Example Generator Fuel Fill Points
Example Generator Fuel Fill Points
Project: DUB 12
To: PPA
Project No.:1142
Attention of: Owen Page / Chris Hayward
Signed by Sub-Contractor:
Date:
Page 1 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
Submittal Status
☐ A. Approved to Proceed
☐ B. Approved to Proceed with comments noted below
☐ C. Revise and Resubmit based on comments noted below
Company:
Approved by:
Page 2 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
General Comments/Query’s
Page 3 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
2 – Specifications & Non-Compliance Schedule
Page 4 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
3 – Certified Performance Levels
Page 5 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
4 – Manufacturers Information
Page 6 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
S:\Alcon-LK\ISSUED\LK\40$\40902705.SLDDRW - RELEASED
9 2
8
WEATHER SEALED CABINET PRODUCED FORM 16SWG ZINTEC STEEL
POWDER COATED DARK ADMIRALTY GREY LEATHERETTE BS381C
SUPPLIED WITH DRIP TRAY (OTHER COLOURS ON REQUEST)
SUPPLIED WITH GAS STRUT, SEALED PERSPEX WINDOW AND LOCK
CABINET ALLOWS FOR MOUNTING OF:
LANDON KINGSWAY HYDROSTATIC CONTENTS GAUGE
FILGUARD ALARM MKI & MKII
FILL VALVE ASSY 1" TO 4"
LIGHTING ASSY
724 310
LOCATION FOR CAPILLARY
/ WIRING TO ENTER CABINET
283 PANEL REMOVES WITH KNOCKOUTS
(SILICONE SEAL AFTER INSTALLATION
258 FOR WEATHER PROOFING)
592
650
100
PROOFING)
83
156
44
205
LOCKABLE HANDLE
WITH TWO KEYS 477
(HANDLE ALLOWS FOR 675
SECONDARY BOLTING)
EN-F-002-01
Landon Kingsway
A Rotork Midland Brand
Patrick Gregory Road
Wolverhampton
West Midlands WV11 3DZ
United Kingdom
tel +44 (0)1902-305678
fax +44 (0)1902-305676
www.landonkingsway.com
[email protected]
Landon Kingsway are continually seeking to improve their range of products and reserve the right to change product specifications without prior notice.
O.L.E. (UK)LTD
Barns A & B Bowley Farm Estate
South Mundham Chichester
West Sussex PO20 1NB
Tel +44 (0) 1243 267 930
Instrumentation Engineering
www. oleuk.com e-mail [email protected]
T3100-BASE
REMOTE MONITORING
The T-3100 is a unique remote monitoring system that is ideal
for the monitoring of unattended equipment and locations. Mini
t-mac module incorporated
When monitoring
a single tank, the
Gauge unit can be
supplied as part of
the main unit, as
shown here to the
O.L.E. (UK)LTD
Instrumentation Engineering
www. oleuk.com e-mail [email protected] T3100-BASE
REMOTE MONITORING SYSTEMS.
HUMIDITY 5 to 95%
Page 7 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
80 mmø Diesel Filling
IL: 72908 @1:60
DUB12.COLO1.CELLC.FFS4 PhillipsPageAssociates
80 mmø Diesel Filling
Pipe penetrates genarator
79-80 Blackfriars road
DUB12.COLO1.CELLD.FFS5 3400mm above door line, London
DUB12.ADMIN.FFS1
drops to connect to 80mm 80 mmø Diesel Filling SE1 8HA
DUB12.COLO2.CELLA.FFS6 tank filling connection DUB12.COLO1.CELLA.FFS2 IL: 72860 @1:60 Tel: 02037352550
Finning to addives wether
DUB12.COLO2.CELLB.FFS7 proving detail 80 mmø Diesel Filling
IL: 72878 @1:60 DUB12.COLO1.CELLB.FFS3 IL: 72890 @1:60 : Overall Site Plan
E
80 mmø Diesel Filling
IL: 72970 @1:60 80 mmø Diesel Filling
IL: 73026 @1:60
DUB12
tank filling connection Lockable DC 4. CONTRACTOR SHALL PRODUCE THEIR OWN COORDINATED
Finning to addives wether WORKING DRAWINGS FOR THE PURPOSES OF CONSTRUCTION.
proving detail NRV
DC 5. DRAWING TO BE READ IN CONJUNCTION WITH ALL DESIGN TEAM
IL: 72750 @1:60 INFORMATION.
DUB12.COLO2.CELLD.FFS9
80 mmø Diesel Filling
Pipe drops to connect to 80 mmø Diesel Filling
DUB12.COLO2.CELLC.FFS8 IL: 72890 @1:60 DUB12.COLO2.CELLB.FFS7
80 mmø Diesel Filling 80mm tank filling
IL: 72890 @1:60 connection Finning to 80 mmø Diesel Filling DUB12.COLO2.CELLA.FFS6
addives wether proving Pipe drops to connect to
detail 80mm tank filling DUB12.COLO1.CELLD.FFS5
IL: 72860 @1:60 connection Finning to
addives wether proving
detail 80 mmø Diesel Filling
IL: 72859 @1:60 Rises to HL and offsets
IL: 68140
E 80 mmø Diesel Filling
IL: 72970 @1:60 DUB12.COLO3.CELLD.FFS13 291
Lockage DC
950
741
NRV
Cabinet drip trap drain down
(ADMIN)
DUB12.COLO3.CELLD.FFS13 tank filling connection IL: 72890 @1:60
Finning to addives wether
Pipe rises to HL
A
proving detail 3D 3B 2D 2B 1D 1B
IL: 72860 @1:60
3S 2S 1S
E
80 mmø Diesel Filling
Park, NangorRd,
Clondalkin, D22
80 mmø Diesel Filling
Pipe penetrates genarator
3400mm above door line, T5020-T4000-TCS
DUB12
drops to connect to 80mm
tank filling connection
Finning to addives wether Lockable DC Refer to tech sub for final
proving detail
model number
IL: 72860 @1:60
NRV
(Typical Detail for drawing
3'' Threaded bsp only)
fill connection
Drip tray
80 mmø Diesel Filling 80 mmø Diesel Filling
Pipe penetrates genarator Pipe penetrates genarator
3400mm above door line, 3400mm above door line,
drops to connect to 80mm drops to connect to 80mm
tank filling connection tank filling connection
Finning to addives wether Finning to addives wether
proving detail proving detail
IL: 72854 @1:60 IL: 72849 @1:60
P.15786 E - G - 05 A IFC 02
4 CABINETS
2 CABINETS 4 CABINETS 3 CABINETS Gilligan Architects Ltd, 20 Anglesea Road,
Ballsbridge, Dublin 4. Tel: (01) 660 4255
A-H-01
251A
: Overall Site Plan
251B 251C
2
GENERATOR
GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR
E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE DUB12
North
GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR
E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE NOTES:
71280 1. CONTRACTOR SHALL NOT SCALE FROM THESE DRAWINGS.
E-HOUSE
6. DRAWING TO BE READ IN CONJUNCTION WITH MEP
SPECIFICATIONS.
AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU
1100mm High Standalone Legend:
Guardrail to the edge of the
ramp and Crash Barrier to
246A 222A 225A both sides
21800
247A 244A 239A 237A 232A 226A
195A
266A 265A
EMPTY CORE 02
DUB12 - 1.265
DUB12 - 1.266
5 m²
5 m²
STAIRCORE 01
DUB12 - 1.195
DUB12 - 1.271
9 m² 98.13 SF
29 m²
COLO1-CELL A 194D 194C 194E 194F
21100
COLO3-CELL C COLO3-CELL A
DUB12 - 1.226
DUB12 - 1.247 DUB12 - 1.244 COLO2-CELL C COLO CORRIDOR 03 COLO2-CELL A 737 m²
644 m² COLO CORRIDOR 04
DUB12 - 1.246
641 m²
DUB12 - 1.239
641 m²
DUB12 - 1.222
105 m²
DUB12 - 1.237
647 m²
COLO1-CELL C
DUB12 - 1.232
MMR 1
HH
105 m² 731 m² COLO CORRIDOR 02
DUB12 - 1.189 Fire Suppression Enclosure 04
DUB12 - 1.225 LOADING DOCK
27 m²
165 m² DUB12 - 1.263
DUB12 - 1.194
5350 100 m² RECYCLING AREA 5 m²
9652
189A DUB12 - 1.272
6 m² 65.33 SF
C GG
233A HIGH VALUE STORAGE
234C ELECTRICAL ROOM A DUB12 - 1.193
ELECTRICAL ROOM C 227A DUB12 - 1.217 217B 36 m²
234D 233B 227B 159 m² COLO W.C 193A
DUB12 - 1.227 217A
CORRIDOR 02 COLO3
CORRIDOR 02 COLO2
CORRIDOR 01 COLO2
CORRIDOR 01 COLO3
159 m² DUB12 - 1.231
11091
DUB12 - 1.191
DUB12 - 1.250
DUB12 - 1.230
DUB12 - 1.249
DUB12 - 1.248
ELECTRICAL ROOM - COLO2 89 m² 191A 146 m²
123 m²
201A
140 m²
121 m²
135 m²
ELECTRICAL ROOM - COLO3
DUB12 - 1.233
15900
FF
159 m²
DUB12 - 1.201
228B 61 m²
268A CHECK POINT COR.
CORRIDOR 02 COLO3 CORRIDOR 02 COLO2 202A 201C
CORRIDOR 01 COLO3 CORRIDOR 01 COLO2 231A DUB12 - 1.268
3050
213G DUB12 - 1.250 DUB12 - 1.248 249A DUB12 - 1.249 DUB12 - 1.230 229B 223C 60 m² 649.31 SF
7491
123 m² 121 m²
135 m² 140 m²
3 A-H-01
B
DUB12 - 1.199
DUB12 - 1.216
LOBBY W.C
224A SHRED STORAGE
CLEANER
WORKSHOP 197A
7 m²
185A
7 m²
DUB12 - 1.185
DUB12 - 1.202 199A
15 m²
242B 238B 51 m²
EE
58799
216A 198C 213B
DUB12 - 1.198
183A
CORRIDOR 01
DUB12 - 1.197
DUB12 - 1.213
LOBBY
26 m²
05
LOBBY
63 m²
15 m²
ADMIN ELEC A-K-09
10265
220755 SER DUB12 - 1.183 198D
DUB12 - 1.181 51 m² 198B
26 m²
21250
FEMALE TOILET
91 m² DUB12 - 1.211
DUB12 - 1.219
DUB12 - 1.220
MALE TOILET
25 m²
224B 5 m²
177B
14 m²
20 m²
01
8691
A-K-09
OFFICE CORRIDOR 01
ESCAPE CORRIDOR 01
CLEANER STORE
221A 219A 220A
DUB12 - 1.196
DUB12 - 1.236 MMR 2
245A 243A 240A 235A 229A 223B DUB12 - 1.221 DUB12 - 1.192
58 m²
18 m²
FEMALE SHOWER
DUB12 - 1.206
236A
3433
MECH ROOM 01
238A
6 m²
242A DUB12 - 1.210 ACCESSIBLE MALE
WC SHOWER FACILITIES OFFICE
20 m² DUB12 - 1.208
DUB12 - 1.200 DUB12 - 1.177
6
9 m²
179A
5 m²
177A
152 m² BB
12397
8176
2494 m²
DUB12 - 1.179
39 m² CONFERENCE ROOM
DUB12 - 1.178
35 m²
X 1
AA
AHU ENCLOSURE 2 AHU ENCLOSURE 3 4 AHU ENCLOSURE
DUB12 - 1.252 DUB12 - 1.252 DUB12 - 1.252
252Z 252Y 252X 252W 252V 252U 252T 252S 252R 252Q 252P 252K 252J 252H 3 252G 252E 252D 252B 252A
22 m² 22 m² 22 m²
09
A-H-04 A-H-04 A-I-01
A-H-04 A-H-04 A-K-09 B 02.11.20 UPDATED SET - JM
7350 7400 7400 7400 5250 7400 7400 7400 7350 7350 7400 7400 7400 5250 7400 7400 7400 7350 350 8000 8000 8000 8000 5250 8000 8000 8000 8100 500 6184 9423 921 5327 18 ARCH DRAWINGS
252N 1
252AA A 28.09.20 IFC - ISSUE FOR JM
1
A-I-01 A-H-01
18 CONSTRUCTION
Rev Rev Revision Description By Checked
29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y1 Y2 Y3 Y4 Y5 NO Date
Revision Schedule
: DUB12 Plan
(ADMIN)
A
3D 3B 2D 2B 1D 1B
3S 2S 1S
P.15786 A - D - 01 A IFC
6 – Interfaces and Dependencies Schedule
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
Page 8 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
7 – Builders Work Requirements
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
Page 9 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
8 – O&M Information
Page 10 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
9 – List of Recommended Spares
CODE DESCRIPTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
Page 11 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
10 – Other Specific Information
Page 12 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04