This document provides a job safety analysis and risk assessment form for HVAC work. It lists the job steps which include mobilization of workers, toolbox meetings, and pre-work preparation. Hazards associated with each step are identified such as driving, falling from vehicles, and using inappropriate work tools. Risk levels are analyzed and recommendations are provided to control the risks, such as obeying traffic signs, ensuring skilled workers, and bringing appropriate tools for the work. The form documents the attendance of the JSA preparation meeting and requires review and approval signatures.

Uploaded by

ogyrisky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views14 pages

26071-100-GPP-GCX-00131 - Method Statement For Installation Plumbing Works - 00D

This document provides a job safety analysis and risk assessment form for HVAC work. It lists the job steps which include mobilization of workers, toolbox meetings, and pre-work preparation. Hazards associated with each step are identified such as driving, falling from vehicles, and using inappropriate work tools. Risk levels are analyzed and recommendations are provided to control the risks, such as obeying traffic signs, ensuring skilled workers, and bringing appropriate tools for the work. The form documents the attendance of the JSA preparation meeting and requires review and approval signatures.

Uploaded by

ogyrisky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

X

Avinash Joshi
X

Avinash Joshi
X

Avinash Joshi
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

JSA No. : RDMP / JSA /


JSA Title : HVAC WORK

ATTENDANCE LIST – JSA PREPARATION


NO NAME POSITION COMPANY SIGNATURE
1 Kim Byoung Oh Construction Manager PT. ETI-HVAC

2 Saharuddin HSE Coordinator PT. ETI-HVAC

3 Gun Gun Kamaludin Foreman Plumbing PT. ETI-HVAC

4 Hafidz Sabtari Rifai’i Quality Control PT. ETI-HVAC

5
6
7
8
9
10
11
12
13
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

Company : ETI HVAC Prepared By Review by Approved by


Project : RDMP JO Balikpapan SPV Chief/MGR HSE CM
Person in charge name : NAME
Position/ Title job : Site Manager
Job activity : JSA Plumbing SIGNATURE
Area :
Date : DATE

Status Status
NO Permit Registry No Open √ Close √
NO Permit Registry No
Open √ Close √

Sequence of Basic Consequence / Risk Assessment* Result Risk*)


Hazard Risk Recommendation action
NO Job Steps severity
Bahaya Resiko PR SV RR Tindakan Pengendalian PR SV RR
Tahapan pekerjaan Akibat
1. Mobilizaion of - Driving with - Crashing - Injuried 3 3 M - Obey traffic Sign 2 2 L
worker operational vehicle Tertabrak Pekerja Patuhi rambu lalulintas
Mobilisasi Pekerja Berkendara dengan Cidera/terluka - Have Driving License
kendaraan - Fall from Driver harus memiliki
operasional vehicle - Obstructed work SIM (Surat Ijin
Terjatuh Pekerjaan Mengemudi)
terhambat - Using safety belt when
- Damaged drive
vehicle
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

Kendaraan rusak Pastikan sabuk


pengaman terpasang
- Vehicle Inspection
before drive
Periksa kendaraan
sebelum dioperasikan
2. - Toolbox Meeting - Miss - Miss - Not understand of 3 3 M - Give the information of 2 2 L
Toolbox Meeting communication understanding the work work accurate
Miss Komunikasi the information Tidak mengerti Pemberian informasi
Salah pekerjaan yang /materi sesuai dengan
memahami akan dilakukan pekerjaan yang akan
informasi yang dilaksanakan
diberikan - Work hampered - Skilled worker
Pekerjaan Pekerja harus memiliki
terhambat keahlian
- Used PPE Requirement
Menggunakan APD
yang sesuai
3. Pre work (Persiapan Pekerjaan)

a. Preparing tools and - Mobilization tools - Work tools - Work hampered 3 3 L - Bring appropriate work 2 2 L
Equipments and equipments to damage Pekerjaan Tools/equipment
Persiapan Peralatan site Peralatan kerja terhambat Bawa peralatan dan
Kerja Mobilisasi rusak perlengkapan kerja
peralatan kerja ke - Inappropriate sesuai dengan
site work tools pekerjaan yang akan
Peralatan kerja dilakukan
tidak sesuai - Re Check work
Tools/equipment Need
Pastikan dilakukan
pemeriksaan terhadap
semua kebutuhan
peralatan kerja
dilapangan
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

b. Inspection work - Work - Work - Work hampered 3 3 M - Make sure 2 2 L


tools/equipment tools/equipment tool/equipment Pekerjaan tools/equipment
Pemeriksaan damage operation failure terhambat running well
peralatan kerja / Peralatan kerja Alat kerja gagal Pastikan semua
mesin kerja dan lain rusak beroperasi peralatan kerja bekerja
lain - Work equipment - Indicator dengan baik
system does not tools/equipment - Make sure the indicator
operate not working working
System pada Indicator pada Periksa semua indicator
peralatan kerja peralatan kerja pada mesin berjalan
tidak beroperasi tidak berfungsi sesuai fungsinya
- Bring work
tools/equipment as
needed
Membawa peralatan,
kerja yang dibutuhkan
- Operator/worker must
have skills
Operator alat harus
yang memiliki lisensi
atau bersertifikat atau
yang sudah terbiasa
menggunakan peralatan
kerja
- Prepare fire extinguiser
Sediakan APAR
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

c. Socialization to - Miss information - Misunderstood - Work stopped 3 3 M - Coordinating with 2 2 L


related parties Informasi yang information Penyetopan related parties
Koordinasi dengan disampaikan tidak Salah pekerjaan oleh Melakukan koordinasi
pihak terkait akurat memahami warga atau pihak kepada pihak terkait/
informasi terkait pemberi pekerjaan
- Provide accurate and
correct information
Memberikan informasi
yang benar dan akurat

4. (Pelaksanaan Pekerjaan)

Scaffolding
a. a - prepare - Ergonomics - Fatigue 3 3 M - Coordinating with 2 2 L
Installation
a scaffolding to area Ergonomi Kelelahan related parties
Instalasi Scaffolding installation Melakukan koordinasi
mempersiapkan - Scaffolding - Injury kepada pihak terkait/
scaffolding di area falling down Cedera pemberi pekerjaan
pemasangan. Scaffolding
ambruk/terjatuh - Provide accurate and
- Scaffolding assembly correct information
must have the - Hand Pinched Memberikan informasi
procedure from the Tangan terjepit yang benar dan akurat
factory pada saat
Pemasangan pemasangan - PPE Mandatory
(f,safetyhelm,full body
scaffolding harus
harness)
memiliki procedure - Falling down
dari pabrik. from scaffolding APD wajib digunakan
Terjatuh dari (sarung tangan , full
scaffolding body harness)
saat instalasi.
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

b. Pipe Instalation - mark the area to - Ergonomics - Ergonomics 3 3 M - PPE Mandatory (face 2 2 L
Instalasi pipa install the pipe Ergonomi Ergonomi mask,safetyhelm,
menandai area gloves, Safety Glass)
untuk di instal APD wajib digunakan
- drilling the wall to - Ihaling dust - respiratory (pelindung wajah,
install menghirup disorders masker wajah, sarung
hanger/support debu. Gangguan tangan , serta kaca
installation with pernafasan mata)
handgrinder. akibat debu
Mengebor dinding - Splash in the
untuk install eyes
gantungan.. Mata terkena
- Cutting pipe percikan - eyes irritation
Memotong pipa pemotongan Iritasi mata
dengan
menggunakan
gerinda
- Instalation
Instalasi pipa di - cement spill
dinding Tumpahan
semen
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………
c. - Manual Handling - Material lifting - Muscle injury - Cause paralysis 3 3 M - Bend your knees and 2 2 L
Pengangkatan exceeds capacity Cidera Otot, Dapat squat position
Manual Pengangkatan keseleo serta mengakibatkan Tekuk lutut, posisikan
manual melebihi gangguan sendi kelumpuhan jongkok
kapasitas dan tulang - Work hampered - Keep your body stable
Pekerjaan to move
terhambat Jaga kestabilan tubuh
untuk bergerak
- Head straight and look
ahead
Pastikan kepala tegak
dan pandangan kedepan
- Ligting does not exceed
capacity
Pastikan tidak
mengangkat melebihi
kapasitas
- Used PPE requirement
Gunakan APD yang
sesuai

5 Housekeeping Bad Housekeeping - Hit by material - Injuried 3 3 M - Tidy up work equipment


Membersihkan area Housekeeping yang Tertimpa Pekerja terluka - Rapikan peralatan kerja
kerja buruk material dan cidera dengan baik dan sesuai
- Slip on - Lost work pada posisinya
Tergelincir Equipment - Tidy up from Used
Peralatan kerja Material
ada yang Bersihkan area kerja
tertinggal /hilang dari material sisa
- Messy work pekerjaan
location Environment clean
Lokasi kerja
- Berantakan
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

Risk Rangking (RR) Recommendation Action


Probability (PR) Severity / consequence Tingkat Risiko Tindakan Pengendalian
x =
Kemungkinan Keparahan
Score Level Tingkat pengendalian Hierarchy of Control
Frequent =5 Catastrophic =5 19-25 Extreme high E= 1+2+3+4+5 1= Elemination
Probable =4 Major =4 13-18 High H= 3+4+5 2= Substitution
Occasional = 3 Moderate / Serious = 3 6-12 Medium M= 4+5 3= Engineering Control
Unlikely =2 Minor =2 1-5 Low L=5 4= Administration
Improbable = 1 Negligible =1 5= PPE
Note : * : Without Control / Tanpa control
*) : With Control / Dengan control
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

ATTEDANCE LIST - JSA SOCIALIZATION


Signature
No Name Position Company
Date: Date: Date: Date: Date: Date: Date:

10

11

12

13

14

15
JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT FORM

ENGINEERING PROCUREMENT CONSTRUCTION FOR HSE Job No. : 26071


REFINERY DEVELOPMENT MASTER PLAN (EPC FOR RDMP)
RU-V BALIKPAPAN PROJECT
JSA Number / Nomor JSA : RDMP / JSA / ……………….. / …………………

Status Status
NO Permit Registry No NO Permit Registry No Open √ Close √