In Lean Six Sigma, OEE stands for Overall Equipment Effectiveness, and is generally considered to refer to a
measurement in “Total Productive Maintenance” programs. The measure looks at effectiveness and efficiency of
machinery or processes and is commonly referred to in reference to Lean Manufacturing. OEE seeks to answer
three machine performance related questions:
- How often is the machine available to run?
- How fast does it run when it’s running?
- How many acceptable parts were produced in the allotted time?
The formula used to calculate OEE is as follows: OEE = Availability x Performance x Quality
Availability 108%
Operating Time (hours) 14
Planned Production Time (Hours) 13
Performance 75%
Pieces Produced 1500
Ideal Speed (products per hour) 50
Operating Time (hours) 40
Quality 95%
Acceptable Pieces 950
Total Pieces 1000