Sprinkler Relocation Quotation Summary

The document is a quotation for relocating sprinklers at Ayala Tower One Unit 803. It provides a breakdown of costs for mobilization, engineering works, relocating 9 sprinkler heads, pipes, fittings, hangers, consumables, draining and charging the system, testing and commissioning, and labor. The total cost is 93,604 PHP including VAT. The work is scheduled to be completed within 3 calendar days of receiving payment and approval, and there is a 1-year warranty on parts.

Uploaded by

Vicente Avisado
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views5 pages

Sprinkler Relocation Quotation Summary

The document is a quotation for relocating sprinklers at Ayala Tower One Unit 803. It provides a breakdown of costs for mobilization, engineering works, relocating 9 sprinkler heads, pipes, fittings, hangers, consumables, draining and charging the system, testing and commissioning, and labor. The total cost is 93,604 PHP including VAT. The work is scheduled to be completed within 3 calendar days of receiving payment and approval, and there is a 1-year warranty on parts.

Uploaded by

Vicente Avisado
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

RELOCATION OF SPRINKLERS AT AYALA TOWER ONE Unit 803

CLIENT UNIT 803


ATTENTION Carlos Oreta
DATE 23-Jul-19
ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST
A. PRELIMINARIES
Mobilization / Demobilization 1 lot 3,000.00 3,000.00
Engineering Works, As-built Drawings and Documentations 1 lot 10,000.00 10,000.00

B.1 RELOCATION OF SPRINKLERS @ Ground Floor


RELOCATED SPRINKLER AND ADDITIONAL HEAD (UPRIGHT) 9 PCS. 630.00 5,670.00

PIPES AND FITTINGS


90 DEG. ELBOW 25 MM. DIA. 27 PCS. 142.50 3,847.50
Elbow Reducer (25X15) 7 PCS. 142.50 997.50
Elbow Reducer (25X15) 2 PCS. 112.50 225.00
Tee 25 20 PCS. 238.00 4,760.00
25MM.DIA.PIPE 2 LGS 1,575.00 3,150.00

HANGERS
LOOP HANGERS 50 MM. DIA. 27 PCS. 75.00 2,025.00
THREADED ROD 10 MM. DIA. 10 LGS. 165.00 1,650.00
EXPANSION Shield 50 PCS. 22.50 1,125.00
BOLT, NUT AND WASHER 75 PCS. 15.00 1,125.00

CONSUMABLES 1 LOT 8,000.00 8,000.00


DRAINING AND CHARGING OF SPRINKLER SYSTEM 1 LOT 5,000.00 5,000.00
TESTING AND COMMISSIONING 1 LOT 3,000.00 3,000.00
LABOR AND SUPERVISION 1 LOT 30,000.00 30,000.00

SUB-TOTAL (VAT EXCLUSIVE) 83,575.00


PLUS 12% VAT 10,029.00
GRAND TOTAL (VAT INCLUSIVE) 93,604.00
*** Delivery Schedule of the Equipment
3 - 4 day upon receive of Purchase Order or Notice to Proceed and the Down Payment

*** Work Schedule

The work start seven (5) days after receive of Purchase Order or Notice to Proceed and Down Payment from the Client. Work shall be
completed within 3 (3) calendar days, depending on the availability of the area.
*** Warranty:
One (1) year warranty that all parts and related furnished are in good quality, suitable for intended purpose and free from inherent
defects in design, materials and workmanship.
Warranty shall not cover any damage of materials or equipment caused by accident, misuse, unauthorized modification or repair by
the client.

We thank you for giving us the opportunity to quote on your requirement and hope to receive your most valued order soon.

Very Truly Yours, Conforme:

___________________
Abelyn Rogon Client
BUH-Fire Date:
cc:engg/logistics/mktg