Example Generator Fuel Fill Points

This document is a technical submittal form for approval of fuel fill cabinet equipment for a generator yard project. It includes details of the fuel fill cabinet and equipment such as make, model, and areas of use. It notes that the equipment is not fully compliant and includes attached documents providing specifications, drawings, and other details. The end of the document includes comments from different engineering companies regarding the cabinet and fuel system components.

Uploaded by

Slick72
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views19 pages

Example Generator Fuel Fill Points

This document is a technical submittal form for approval of fuel fill cabinet equipment for a generator yard project. It includes details of the fuel fill cabinet and equipment such as make, model, and areas of use. It notes that the equipment is not fully compliant and includes attached documents providing specifications, drawings, and other details. The end of the document includes comments from different engineering companies regarding the cabinet and fuel system components.

Uploaded by

Slick72
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

TECHNICAL SUBMITTAL FORM

Project: DUB 12
To: PPA
Project No.:1142
Attention of: Owen Page / Chris Hayward

Reference No: M500.03 Generator Fuel Fill Date Issued: 10/12/2018

Sub-Contractor: TBC From: Lloyd Gill


Sub-Contractor Sub No: TBC Date: 10/12/2018

Approval of the following equipment is required:

Equipment: Fuel Fill Cabinet and equipment Make: Rotork

Equipment References: Areas Used: Perimeter of Gen Yard


Description: Cabinets enclosures containing pipeline for refilling generator fuel tanks & panels displaying fuel levels
Planned on Site Date: TBC Fully Compliant: No (see section 2)

Attached detail documents:


(Tick if included and Insert references within boxes identifying supporting documentation included within this submission)

Description Tick Doc Ref Description Tick Doc Ref

Technical Submission Front x Interfaces and x


Sheet Dependencies Schedule
Specifications & Non- x Builders Work Requirements x
Compliance Schedule
Certified Performance Levels x O&M Information
Manufacturers Information x List of Recommended Spares

Certified Drawings x Other

Signed by Sub-Contractor:

Date:

Page 1 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
Submittal Status
☐ A. Approved to Proceed
☐ B. Approved to Proceed with comments noted below
☐ C. Revise and Resubmit based on comments noted below

Response By: Date:

Company:

Approved by:

On Behalf of: Date:

Page 2 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
General Comments/Query’s

Winthrop Engineering Comments Phillips Page Associates Comments


Cabinet to be in Ral 9005

Slight gap recommended between cabinets when mounted to


prevent door hinges clashing.
When drilling holes in cabinets to fit Panels sealing washers are
recommended to keep cabinet waterproof.
OLE T3100 to be used with Cabinet to monitor individual tanks

Electrically actuated shut off valve not required in remote fill


Cabinet as per PPA instruction.
PPA to confirm Fuel Line pipe diameter

Page 3 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
2 – Specifications & Non-Compliance Schedule

Page 4 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
3 – Certified Performance Levels

Page 5 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
4 – Manufacturers Information

Page 6 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
S:\Alcon-LK\ISSUED\LK\40$\40902705.SLDDRW - RELEASED

9 2
8
WEATHER SEALED CABINET PRODUCED FORM 16SWG ZINTEC STEEL
POWDER COATED DARK ADMIRALTY GREY LEATHERETTE BS381C
SUPPLIED WITH DRIP TRAY (OTHER COLOURS ON REQUEST)
SUPPLIED WITH GAS STRUT, SEALED PERSPEX WINDOW AND LOCK
CABINET ALLOWS FOR MOUNTING OF:
LANDON KINGSWAY HYDROSTATIC CONTENTS GAUGE
FILGUARD ALARM MKI & MKII
FILL VALVE ASSY 1" TO 4"
LIGHTING ASSY

724 310
LOCATION FOR CAPILLARY
/ WIRING TO ENTER CABINET
283 PANEL REMOVES WITH KNOCKOUTS
(SILICONE SEAL AFTER INSTALLATION
258 FOR WEATHER PROOFING)

FILL VALVE PIPE


EXIT TO TANK LOCATION
(FLANGE TO BE SEALED

592
650

TO CABINET FOR WEATHER

100
PROOFING)

83

156
44
205
LOCKABLE HANDLE
WITH TWO KEYS 477
(HANDLE ALLOWS FOR 675
SECONDARY BOLTING)

ALL DIMENSIONS ARE IN MILLIMETRES U.O.S.


GENERAL TOLERANCES :- ±0.15
TITLE
A TYPE CABINET ASSY WITH
DRAWN PJD DRAWING NUMBER
WINDOW CHECKED PA
MACHINE AT 40902705
1 09/01/2012 FIRST ISSUE
REMOVE ALL SHARP EDGES AND BURRS
MATERIAL
APPROVED PA
ALL DIAMETERS TO BE CONCENTRIC
ISSUE DATE MODIFICATION SCREW THREADS TO BS 3643-6g/6H FINISH N/A SCALE 1:5 (A0) INTERNATIONAL MOTION CONTROL, LTD

EN-F-002-01
Landon Kingsway
A Rotork Midland Brand
Patrick Gregory Road
Wolverhampton
West Midlands WV11 3DZ
United Kingdom
tel +44 (0)1902-305678
fax +44 (0)1902-305676
www.landonkingsway.com
[email protected]

Fill Valve Assy Details

Landon Kingsway are continually seeking to improve their range of products and reserve the right to change product specifications without prior notice.
O.L.E. (UK)LTD
Barns A & B Bowley Farm Estate
South Mundham Chichester
West Sussex PO20 1NB
Tel +44 (0) 1243 267 930
Instrumentation Engineering
www. oleuk.com e-mail [email protected]

T3100-BASE
REMOTE MONITORING
The T-3100 is a unique remote monitoring system that is ideal
for the monitoring of unattended equipment and locations. Mini
t-mac module incorporated

This advanced telemetry device allows two-way communication


between monitoring stations, and our unique web based server
access port.

Historical and current site data can be viewed and exported


from a password protected web site viewer, by csv or similar.
The system can be programmed to send SMS text messages
and e-mails to multiple recipients, based on abnormal ‘things
happening during the night’ or at certain times during the day.

T-3100 utilises the latest technology to send Data, over a


standard GPRS network, enabling communication with remote
equipment anywhere in the world.
Modular plug in allows Remote monitoring to be added to
existing T4020 Tank Gauges, or incorporated day one.
The T3100 can monitor any Modbus protocol device.

BANK OF 7 GAUGES WITHIN ONE PANEL

DIGITAL INPUTS Eight digital input sensors, such as


alarm outputs, level switches, timer sequences, or any other device
whose conditional change is to open a contact, or close one.

RS485 Modbus RS485 connection can STANDARD FEATURES & OPTIONS


monitor up to 264 functions, such as Tank Contents, and Specific
gravity. 20 tanks on one site, wired multi-drop can be monitored.
T-3100 can provide: ……….
Remote calibration can be performed a Status information of remote condition.
a Emergency messages / Alarms
ANALOGUE INPUTS Eight Analogue input circuits are
provided, which monitor input readings. The system has the benefit of Leak / Theft Triggers (SMS)
being configurable into engineering units. 4-20 mA, 0-5vdc, 0-10vdc, a Automatic ordering systems, (e-mails)
Thermister beads. ( 6 available if frequency inputs used). a Automatic Daily readings / logs
ALARMS Each input can be configured for
a Automatic Pre-Post Delivery e-mails,
specific alarming conditions such as High, Low, Re-Order, Level a Automatic maintenance program,
changes overnight indicating leak or theft by SMS text etc. a Automatic control functions,
a Automatic logic match control.
OUTPUTS The system offers FOUR digital
control output circuits, which can be used for any number of functions, a High Level Alarms 115 dB.
such as start, stop, alarm, open, close, camera start etc. a Data-logging for historical analysis
GENERAL Single enclosure, which incorporates TYPICAL GRAPHICAL PRESENTATION
monitor circuitry, and GPRS transceiver unit. The GPRS system
requires a SIM card to communicate with the web control centre.

When monitoring
a single tank, the
Gauge unit can be
supplied as part of
the main unit, as
shown here to the
O.L.E. (UK)LTD
Instrumentation Engineering
www. oleuk.com e-mail [email protected] T3100-BASE
REMOTE MONITORING SYSTEMS.

OPERATING SYSTEM Quad band GPRS Network. Fitted


with Established Cellular engine, and utilising a standard
phase II SIM card.

PROGRAMMING. Web based programming


environment including programme change and interrogation
facility Programmable remotely via GPRS.

COMMUNICATION. Via our Server to your Web viewer,


plus e-mails and SMS. Easy views and reports online.

POWER SUPPLY 24Vdc if available or 240 vac power


supply integral to the systems
(Power is provided from the T4020 Tank gauge if applicable)

SECURITY Data password protected (selectable)

ENCLOSURE IP66 weatherproof.

Applications include ………..

Level /Volume Counters


Flow / Total Maintenance cycles
Pressure Reordering
Temperature Environmental monitors
On / off Security / Theft.
Leak detection

CLOCK FUNCTION Based on real time 24hour operation.

OPERATING TEMP 0 to 60 DegC (0 – 140 DegF)

HUMIDITY 5 to 95%

GENERAL This system has the benefit of


increased revenue potential, and reduced installation costs.

For the Customer manpower needs are ultimately reduced.


Manual recordings are greatly reduced, if not stopped.

For the Suppliers, productivity is increased through the ability


to respond to demand more efficiently.

Complete Audit Trail for Supplier and Customer.


The system can be driven by the supplier or the end customer.
5 – Certified Drawings

Page 7 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
80 mmø Diesel Filling
IL: 72908 @1:60
DUB12.COLO1.CELLC.FFS4 PhillipsPageAssociates
80 mmø Diesel Filling
Pipe penetrates genarator
79-80 Blackfriars road
DUB12.COLO1.CELLD.FFS5 3400mm above door line, London
DUB12.ADMIN.FFS1
drops to connect to 80mm 80 mmø Diesel Filling SE1 8HA
DUB12.COLO2.CELLA.FFS6 tank filling connection DUB12.COLO1.CELLA.FFS2 IL: 72860 @1:60 Tel: 02037352550
Finning to addives wether
DUB12.COLO2.CELLB.FFS7 proving detail 80 mmø Diesel Filling
IL: 72878 @1:60 DUB12.COLO1.CELLB.FFS3 IL: 72890 @1:60 : Overall Site Plan
E
80 mmø Diesel Filling
IL: 72970 @1:60 80 mmø Diesel Filling
IL: 73026 @1:60
DUB12

80 mmø Diesel Filling


IL: 72790 @1:60 NOTES:
1. CONTRACTOR SHALL NOT SCALE FROM THESE DRAWINGS.

80 mmø Diesel Filling 2. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING/ VERIFYING


ALL DIMS ON SITE.
Pipe penetrates genarator
3400mm above door line, 3. CONTRACTOR SHALL NOT CONSTRUCT OR FABRICATE DIRECTLY
drops to connect to 80mm NRV FROM THESE DRAWINGS.

tank filling connection Lockable DC 4. CONTRACTOR SHALL PRODUCE THEIR OWN COORDINATED
Finning to addives wether WORKING DRAWINGS FOR THE PURPOSES OF CONSTRUCTION.
proving detail NRV
DC 5. DRAWING TO BE READ IN CONJUNCTION WITH ALL DESIGN TEAM
IL: 72750 @1:60 INFORMATION.

6. DRAWING TO BE READ IN CONJUNCTION WITH MEP


SPECIFICATIONS.
Lockable DC 7. PERMANENT LIGHTING WITHIN SPACES WHERE SECURITY
80 mmø Diesel Filling DC LIGHTING FOR CCTV IS REQUIRED. FINAL ARRANGEMENT TO BE
REVIEWED WITH SECURITY SPECIALIST.
Pipe penetrates genarator
3400mm above door line,
drops to connect to 80mm KEY NOTES:
tank filling connection
Finning to addives wether 1. All cabinets to be powder coated black as per
proving detail arcetectures details
IL: 72806 @1:60 2. Fuel filling station to fuel tank to be in fully welded
schedule 40carbon steel pipework
80 mmø Diesel Filling 80 mmø Diesel Filling 3. Alarm and monitoring panel to be with in filling cabinet
Pipe penetrates genarator IL: 72817 @1:60 4. Cut out in RC wall requiered detail by others
3400mm above door line,
drops to connect to 80mm
tank filling connection
Finning to addives wether
proving detail
IL: 72844 @1:60

80 mmø Diesel Filling


IL: 72853 @1:60

11 9 8 7 6 5 4 3 2 Fuel Filling Point Drain and NRV


4
Genorator Fuel Filling COLO 1
2 1 : 100
DUB12.COLO3.CELLA.FFS11
DUB12.COLO3.CELLB.FFS10

DUB12.COLO2.CELLD.FFS9
80 mmø Diesel Filling
Pipe drops to connect to 80 mmø Diesel Filling
DUB12.COLO2.CELLC.FFS8 IL: 72890 @1:60 DUB12.COLO2.CELLB.FFS7
80 mmø Diesel Filling 80mm tank filling
IL: 72890 @1:60 connection Finning to 80 mmø Diesel Filling DUB12.COLO2.CELLA.FFS6
addives wether proving Pipe drops to connect to
detail 80mm tank filling DUB12.COLO1.CELLD.FFS5
IL: 72860 @1:60 connection Finning to
addives wether proving
detail 80 mmø Diesel Filling
IL: 72859 @1:60 Rises to HL and offsets
IL: 68140
E 80 mmø Diesel Filling
IL: 72970 @1:60 DUB12.COLO3.CELLD.FFS13 291

Lockage DC

950
741
NRV
Cabinet drip trap drain down

Fuel Filling cabinet


6 1 : 50

80Ø Pipe falls


back to belly
tank @1:60
80Ø Pipe falls
80 mmø Diesel Filling
Pipe drops to connect to
80 mmø Diesel Filling
IL: 72870 @1:60 back to belly
80mm tank filling
connection Finning to 80 mmø Diesel Filling tank @1:60
addives wether proving Pipe penetrates genarator
detail 3400mm above door line,
IL: 72854 @1:60 drops to connect to 80mm
tank filling connection
Finning to addives wether A13/11/18 IFC - Issue For DE OP
proving detail Construction
IL: 72861 @1:60
P01 28/09/18 Issued for 90% CH OP
Design Development
80Ø Pipe falls Rev Rev Revision Description By Checked
NO Date
20 19 18 17 16 15 14 13 12 11 back to belly
Revision Schedule
tank @1:60
Genorator Fuel Filling COLO 2 : DUB12 Plan
3 1 : 100
80 mmø Diesel Filling DUB12.COLO3.CELLB.FFS10
IL: 72890 @1:60
80 mmø Diesel Filling 3N 2N 1N
Pipe penetrates genarator
DUB12.COLO3.CELLC.FFS12 3400mm above door line, DUB12.COLO3.CELLA.FFS11
drops to connect to 80mm 80 mmø Diesel Filling 3C 3A 2C 2A 1C 1A

(ADMIN)
DUB12.COLO3.CELLD.FFS13 tank filling connection IL: 72890 @1:60
Finning to addives wether
Pipe rises to HL

A
proving detail 3D 3B 2D 2B 1D 1B
IL: 72860 @1:60
3S 2S 1S
E
80 mmø Diesel Filling

Grange Castle Business


IL: 72969 @1:60 80 mmø Diesel Filling
IL: 72969 @1:60
1 per fill point - ECO UK ltd

Park, NangorRd,
Clondalkin, D22
80 mmø Diesel Filling
Pipe penetrates genarator
3400mm above door line, T5020-T4000-TCS

DUB12
drops to connect to 80mm
tank filling connection
Finning to addives wether Lockable DC Refer to tech sub for final
proving detail
model number
IL: 72860 @1:60
NRV
(Typical Detail for drawing
3'' Threaded bsp only)
fill connection

Drip tray
80 mmø Diesel Filling 80 mmø Diesel Filling
Pipe penetrates genarator Pipe penetrates genarator
3400mm above door line, 3400mm above door line,
drops to connect to 80mm drops to connect to 80mm
tank filling connection tank filling connection
Finning to addives wether Finning to addives wether
proving detail proving detail
IL: 72854 @1:60 IL: 72849 @1:60

80 mmø Diesel Filling


IL: 72862 @1:60
P.15786 MSFT - DUB12
Job Title:
DUB12
QR CODE Grange Castle Business Park, NangorRd, Clondalkin, D22
Drawing Title:
Genorator Fuel Filling
29 28 27 26 25 24 23 22 21 Layout

Genorator Fuel Filling COLO 3


1 1 : 100
Date:
28.09.18
Scale
1:100@A0
Drawn by:
CH
Checked By:
OP
Project Status:

IFC - ISSUE FOR CONSTRUCTION


Project No. Discipline Category Drawing No. Revision Status Version

P.15786 E - G - 05 A IFC 02
4 CABINETS
2 CABINETS 4 CABINETS 3 CABINETS Gilligan Architects Ltd, 20 Anglesea Road,
Ballsbridge, Dublin 4. Tel: (01) 660 4255
A-H-01

251A
: Overall Site Plan
251B 251C
2

E 71280 71280 70250 70250 71280 71280 70250 71280


70250 70250

GENERATOR
GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR
E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE DUB12

North
GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR
E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE E-HOUSE NOTES:
71280 1. CONTRACTOR SHALL NOT SCALE FROM THESE DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING/ VERIFYING


ALL DIMS ON SITE.

70250 70250 3. CONTRACTOR SHALL NOT CONSTRUCT OR FABRICATE DIRECTLY


29339

GENERATOR / AHU YARD 70250 251D FROM THESE DRAWINGS.


251E

70250 70250 DUB12 - 1.251 70250


4515 m² 4. CONTRACTOR SHALL PRODUCE THEIR OWN COORDINATED
WORKING DRAWINGS FOR THE PURPOSES OF CONSTRUCTION.

5. DRAWING TO BE READ IN CONJUNCTION WITH ALL DESIGN TEAM


INFORMATION.

E-HOUSE
6. DRAWING TO BE READ IN CONJUNCTION WITH MEP
SPECIFICATIONS.

AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU
1100mm High Standalone Legend:
Guardrail to the edge of the
ramp and Crash Barrier to
246A 222A 225A both sides

21800
247A 244A 239A 237A 232A 226A
195A
266A 265A
EMPTY CORE 02

Fire Suppression Enclosure 02


DUB12 - 1.241

Fire Suppression Enclosure 03 271A


Not Enclosed

DUB12 - 1.265
DUB12 - 1.266

Fire Suppression Enclosure 01


UP

5 m²
5 m²

STAIRCORE 01
DUB12 - 1.195
DUB12 - 1.271
9 m² 98.13 SF

29 m²
COLO1-CELL A 194D 194C 194E 194F
21100

COLO3-CELL C COLO3-CELL A
DUB12 - 1.226
DUB12 - 1.247 DUB12 - 1.244 COLO2-CELL C COLO CORRIDOR 03 COLO2-CELL A 737 m²
644 m² COLO CORRIDOR 04
DUB12 - 1.246
641 m²
DUB12 - 1.239
641 m²
DUB12 - 1.222
105 m²
DUB12 - 1.237
647 m²
COLO1-CELL C
DUB12 - 1.232
MMR 1
HH
105 m² 731 m² COLO CORRIDOR 02
DUB12 - 1.189 Fire Suppression Enclosure 04
DUB12 - 1.225 LOADING DOCK
27 m²
165 m² DUB12 - 1.263
DUB12 - 1.194
5350 100 m² RECYCLING AREA 5 m²

9652
189A DUB12 - 1.272
6 m² 65.33 SF

64407 194A LOADING DOCK WC


DUB12 - 1.203
184C 194G 3 m²

C GG
233A HIGH VALUE STORAGE
234C ELECTRICAL ROOM A DUB12 - 1.193
ELECTRICAL ROOM C 227A DUB12 - 1.217 217B 36 m²
234D 233B 227B 159 m² COLO W.C 193A
DUB12 - 1.227 217A
CORRIDOR 02 COLO3

57650 GENERAL STORAGE RECEIVING AREA

CORRIDOR 02 COLO2

CORRIDOR 01 COLO2
CORRIDOR 01 COLO3
159 m² DUB12 - 1.231

11091
DUB12 - 1.191
DUB12 - 1.250

5 m² 51.38 SF DUB12 - 1.184

DUB12 - 1.230
DUB12 - 1.249
DUB12 - 1.248
ELECTRICAL ROOM - COLO2 89 m² 191A 146 m²
123 m²

201A

140 m²
121 m²
135 m²
ELECTRICAL ROOM - COLO3
DUB12 - 1.233
15900

DUB12 - 1.234 707 m²


228A 223A
707 m²
229C 191B
ELECTRICAL ROOM D ELECTRICAL ROOM B
234A 233D 218A 218B 184D
268B 184A 201B
A-H-01 4 DUB12 - 1.228 DUB12 - 1.218
SECURE STORAGE
3350 234B 233C 225B 159 m²

FF
159 m²
DUB12 - 1.201
228B 61 m²
268A CHECK POINT COR.
CORRIDOR 02 COLO3 CORRIDOR 02 COLO2 202A 201C
CORRIDOR 01 COLO3 CORRIDOR 01 COLO2 231A DUB12 - 1.268
3050

213G DUB12 - 1.250 DUB12 - 1.248 249A DUB12 - 1.249 DUB12 - 1.230 229B 223C 60 m² 649.31 SF

7491
123 m² 121 m²
135 m² 140 m²
3 A-H-01
B

DUB12 - 1.199
DUB12 - 1.216

LOBBY W.C
224A SHRED STORAGE

CLEANER
WORKSHOP 197A

7 m²
185A

7 m²
DUB12 - 1.185
DUB12 - 1.202 199A
15 m²
242B 238B 51 m²

EE

58799
216A 198C 213B

DUB12 - 1.198
183A

CORRIDOR 01
DUB12 - 1.197

DUB12 - 1.213
LOBBY

26 m²
05

LOBBY
63 m²

15 m²
ADMIN ELEC A-K-09

10265
220755 SER DUB12 - 1.183 198D
DUB12 - 1.181 51 m² 198B
26 m²
21250

M.V ROOM SFOC TELEPHONE RM


COLO2-CELL D COLO2-CELL B COLO1-CELL D DUB12 - 1.224 COLO1-CELL B 181A DUB12 - 1.214
DUB12 - 1.215 213A
COLO3-CELL B DUB12 - 1.240 DUB12 - 1.238 DUB12 - 1.229 81 m² DUB12 - 1.223 10 m² 9 m²
COLO3-CELL D DUB12 - 1.243 645 m² CORRIDOR 2 673 m² 7246.56 SF
822 m² 849 m² 182A 211A 197B
DUB12 - 1.245
648 m² CORRIDOR 3
DUB12 - 1.242
667 m²
DUB12 - 1.262
91 m²
H-VAC ROOM
FCR 214A 215A DD
DUB12 - 1.182

FEMALE TOILET
91 m² DUB12 - 1.211

DUB12 - 1.219

DUB12 - 1.220
MALE TOILET
25 m²
224B 5 m²
177B

14 m²

20 m²
01

8691
A-K-09

OFFICE CORRIDOR 01
ESCAPE CORRIDOR 01
CLEANER STORE
221A 219A 220A

DUB12 - 1.196
DUB12 - 1.236 MMR 2
245A 243A 240A 235A 229A 223B DUB12 - 1.221 DUB12 - 1.192

58 m²
18 m²

A 6 m² 26 m² 192A 206A 208A 200A


CC

FEMALE SHOWER
DUB12 - 1.206
236A

3433
MECH ROOM 01
238A

6 m²
242A DUB12 - 1.210 ACCESSIBLE MALE
WC SHOWER FACILITIES OFFICE
20 m² DUB12 - 1.208
DUB12 - 1.200 DUB12 - 1.177

6
9 m²
179A
5 m²
177A
152 m² BB
12397

AHU ENCLOSURE 210A


DUB12 - 1.252 178A
AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU
196A BREAK ROOM
A-L-01

8176
2494 m²
DUB12 - 1.179
39 m² CONFERENCE ROOM
DUB12 - 1.178
35 m²

X 1
AA
AHU ENCLOSURE 2 AHU ENCLOSURE 3 4 AHU ENCLOSURE
DUB12 - 1.252 DUB12 - 1.252 DUB12 - 1.252
252Z 252Y 252X 252W 252V 252U 252T 252S 252R 252Q 252P 252K 252J 252H 3 252G 252E 252D 252B 252A
22 m² 22 m² 22 m²
09
A-H-04 A-H-04 A-I-01
A-H-04 A-H-04 A-K-09 B 02.11.20 UPDATED SET - JM
7350 7400 7400 7400 5250 7400 7400 7400 7350 7350 7400 7400 7400 5250 7400 7400 7400 7350 350 8000 8000 8000 8000 5250 8000 8000 8000 8100 500 6184 9423 921 5327 18 ARCH DRAWINGS
252N 1
252AA A 28.09.20 IFC - ISSUE FOR JM
1
A-I-01 A-H-01
18 CONSTRUCTION
Rev Rev Revision Description By Checked
29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Y1 Y2 Y3 Y4 Y5 NO Date
Revision Schedule

: DUB12 Plan

DUB12 - GROUND FLOOR G.A PLAN - LEVEL 0 1 3N 2N 1N


SCALE: 1 : 250
3C 3A 2C 2A 1C 1A

(ADMIN)
A
3D 3B 2D 2B 1D 1B
3S 2S 1S

Grange Castle Business


Park, Nangor Rd,
Clondalkin, D22.
DUB12
P.15786 MSFT - DUB12
Job Title:
DUB12
QR CODE Grange Castle Business Park, Nangor Rd, Clondalkin, D22.
Drawing Title:
DUB12 - GROUND FLOOR G.A PLAN - LEVEL 0

Date: Scale Drawn by: Checked By:


28.09.2018 1:250@A0 JM JM
Project Status:
IFC - ISSUE FOR CONSTRUCTION
Project No. Discipline Category Drawing No. Revision Status Version

P.15786 A - D - 01 A IFC
6 – Interfaces and Dependencies Schedule

Interface Required Detail Provided By Final Connection By

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

Page 8 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
7 – Builders Work Requirements

Builders Work Requirements

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

Page 9 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
8 – O&M Information

Page 10 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
9 – List of Recommended Spares
CODE DESCRIPTION

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
Page 11 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04
10 – Other Specific Information

Page 12 of 12
IMS Document No: 1.04.04.01 QFC_03 Revision: 04