair (Appendix 1). The sto has afeady bean approved by th slate goverment as the Rewang Town Eypass Hight. The Preliminary Ela Report for he entre Rawang Town Bypass Highway was approved In December 2005 sibjct to various conditions of approval and ths was falewed bythe approval of he Supplementary EIA Repot forthe ‘erated eocion in March 2007. Therefor, the development of the proposed rock ‘ushing pant this sie requires no conversion in and use ait i ected wit the ‘xstng ROW ofthe Rawang Town Bypass Highway, LEGAL AND OTHER REQUIREMENTS. In romotion ofan envionment sound and sustainable development the govecrment has estabishod the necessary legal Instutonal arangements 0 that envronmentd factors ae takin info considerations at the early stages of project panning, The Enuronmental inpact Assessment (EIA) Is an inpertant technique for ensuing thatthe likely impacts ota proposed development on the endironment sr kly understood and taken ino accout before such deveopments ae alowed Yo proceed. ‘Tha Envronmertal Quality At (EQ) 1974 was enacted (vith amendments gazed n 1986) © contel an prevent poten 2s well st prec and enhance the quality ofthe ‘ervironment. Under the Environmental Quay (Prescibed Aiviies) (Envronmental Impact Assessrent) Ordor 187, any development categerzod asa prescribed savy ‘requires an EA stu to be undertaken nacenrdanee ote guetines as outined nthe "Handbook of Evironment Impact Assessment Guidelines’ Legal Aspects af tho Project ‘Tho Proliminary EVA Report for the Rawang Town Bypass Hghaay was approved in December 2005 subject various condtons of approval. The original algrment volves the constuction of s new road alignment and upgrading part of he Federal Rout (FR) “Froonment Ae Stn hd a Supplementary Environnentl inact Attest "Baposed Rock Crashing Pat wih tot lenin of 1735 km. One ef the condtons of approval was thatthe approval as paral, Boag en for te norte and suthem upgrading sectons at FR’ and 3.18 km ofthe new agent em the Sa, Cah Ierchango, ‘Subsequent, 2 Suplemortary EIA Repr fr the Proposed New Elevated Algnment in “Taman Wears forthe Fawang Town Bypass Project was submited to the DOE ‘Selangor and approved in March 207, However, due he excessive ante rock production suited fom Basing operation at the ongoing Fhase 2 ~ Rawang Town Bypass Highway ard 2 request fom DOE Selangor va Iter dsied 20" September 2019 (refer Appendix 1), an adctionl Supplamentary EIA Is prepared forthe esabshment of the rock erusing plant to ‘supplement tne previous EIA Raper eppcoved in 2005 and 2007 “The Supplemensry EIAs prepared based on the folowing videos “A andbosk of Environmental impact Assessment Gules publahed bythe ‘Deperment of Envenment Malaya ‘The Suplemonary EIA Report shal conan an assessment of he impacts caused bythe ‘ojets active on the envionment and a descripton of maesaurs that shal be Underaken to preven, euce or cont! headers Impact, any. onthe emionment ‘The Supplementary EIA Repo stall bo submit tothe Deparimert of Environment Selangor apeova. “Enver A Sih BRI Te RAT OTS © acme soto a0 don reneepeg eins a Figure 1.3: Devolopmant Zones Inthe State of Selangor tanger ere PanariaaanRancagan Skt per tte 202) Seal to Tz Totes ann Wee URREA] vebuBNeNT One| 0202 Yomnsiq 0B UES FIM SSS wiiuses ‘ows | 10) BuUoz sep pues simng pasodosd =} aunBig Ss eo ENN MMEVONSUSSNVIYIS 22 Supplementary Environmental inpeet Assessment Proosad Rsk Cran Pant CHAPTER 2 : PROJECT INTIATORICONSULTANT PROJECT PRCPONENT “The Project Proponent forthe proposed project Is Panzana Entepese Sdn Bhd. The oficial arose the Project Proponents PANZANA ENTERPRISE SON BHD ‘Floor, Menara Manulife R2, saln Gelenageng, Damansara Helgi, ‘0400 Kuala ump ‘corte person: En, Ama Artin Kasah Poston Project Manager Faxto, 03-2005 1848 PROJECT CONTRACTOR Panzana Ener Sen Gh has appointed CS Mur Sdn Bhd a the Project Contractor based on tumley concept. As such, the Project Coivactr wil be response forthe ‘overat development ard censtucson ofthe project. Any enqulies wth regard tthe proposed project can be decd to: (6s MULUR SON BHO No. 448, Lorong Sei, Taman Sota Rewang, 48000 Rawang, Selangor. ‘contact person =Mr. Lee Kok Peng Postion Managing Director Tet 03-6002 9209, FaxNo, 03 6082 9289 EIA CONSULTANT ‘The constant commissioned to undertake the Supplementary Environmental impact ‘Assessment study is Envronment Asia Sdn Ghd. The ofl adress Is Ested below. The project team and the task designation ae shown in Table 21. [ENVIRONMENT ASIA SDN BHD 818 Jalan $5222, Damansara Jaya, 47490 Petaling Jaya, Selangor Contact person: Mr. Edward Worg, Postion Managing Deco! Pipa Consultant Tete 09-7722 2088 Fanti, (03-7722 2099 a us 9s ey anon verso Lefer open «| oxmmonn emo | ——_ene°5| wa msn at reins « swauneu09 “amon: | eneoy sony 220 | muses one | » Bey meee — femormmn | _ sey panes oer 2se| _seecues| ‘antwois | vauv Aanis asodous |APSSMNBANS 220083¥9 | nouvourwno awe [oN ri steam sano 9s rion ‘sero mat ‘ano wera) wes foopea - _B voneuIpI009 Palo Suiza 09000 ‘Aven s9eM + va (3404) 258 seammoen | ana va ‘cna gomes ‘Stoo ausson | _aveniormans + oon Seo | smoniimonw 2] samy cass | “toneretaess 2] "Ye | amaze | omnes | SOG OO GRU TROON sesvacreoo | | on sioqwey wee, Komig vig 1871: +2 91961 ‘Sepplamentary Environmental inact Assessment "opasd Raa uty Pat 24 LABORATORY Chor Labortry Sdn Bh! i 2 SANM (Skin Akos! Makmal Malaysia) sccradted laborsory and Fas been appoted to carryout the anaes of wate quali, quay, ‘ose ad vibraten eves, CCHEUVI LABORATORY SON BHO N22 Jalan Sungai lun $292, Nouele Kemuning Indust Pak ‘Buk Rinau,Seksyen 22, 40460 Shah Alem, Selangor Darul Ehsan. CConact person: Mr TA Indean Designaton Tecnica Manager Tet No, 16 7212801 25 OTHER CONSULTANTS “Tha oor consuants involved inthe project areas fotows CConsuiting Engreers_—_KONSULTAN JURUTERA MELOMBONG YEOW (ining Encino ‘SON BHD No.1. Tnghat 4, san 211398, Projk Jeya Indust Estate, {tn le, Jalan Kelang Lama, 59000 Kuala Lumpur Tet 09-7701 4906 Fax:09- 77828267 CConsuting Engreers ARUP JURURUNDING SON BHO (CAS Engines, No. 25-2, Jalan Ara SD 728, Bena 5 Damansera, 2200 Kuala Lump Tek 03-62737223 Fox. 09-279 2227 Surveyor ILHAM UKUR CONSULTANT. No. $3, Jean Cacao 0A, Kota Damansara, 47810 Petaing Jay, Selangr. Tel03-6167 2851 Fax: 09-6167 6725 Blasting Contac UNIBLASTCON SDN BHO No, 36-4, Jalan 862A, Bandar Manalara, Kepon, {52100 Kuale Lumpur Teb0s-62r47108 Fax:03-6274 5108 “En fla SaR BR cy 26 Supplementary Environment! inact Assessment "Boposod Fok Crsting Pot ‘OBJECTIVES VD WORK SCOPE OF THE EIA STUDY ‘The implemenion ofthe proposed project can result n bon benef and adverse Impacts on varus pacts of tha envtenment. The pray objectives of the EA study ‘a therfore to deity the impacts ofthe proposed pojct acs that ae potently Signfean. For sgoficant impacts ofthe proposed project. mligaing measures have been commended where appropiate so at these inpats are minimized o acceptable loves. Any esl impacts of the projec are also dented “To achiove tho cbjcties the werk scope includes a comprehonsiverovow of data rm the government agencies as wel as pushed secondary data avaiable on the existing fervent the immerse vino! the project to assess the possible envionment Impacts ase rst ofthe proposed prec. Sie reconnassance lung surveys on ‘ectlogy and sodo-eeonomy were card aut and envkormentlsamping lor wat, hole and vibration were condicted fo determine Ie basene coon of te exiting ‘mirnment a the propored projet. “The scope of wok inudes the folowing: + Description lhe projet concep components and options + Descipien ef he existing psc, biolgleal and soco-economs envrenment + dentitestonet potential igiioatanveonmentl issues + Assessmento significant environmental impacts + Recommendation of appropriate mitgating and abatement measures ‘SOURCES OF INFORMATION Information fr ‘he EIA study was obained from primary data collected insta end complemented vih secondary data. The primary data was oblained frm sampling and ‘survey cared cut in October 2013 as well as communication and escusion wih ‘vatous government departments and pvaleogarzatens, “Te bl of departentlorganizations is shown below: Dearne Enenmer tan Alan Stan iment of Survey ar Napping (Jabalan Ukur dan Pemeiaan) Depart gna Moya Gnes Patan ioe) ‘Geological and Survey Department Malaysia (Jabalan Mineral dan Gecsains Maya) Deparment Tow and County Planning JsbatanPerancang Bandar dan Dess) Department rigation and Drainage (Jsbatan Pengarsn dan Salan) Publ Werks Department Jabatan Kerja Raya} Foresty Deparment Foresty Malaysia (Jabalan Perhutanen Semenanung Malaysia) 1 Malaysian Netoorlogieal Services (Perthmatan Kajouace Malaysia) Distt of Hu Selangor Local Authority (Mais Daerah Huu Selangor) Secondary dla ncudes © review of all avalable dala confined in publehed or Unpublished documents. The ist of reerences used fe given atthe end f ths rept. Infrmaton is also gatheced from the fd investigation undertaken apart ofthis EU, study and thee rude: “Brot At Bap Bip ‘Supplementary Environmental Impact Assessment ‘Proposed ct Crna 1+ Fold suvey to esess the current economio use ofthe areas ‘Water quaty sampling! anaiyis to assess the present condton ofthe recaing waterway as well a oestabish baseline dats *Airquaty,roise are viraton sampling nd analysis atte proposed project sto nd the nearby senstive recep io establish basse dala + Ecological survey to deity exiting fran faun ofthe area Socio-economic suvey to assess the soci-ecenamic background and community sec ofthe projet ae “Fravoent a an Bg a 32 ‘Supplomentary Environmental Impact Aesersment "Papas Rock Cushing Pa (CAAPTER 3 : PROJECT DEVELOPMENT OPTIONS iwrroouctioy ‘The Frjecteptians comprise the following: 1+ No cevelopnent ara eine asa vacant area with a sma portion of cleared land ‘and pacha of mixed vegetation + Ste epten| + Constcton meth option ‘An assessment ofthe above optons Is made agast the folowing era In order to ‘decd the mastaccapabe option for development ofthe area. These nude 1+ Enveomavtlaccatahity * Soci and wconamie aie In trms of employment oppertunits, social Impacts and cnirisaonta the economy + Land use conpatttty + Relevance government poy and development strategy forthe area “The mers and éemettsof each of the optons are discussed below, No PROJECT OPTION “Te location of fe proposed projects sod win the ROW of tho completed Phase 1 — Rawang Town Bypass Highway. I the proposed project snot care out the Its will ‘remain vacant sa vacant area wth asl pation of cleared land and patches of mixed vegetation, “The project ses stusiod in Muken Sorendsh area, which i ess developed than the nearby town of Rawang. A No Projet elon wil leave th curent ste in its existing Condon ~ vacant area with a smal parton of cleared land and patches of mixed ‘vogolton with ro advantages. If te °No-Proje option is chosen tho ste ha fale to {ake advantage ofthe potential economic gro o be a commercially viable ares. The ‘ea wil become an area of stagnant economic growth and notin tandem, wih the ‘pected burgeoning economic and commercial development of he Sate “Tho "No-Projec option could algo mean hat the Government an State would potently ‘ose any econoricretums that they might be able to generate fom investor, both eal end teen. “The consequence from his option wil nevably lead to the loss of urban progress fram bah the economic and social aepeets. Opportunites rom urban regress in tho form oF ‘employment op2aruniies and revenue genetaten to the local emmunty ar sate ‘government wi be fst. Downstream benefis generated by the construction sector wil also be negad. Although the"Ne-Projct Option wilremeve th pessby of sigaicant ‘change for now, his does not guarantee the le wl remain undevelepes in he ute, “Te ergo impltions othe “No Proj Optlon shoul alo be ikon In coniration. It the “No-Projer option is choson, Panzana Earpise Sén Bhd wil have to wanspot cut ‘he blasted grate rocks andor to source aggregate from the existing quates inthe “Frivonment Ae SBI a3 a4 ‘Sepplamentary Environments rps Assessment Proposed Rect Crshn Pont \cinty of Mk Serena or Hulu Selangor Distt o further afl. This opin would Increase the erirnmenial mpats at those quares, accantate the impacts of Increased heaw veticle movement, inresse haulege dstances, exalts prec costs ‘and delay the Phase 2 ~ Rawang Town Bypass Highway projet sire oPrions, ‘The citria that was applied te the secon of a sutabie sieinclaes the elerrant of land use compat, he avalably of good inastucture sucha proper access othe se, Based on he above, ho proposed sta within the ROW of the competed Phase 1 = FRewang Town Bypass Hihiay was considered, Rock Crushing Plant Siting Option “Tha sto secon pronase was eatin it hy Panvana Fearn Sn lb and te ‘Sdn Bhd using engroeing ard economic crea for evaluating potential tee. The present sit a he completed Phase 1 ~ Ravang Town Bypass Highvay was selected cause it was found sutabo forthe purpose of dtlring rock materia fr the Phase 2~ Ramang Tou Bypass Highvay dv ote folowing reasons: 1+ The qusly ofthe rock depos isn accordance wth the standard speciation for ‘a6 consti, +The volume th rock deposit is suc: fr th Phase 2 Rawang Town Bypass hay project. +The ecaton of te proposed rock crushing plant provides good economic telus in respecte hang tance. + Most practic and cstofectve, + Current ian use of he sti not itenive ‘More important, te leaton of he proposed proect has been decided by the Jabatan esa Raya (KF) Malaysia, the Projct Propenert for tho entre Rewang Town Bypass Highway. ‘CONSTRUCTION METHODS OPTION ‘Tho present constuction method forthe project se wil be to develop the requrad Inrastuctres comprising of erinage, "water reteulaion, toot light, {elecommuricaton ducing and utils (electety and water supply, te) forthe projet ‘site. The consrcon phase ofthe project erly involves mobilization of abou, equiement ‘and machineries the prolet ste, The exiting land has been prepara and eval for ‘he Rawang Toon BypaesFaghnay belo CS Mujr Sdn Bhd takes over possession of the ie. Therefoe, na earthworks vil be cared out these “Envios SinBRI a

You might also like