Track Structure.52 KG On 03.08.09-Model

The document shows a diagram of a reinforcement concrete beam with dimensions and notes. Key details include: - The beam is 1676mm long with steel angels and holes for reinforcement. - It includes elastic rail clips, grooved rubber pads, and epoxy levelling layers. - Notes specify materials and proportions to be used for priming, levelling layers, and inserting components like tracks. - Dimensions are in millimeters and synthetic resins are recommended for bonding and grouting layers.

Uploaded by

Bright India
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views1 page

Track Structure.52 KG On 03.08.09-Model

The document shows a diagram of a reinforcement concrete beam with dimensions and notes. Key details include: - The beam is 1676mm long with steel angels and holes for reinforcement. - It includes elastic rail clips, grooved rubber pads, and epoxy levelling layers. - Notes specify materials and proportions to be used for priming, levelling layers, and inserting components like tracks. - Dimensions are in millimeters and synthetic resins are recommended for bonding and grouting layers.

Uploaded by

Bright India
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1676mm

67mm GAUGE FACE GAUGE FACE


52 Kg. RAIL RAIL LEVEL RAIL LEVEL 52 Kg. RAIL

LINER LINER

156mm

156mm
ELASTIC RAIL CLIP ELASTIC RAIL CLIP

SGCI INSERT 10mm TH. GRP (GROOVED RUBBER PAD) 10mm TH. GRP (GROOVED RUBBER PAD) SGCI INSERT
TO BE PROVIDED THROUGHOUT THE TO BE PROVIDED THROUGHOUT THE
LENGTH OF BEAM LENGTH OF BEAM
CONTINUOUS EPOXY CONTINUOUS EPOXY
M.S.ANGEL M.S.ANGEL
LEVELLING LAYER(15mm TH.) LEVELLING LAYER(15mm TH.)
25 x 25 x 5mm
TOP OF BEAM TOP OF BEAM

15

15
M.S.ANGEL M.S.ANGEL
120mm

120mm
460mm 460mm

203mm HOLE 65X45X120mm DEEP HOLE 65X45X120mm DEEP 203mm


M.S.ANGEL M.S.ANGEL

65mm 65mm
75mm 75mm M.S.ANGEL M.S.ANGEL 75mm 75mm
HOLE 65X45X120mm DEEP HOLE 65X45X120mm DEEP
REINFORCEMENT CONCRETE BEAM REINFORCEMENT CONCRETE BEAM

610mm 610mm

M.S.ANGEL SECTION OF BEAM M.S.ANGEL M.S.ANGEL SECTION OF BEAM M.S.ANGEL


NOTES:-
1. AFTER PROPERLY CLEANING THE TOP OF BEAM PRIMING COAT ARE TO BE APPLIED
OVER THE BEAM BY M/s. HUNTMANA'S ARALDITE GY 257 & HY 840 IN THE PROPORTION
TRACK HOPPER OF 100 : 50 BY WEIGHT OR ANY OTHER SUITABLE RESIN COMPOSITION SHALL BE USED.
2. THE RECOMMENDED THICKNESS OF EPOXY LEVELLING LAYER SHALL BE MINIMUM 15mm.
3. FOR THE LEVELLING LAYER M/s HUNTMAN'S ARALDITE GY 257 HARDNER HY 840, HY 960 &
QUARTZ SAND MIX. No. 10 IN THE PROPORTION OF 100 : 50 : 2 : 850 BY WEIGHT OR
ANY OTHER SUITABLE RESIN COMPOSITION SHALL BE USED.
4. THE INSERT SHALL BE GROUTED IN THE POCKET OVER THE BEAM USING RESIN MORTAR WITH M/s HUNTMAN'S
ARALDITE GY 257 HARDNER HY 840, HY 960 & QUARTZ SAND MIX No. 10 IN THE PROPORTION
OF 100 : 50 : 2 : 400 BY WEIGHT OR ANY OTHER SUITABLE SYNTHETIC RESIN COMPOSITION.
5. ALL DIMENSIONS ARE IN MILLIMETRES.
96

96
65 65 6. SEALING COAT TO BE APPLIED OVER THE EPOXY LEVELLING LAYER THROUGHT OUT BY
M/s. HUNTMEN'S ARALDITE GY 257, HY 840, HY 960 IN THE PROPORTION OF 100 : 50 : 2 BY WEIGHT OR
ANY OTHER SUITABLE SYNTHETIC RESIN COMPOSITION.
45

45
HEIGHT OF 52 KG RAIL = 156mm
ARRANGEMENT OF POCKETS THICKNESS OF G. R. PAD = 10mm
OVER THE BEAM THICKNESS OF EPOXY LAYER = 15mm

181mm
HEIGHT FROM TOP OF BEAM TO TOP OF RAIL LEVEL = 181mm.

1743.3mm CENTRE TO CENTRE OF BEAM / RAIL


600

600

Sd/ Sd/ Sd/


Dy. G M ( D & S ) Dy. G M ( C ) GM(P)
600

600
203 203 RITES / KOLKATA RITES / KOLKATA RITES / KOLKATA

STANDARD DRAWING
65 65 TYPICAL CROSS SECTION
OF
45

45

RAIL ARRANGEMENT OVER


96

96

TRACK HOPPER WITH 52 KG RAIL.


Drg,
SCALE RITES/KOL/STANDARD-1186/09
No.
Sh.
No
N. T. S
Date RITES LIMITED
( A GOVT. OF INDIA ENTERPRISE )
REV.
PROJECT CODE :-
No.