Objective: Aug 2019-Dec 2020
Objective: Aug 2019-Dec 2020
OBJECTIVE
A power plant enthusiast with rigorous experience on and off field, now seeking an opportunity to further serve in the
mission of performance optimization and digital transformation of power plants to achieve a world that is powered by
most reliable and efficient power sources.
EDUCATION
WORK EXPERIENCE
Performance Analyst
General Electric (GE Digital) Jan 2019- Aug 2019
Performance monitoring of GE Digital’s customer power plants including Halmore Power Station (Bhikki), Sapphire
Power Plant (Muridke) etc.
Customer dealing with regards to plant’s performance and weekly update meetings to satisfy their concerns.
Troubleshooting the issues in installed digital solutions at customer sites.
Leading the implementation of new solutions which includes vendor dealing, procurement, installation and first run.
Constant evaluation of real time power plant data to identify performance gaps and improvising accordingly.
Working closely with software team as subject matter expert (SME) for successful development of software to help
customers in Middle East have better visualization and analysis of their plant’s performance that leads to proactive
solutions.
Assistant Manager
K-Electric Aug 2018- Dec 2018
Assisting review of Request for Proposal (RFP) for 900 MW Bin Qasim Power Station-III (BQPS-III)
Assisted technical study of comparison between single shaft and multi shaft arrangement in combined cycle power plant
(BQPS-III)
Trainee Engineer
K-Electric Aug 2017- July 2018
Observed & Assisted the Major Inspection Activity of 130 MW GE Frame 9E Gas Turbine which included NDT of
compressor & turbine blades, Fluorescent Piece Inspection for crack’s identification, and Combustion Chamber
Replacement.
Heat Balance Calculation of 560 MW Combined Cycle Power Plant to identify points of heat losses.
Worked on technical feasibility of absorption chiller, powered by low grade exhaust gases from Heat Recovery Steam
generator, to provide inlet air cooling for gas turbine.
Improvised boiler MFT logic to enhance power plant’s operations reliability.
Performed analysis on impact of online water washing of gas turbine on power output.
Verification of operation and maintenance cost calculation for all KE’s Generation Power Plants.
Reviewed the Power Purchase Agreement contract of 100 MW SNPC.
Senior Officer
Dawlance- Arcelik Jan 2017- July 2017
Worked in the Quality Department, Production Engineering Department, Process Engineering Department, Energy and
Environment Department.
Intern
BYCO Petroleum Pakistan Limited June 2015- July 2015
Interned at BYCO Petroleum Pakistan Limited (ORC 1) for four weeks which covered orientation in controls, operation and
maintenance departments.
PROJECTS
Least Square Curve Fitting on Noisy Data- developing algorithm for least square and its variants in MATLAB.
3E (Energy, Exergy, Economic) Analysis of Waste Heat Recovery System at Georgia Tech- development of thermodynamic
models in EES (Engineering Equation Solver)
Heat Transfer Performance Analysis of a Central Receiver Pipe for a CSP Plant- heat transfer equations were modelled
using MATLAB.
Technical feasibility analysis of molten salt based solar power plant for Pakistan including simulation of plant model on
TRNSYS.
Data Fusion for System Design- machine learning algorithms created in Python.
Handling Curse of Dimensionality through Regression- regression analysis carried out in Python environment using
Jupyter Notebook.
A Review of the Fake News Detection Technology Based on Machine Learning.
HONORS
REFERENCES
References will be made available on request.