Camarines Norte State College
Daet, Camarines Norte
Name: FLORES, EARL JOSIAH BABAGAY Period: 2nd Semester, SY 2021 - 2022
ID No: 18-1324 Course/Yr: BSCE 4 Date: January 14, 2022
Code Subject Description Units TF Lab Schedule Section
T68 CE 113 CE Project 2 2.0 2.0 1.0 1-3 pm TTh COENG-COMLAB BSCE 4B
T69 CE 114 Construction Methods and Project 3.0 3.0 0.0 11 am-12:30 pm MW EB206 BSCE 4B
Management
T70 CE 115 Quantity Surveying 2.0 2.0 1.0 8-10 am TTh EB206 BSCE 4B
T71 CE TRK 1 - 103 Structural Engineering 3 (Design of Steel 3.0 3.0 0.0 3:30-5 pm TTh EB206 BSCE 4B
Structures)
T72 CE TRK 1 - 104 Structural Engineering 4 (Foundation and 3.0 3.0 0.0 8-9:30 am MW EB206 BSCE 4B
Retaining Wall Design)
T73 CE TRK 1 - 105 Structural Engineering 5 (Computer 3.0 3.0 0.0 9:30-11 am MW EB206 BSCE 4B
Softwares in Structural Analysis)
T74 CE REV Civil Engineering Review 5.0 5.0 0.0 3:30-6 pm MW EB206 BSCE 4B
Total Units: 21.0 21.0 2.0
Assessment Amount Total
Tuition Fees
Tuition Fee 21 x 125/unit 2,625.00 2,625.00
Laboratory Fees
Engineering Laboratory 2 x 100/subject 200.00 200.00
Miscellaneous Fees
Athletic Fee 150.00
Library Fee 150.00
Medical Fee 25.00
Dental Fee 25.00
Guidance Fee 30.00
Matriculation Fee 100.00
Student Services Enhancement Fund 1,000.00
Student Development Fee 75.00
Student Resource Fee 500.00
Student Council Fee 10.00
Miscellaneous Fee 25.00
Culture and Arts Fee 50.00
Publication Fee 75.00
Graduation Fee 1,425.00 3,640.00
Total Assesssment 6,465.00
Discounts/Scholarships:
Free Higher Education : 6,465.00
Total Discounts/Scholarships 6,465.00
Discounted Assessment 0.00
Summary Amount Total Payment Schedule Amount Total
Current Assessment 6,465.00 Down Payment 0.00
Discounts/Scholarships (6,465.00) Prelim 0.00
Previous Balance 0.00 Midterm 0.00
Current Receivable 0.00 Final 0.00 0.00
OFFICIALLY ENROLLED
**This is a system-generated document, signature is not required.**
Processed by: Renato A. Canaria - 01/24/2022 Page 1 / 1