The document discusses Overall Equipment Effectiveness (OEE), which is a measurement used in Lean Manufacturing and Total Productive Maintenance programs. OEE seeks to answer three questions about machine performance: availability, performance, and quality. The formula for calculating OEE multiplies availability, performance, and quality scores. An example OEE calculator is provided to demonstrate how data on availability, performance, and quality can be entered to calculate an overall OEE score.

Uploaded by

Vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views4 pages

Free OEE Calculator Template Excel Download

The document discusses Overall Equipment Effectiveness (OEE), which is a measurement used in Lean Manufacturing and Total Productive Maintenance programs. OEE seeks to answer three questions about machine performance: availability, performance, and quality. The formula for calculating OEE multiplies availability, performance, and quality scores. An example OEE calculator is provided to demonstrate how data on availability, performance, and quality can be entered to calculate an overall OEE score.

Uploaded by

Vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

OEE Calculator Template

Want more tools and templates? Visit https://upboard.io/

In Lean Six Sigma, OEE stands for Overall Equipment Effectiveness, and is generally considered to refer to a
measurement in “Total Productive Maintenance” programs. The measure looks at effectiveness and efficiency of
machinery or processes and is commonly referred to in reference to Lean Manufacturing. OEE seeks to answer
three machine performance related questions:
- How often is the machine available to run?
- How fast does it run when it’s running?
- How many acceptable parts were produced in the allotted time?

The formula used to calculate OEE is as follows: OEE = Availability x Performance x Quality

Overall Equipment Effectiveness (OEE) Calculator

OEE Score 77%

Availability 108%
Operating Time (hours) 14
Planned Production Time (Hours) 13

Performance 75%
Pieces Produced 1500
Ideal Speed (products per hour) 50
Operating Time (hours) 40

Quality 95%
Acceptable Pieces 950
Total Pieces 1000
or Template

nsidered to refer to a
ectiveness and efficiency of
ring. OEE seeks to answer

uality

Enter Data Here


Enter Data Here

Enter Data Here


Enter Data Here
Enter Data Here

Enter Data Here


Enter Data Here

You might also like