Ibb Mcup & Modification of K-12 Building: Safco/Ibb Mobile Coating Unit Poject
Ibb Mcup & Modification of K-12 Building: Safco/Ibb Mobile Coating Unit Poject
Doc No       003
                       SAFCO/IBB MOBILE COATING
                                                                              Rev. No.     00
                              UNIT POJECT
                                  ITP FOR CONCRETE                            Date         25th Jun, 2020
                                                                              Page         1 of 21
XX
                No Part of this document or the information it contains may be reproduced or transmitted in any
                 form or by any means electronic or mechanical, including photocopying, recording, or by any
                 information storage and retrieval system, without permission in writing from SABIC or NCC
                                      EPM-ITP-CC-
                           Doc No     003
SAFCO/IBB MOBILE COATING
                           Rev. No.   00
       UNIT POJECT
     ITP FOR CONCRETE      Date       25th Jun, 2020
                           Page       2 of 21
                                                                                                    EPM-ITP-CC-
                                                                                      Doc No        003
                        SAFCO/IBB MOBILE COATING
                                                                                      Rev. No.      00
                               UNIT POJECT
                                    ITP FOR CONCRETE                                  Date          25th Jun, 2020
                                                                                      Page          2 of 21
TABLE OF CONTENTS
4.0 Checklist-Backfill/Compaction.....................................................................................................8
                                                                                                                                                                               Inspection Responsibility
  Sr.                                                                                                                 Acceptance          Verifying                Sub-
                      Inspection Activity                Characteristic Verified (4)   Reference Document (5)
  No                                                                                                                  Criteria (6)       Document (7)         Contractor           CONTRACTOR                COMPANY
                                                                                                                                                               /Vendor
                                                                                                                                     Approved
                                                                                                                SES-B51-S01
  1.2   Concrete Trial Mix approval                   Concrete Strength                SES-B51-S01                                   Document/                      I                       H                    H
                                                                                                                IFC Drawings
                                                                                                                                     Lab Test Report
                                                                                                                                                                                                                            B
                                                                                                                               Doc No         EPM-ITP-CC-003
                                                                                                                                                               Inspection Responsibility
Sr.                                                                                                         Acceptance           Verifying         Sub-
                   Inspection Activity          Characteristic Verified (4)   Reference Document (5)
No                                                                                                          Criteria (6)       Document (7)   Contractor           CONTRACTOR              COMPANY
                                                                                                                                               /Vendor
                                                                                                       Manufacture
                                                                              Manufacture Compliance
                                                                                                       Compliance
                                             As per inspection items          Certificate,
1.3   Material Receiving Inspection                                                                    Certificate,         CV-MRI-1                I                     W                  R
                                             in the Checklist of QVD          Material Receiving
                                                                                                       Material Receiving
                                                                              Inspection Report
                                                                                                       Inspection Report
2 Earth Work
7     Embedded Item, Lifting Lug             As per inspection items          SES-B51-S01              SES-B51-S01          CV-002-4                I                     W                  W
                                             in the Checklist of QVD          SES-C03-S01              SES-C03-S01
                                                                              SES-C01-F01              SES-C01-F01
                                                                                                                                     Doc No         EPM-ITP-CC-003
                                                                                                                                                                     Inspection Responsibility
Sr.                                                                                                                Acceptance          Verifying         Sub-
                  Inspection Activity                   Characteristic Verified (4)   Reference Document (5)
No                                                                                                                 Criteria (6)      Document (7)   Contractor           CONTRACTOR              COMPANY
                                                                                                                                                     /Vendor
                                                                                                               SES-B50-F01
                                                                                      SES-B50-F01
                                                                                                               IFC Drawings
                                                                                                               SES-B51-S01,
                                                     As per inspection items          SES-B51-S01,
8     Release for Concrete Pouring                                                                             SES-B50-F01        CV-002-4                I                     W                  W
                                                     in the Checklist of QVD          SES-B50-F01
                                                                                                               IFC Drawings
                                                                                                               SES B51-S01
13    Compressive strength of Concrete               Concrete Strength                SES B51-S01              Approved Mix       Lab Test Report         I                     W                  SW
                                                                                                               Design
                                                                                                                                                                             Inspection Responsibility
   Sr.                                                                                                               Acceptance           Verifying              Sub-
                     Inspection Activity                 Characteristic Verified (4)    Reference Document (5)
  No                                                                                                                 Criteria (6)      Document (7)         Contractor           CONTRACTOR              COMPANY
                                                                                                                                                             /Vendor
Legend
(1) ‘Prepared by’ should be the name, signature and COMPANY’s name for the Vendor’s/Sub-Contractor’s representative.
(2) ‘Approved by’ should be the name, signature and COMPANY’s name for the CONTRACTOR’s representative.
(3) ‘Location’, ‘Item Name’ and ‘Tag Number’ shall be used if applicable.
(4) ‘Characteristics Verified’ are the parameters checked during the inspection activity.
(5) ‘Reference Document’ is the Project Specification / Code / Standard / Drawing, Procedure etc. on the basis of which inspection shall be conducted.
(6) ‘Acceptance Criteria’ is the tolerance, reading, value or an outcome derived from reference documents.
(7) ‘Verifying Document’ is the record generated during inspection & Testing using approved forms / checklists.
(8) ‘Inspection Responsibility’ is the role of Vendor / Sub-Contractor, CONTRACTOR and COMPANY for each inspection step. Inspection responsibility shall be ‘I’ for Inspection, ‘R’ for review, ‘A’ for approval, ‘S’ for
     Surveillance, “W’ for 100% Witness, ‘SW’ for random witness and ‘H’ for hold.
                                                                               EPM-ITP-CC-
                                                                 Doc No        003
                    SAFCO/IBB MOBILE COATING
                                                                    Rev. No.   00
                           UNIT POJECT
                           ITP FOR CONCRETE                      Date          25th Jun, 2020
                                                                 Page          6 of 21
1 Material Type
2 Supplier
                           □ Satisfied
  5    Visual Inspection
                           □ Unsatisfied
6 Remarks
 Submitted by:
 Review and approval Status:
 □ (A) Approved without comments.
 □ (B) Approved with comments.
 □ (C) Disapproved.
 Comments:
Name
Signature
          Date
                                                                                     EPM-ITP-CC-
                                                                       Doc No        003
                      SAFCO/IBB MOBILE COATING
                                                                       Rev. No.      00
                             UNIT POJECT
                              ITP FOR CONCRETE                         Date          25th Jun, 2020
                                                                       Page          7 of 21
                                                                                                   CV-002-1
           FIELD SURVEY FOR EXCAVATION                                                    Record
                                                                                            No
                                                                                           Date
   Project No:      PROJECT NO. : SP-173100119                                Area No.
    Location         IBB/SAFCO
   Description
                                  Point                   Coordinate
                                                                                                      Remark
                                   No.             N                      E
Name
Signature
                   Date
                                                                          EPM-ITP-CC-
                                                              Doc No      003
                    SAFCO/IBB MOBILE COATING
                                                               Rev. No.   00
                           UNIT POJECT
                           ITP FOR CONCRETE                   Date        25th Jun, 2020
                                                              Page        8 of 21
4.0 Checklist-Backfill/Compaction
                                                                                        CV-002-2
                                                                                    Record
      BACKFILL/COMPACTION CHECKLIST                                                 No
                                                                                      Date
Project No           PROJECT NO. : SP-173100119                   Area No.
Material Type                                                      Drawing No.
Compaction                                                         Optimum
Equipment                                                          Moisture
Field Test
                                                                   Proctor Density
Equipment
Location               IBB/SAFCO
Description
     Examination Items           Result               Examination Items                   Result
Keep cleaning without                                                                  Satisfied
                               Satisfied
water, roots, trash, other                  Fill material test Reports filed           Unsatisfied
                               Unsatisfied
foreign materials                                                                      N/A
                               Satisfied                                              Satisfied
Coating protection filler
                               Unsatisfied Properly moistened before placing          Unsatisfied
board installed properly
                               N/A                                                    N/A
                               Satisfied
Material comply with                                                                  ≧90%
                               Unsatisfied Compacted Density
specification                                                                         ≧95%
                               N/A
Bottom Bed/Backfill Depth        200 mm           Total Layer of Compaction                   2
                                     Layer Density Test (Points)
 Laye Thick Repor  1st    2nd    3rd     4th     5th     6th     7th 8th    9th
                                                                                                  Result
 r No. (mm) t No. Densit Densit Densit Densit Densit Densit Densit Densit Density
                    y      y      y      y       y        y      y   y
  1                                                                                           Sat.  Unsat.
  2                                                                                           Sat.  Unsat.
  3                                                                                           Sat.  Unsat.
  4                                                                                           Sat.  Unsat.
  5                                                                                           Sat.  Unsat.
  6                                                                                           Sat.  Unsat.
  7                                                                                           Sat.  Unsat.
  8                                                                                           Sat.  Unsat.
Name
Signature
          Date
                                                                                EPM-ITP-CC-
                                                                  Doc No        003
                      SAFCO/IBB MOBILE COATING
                                                                   Rev. No.     00
                             UNIT POJECT
                             ITP FOR CONCRETE                     Date          25th Jun, 2020
                                                                  Page          9 of 21
Drawing No.
     Location
    Description       IBB/SAFCO
Test Reports
                                                                              Inspection Results
Ite                                                                 Sub Cont.                     NCC
                        Description of Check
m
                                                                 Accept       Reject      Accept       Reject
1       Compaction and surface preparation verified
2       Survey reports Verified
3       Mix design of lean concrete verified
4       Fresh concrete test are conducted and sample taken
5       Thickness and level of lean concrete is as per drawing
6       Continuous curing as per specification
7       Concrete test results are filed
        Use concrete strength equal or higher than 17Mpa for
8
        Lean Concrete
NOTES:
Name N/A
Signature N/A
             Date                      N/A
                                                                                            EPM-ITP-CC-
                                                                                Doc No      003
                        SAFCO/IBB MOBILE COATING
                                                                                 Rev. No.   00
                               UNIT POJECT
                                       ITP FOR CONCRETE                         Date        25th Jun, 2020
                                                                                Page        10 of 21
 C. Reinforcement
  Grade
  Size/Type
  Spacing/Splices
  Spacers
  Tying every intersection of rebars
  Clearance
                                                                                                 Inspection Results
 Item                              Description of Check                                     Sub Cont.            NCC
                                                                                         Yes          No     Yes   No
 1.0       Concrete Delivery
 1.1       Sub-contractor ready to place
 1.2       Delivery ticket correctly completed
 1.3       Correct mix concrete received
 2.0       CONCRETE TESTING
           Slump test, temperature, air content and unit weight checks have been
 2.1
           carried out and are within the specified tolerances
 2.2       Specified number test cylinders/cubes taken
 3.0       CONCRETE PLACEMENT
           Method of placement :
 3.1
           Crane and bucket  Chute Pump
 3.2       Pouring height maintained to avoid NCCregation
 3.3       Correct size of vibrator(s) together with back-ups on location
           Compaction / vibration is in accordance with the specified requirements:
 3.4       - vibration carried out around reinforcement and embedment
           - penetration into previous layer
 4.0       CONCRETE FINISH
           Brushed                   Hand float     
 4.1       Rough                     Power float 
           Steel Trowel 
Remarks:
NOTES :
Name
Signature
          Date
 Note: Verify delivery ticket and attach the relevant fresh concrete placement log to this form
                                                                                                           Doc No              EPM-ITP-CC-003
                                                                                       CV-002-7
        CONCRETE CURING RECORD                                              Record No
                                                                              Date
    Project No           PROJECT NO. : SP-173100119                      Area No
     Location                          IBB/SAFCO                       Drawing No.
    Description
                                                                       Pouring Date
  Curing Method                    WATER CURING
                                                                       Curing End
                                                                          Date
                                           Curing Record
                                                                                    NCC         Inspector
                                                                                             Result
  No.             Date              Time         Person of Curing/Signature
                                                                                   Accept         Reject
                                                                                        CV-002-8
     INSPECTION RECORD FOR LEAK TEST                                       Record No
                                                                               Date
 Location                                                              Drawing
Description                        IBB/SAFCO                             No.
START FINISH
           Test
        Date &Time          Date:                      Date:
                                Time: ______:______            Time: ______:______
Remarks:
Remarks:
Name
Signature
Date
                                                                               CV-002-9
                 RECORD OF COATING                                 Record No
                                                                        Date
Material
                                                                     □ Satisfied         □ Satisfied
                                Remove any oil, grease and wax       □ Unsatisfied       □ Unsatisfied
                                                                     □ Satisfied         □ Satisfied
A. Preparation of Surface       Ensure the surface is dry            □ Unsatisfied       □ Unsatisfied
                                                                     □ Satisfied         □ Satisfied
                                Pinhole and crack repaired           □ Unsatisfied       □ Unsatisfied
                                                                     □ Satisfied         □ Satisfied
                                1st Coat (DFT Test) > _______        □ Unsatisfied       □ Unsatisfied
                                m
B. Thickness of Coating                                              □ Satisfied         □ Satisfied
                                2nd Coat (DFT Test) > _______        □ Unsatisfied       □ Unsatisfied
                                m
Name `
Signature
Date
                                                                                          CV-002-10
  ACCEPTANCE CERTIFICATE CIVIL WORKS                                                 Record
                                                                                      No
                                                                                      Date
      Location                                                                Drawing
     Description                                                                No.
                                                                Sub-contractor       NCC
                    REQUEST INSPECTION                         Accepte Rejected Accepte Rejected
                                                                  d                d
1.Excavation checked
9.Coating checked
Name
Signature
Date