BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08: Purpose and Scope

This document provides technical specifications for chemically cleaning carbon steel alloys using a Ferroquest FQ product solution. It outlines responsibilities, materials used, preparation of the cleaning solution, monitoring chemical parameters, procedures for adding chemicals to control pH, draining and rinsing the item after cleaning, and certification requirements. The document is the exclusive property of BAMA s.r.l. and contains confidential information.

Uploaded by

Abdul Di
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views6 pages

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08: Purpose and Scope

This document provides technical specifications for chemically cleaning carbon steel alloys using a Ferroquest FQ product solution. It outlines responsibilities, materials used, preparation of the cleaning solution, monitoring chemical parameters, procedures for adding chemicals to control pH, draining and rinsing the item after cleaning, and certification requirements. The document is the exclusive property of BAMA s.r.l. and contains confidential information.

Uploaded by

Abdul Di
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

ISTRUZIONE TECNICA 7.5 Rev. 2.

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08 Date: 01/03/2022

Pag. 1 di 6

TECHNICAL SPECIFICATION FOR CHEMICAL CLEANING

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08

PURPOSE AND SCOPE

Technical specification for carbon steel alloys chemical cleaning with Ferroquest FQ product solution.

Process derivation: BAMA s.r.l. Turbigo factory.

The existing safety and accident prevention laws must be followed.


Safety measures have been specified when necessary.

REFERENCE
➢ MQA Sec. 7.5

RESPONSIBILITY

Who Where What Checks


 Unit resp.  Bama  Initial controls  Presence of instructions
 On site works resp.  On site works  Utilization  Understanding instructions
 Workers  Final controls  Training
 Environment  Effectiveness if training
 Security
➢ Responsibility for management and check of preparation’s operations are borne in SQA, DIR, HR
➢ Responsibility of information and training are borne in HR, SQA
➢ Responsibility of the correct application and execution of test are borne in SQA, DIR.

LEGEND
MQA SQA DIR HR
Quality and Environment Manual Quality and Environment System Direction Human Resource

Rev. Data Emissione Descrizione Modifica Redatto Verificato


0 09.08.2012 First emission G.De Bernardi S. Castoldi
1 22.02.2016 General Revision G. Be Dernardi S. Castoldi

2 15.02.2017 General Revision G. Be Dernardi S. Castoldi


2.1 30.09.2021 General Revision L. Grassi G. De Bernardi
2.2 07.10.2021 General Revision L. Grassi G. De Bernardi
Revision in accordance to Suez
2.3 01.03.2022 L. Grassi G. De Bernardi
datasheet (pH modified)

This technical instruction is exclusive property of BAMA s.r.l., all rights reserved. Any disclosure, reproduction, or transfer of the contents of the third parties are prohibited
without prior permission of the Company. All information contained herein are confidential and, such as, cannot be transferred to other people or organizations without our
permission.

The copy delivered are “Copy controlled” or “Copy Uncontrolled”. In the first case, the Quality Manager is committed to venture further delay of any new version of the
document; in case of Uncontrolled copy, however, we ask to you to consider the document valid only after making sure that the one you have is the latest revision issued.

HARDCOPIES OF THIS DOCUMENT WITHOUT RELEASE SIGNATURES ARE CONSIDERED NOT CONTROLLED, HENCE WITHOUT ANY VALIDITY.

BAMA S.r.l. Via Novara, 20029 Turbigo, Italy - http://www.bama-technologies.com - Email [email protected] - tel. +39 0331898460
Filename: \\10.0.1.10\documenti\SISTEMA QUALITA' E AMBIENTE\7.Istruzioni tecniche\SPECIFICHE NUOVE RELEASE 08\BA010-CARBONIO\CLIENTI-BA010\RESTA\RESTA JOB 2918\BA010REV2.3-FQUEST-
08-BARHAIN-NC-JOB-29-18-280921-ENG.doc
ISTRUZIONE TECNICA 7.5 Rev. 2.3

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08 Date: 01/03/2022

Pag. 2 di 6

INDEX

TECHNICAL SPECIFICATION FOR CHEMICAL CLEANING ................................................................................................................ 1


PURPOSE AND SCOPE...................................................................................................................................... 1
REFERENCE ....................................................................................................................................................... 1
RESPONSIBILITY .............................................................................................................................................. 1
1. PURPOSE ........................................................................................................................................................................... 3
2. GENERAL RECOMMENDED PRECAUTIONS ............................................................................................................................ 3
3. HANDLING ......................................................................................................................................................................... 3
4. MATERIALS ........................................................................................................................................................................ 3
5. DEFINITIONS ..................................................................................................................................................................... 3
6. PREPARATION OF THE CLEANING SOLUTION ....................................................................................................................... 3
7. CHEMICAL INLET PREPARATION ......................................................................................................................................... 4
8. CHEMICAL PARAMETERS MONITORING................................................................................................................................ 4
9. CHECK OF IRON CONTENT .................................................................................................................................................. 4
10. FQ7102 ADDITION FOR PH CONTROL .............................................................................................................................. 4
11. PASSIVATION STEP COMPLETE ....................................................................................................................................... 4
12. DRAIN THE ITEM ........................................................................................................................................................... 5
13. FINAL FLUSH OF THE ITEM ............................................................................................................................................. 5
14. DRYING ......................................................................................................................................................................... 5
15. CHEMICAL AND PHYSICAL CHARACTERISTICS OF THE WATER .......................................................................................... 5
16. CERTIFICATION ............................................................................................................................................................. 5
17. ATTACHMENT ................................................................................................................................................................ 6

HARDCOPIES OF THIS DOCUMENT WITHOUT RELEASE SIGNATURES ARE CONSIDERED NOT CONTROLLED, HENCE WITHOUT ANY VALIDITY.

BAMA S.r.l. Via Novara, 20029 Turbigo, Italy - http://www.bama-technologies.com - Email [email protected] - tel. +39 0331898460
Filename: \\10.0.1.10\documenti\SISTEMA QUALITA' E AMBIENTE\7.Istruzioni tecniche\SPECIFICHE NUOVE RELEASE 08\BA010-CARBONIO\CLIENTI-BA010\RESTA\RESTA JOB 2918\BA010REV2.3-FQUEST-
08-BARHAIN-NC-JOB-29-18-280921-ENG.doc
ISTRUZIONE TECNICA 7.5 Rev. 2.3

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08 Date: 01/03/2022

Pag. 3 di 6

1. PURPOSE

This technical specification defines the details about carbon steel/austenitic steel/Ni alloys vessels, pipes and tanks and
exchangers chemical treatment by circulation system using Suez Ferroquest FQ product solutions (or equivalent).

2. GENERAL RECOMMENDED PRECAUTIONS

The producers instructions of the solutions and their thresholds must be followed (reference to material safety data sheet).
Personal safety measures and the laws about use, storage and disposal of chemical substances must be followed.

3. HANDLING

Carried out using exclusively Teflon or nylon bands.

4. MATERIALS

Carbon steel alloys, CrMo steel, austenitic stainless steel and Ni alloys.

5. DEFINITIONS

Passivation is the process where a very thin film of rust is purposely formed and phosphates are placed on freshly
cleaned carbon steel to prevent excessive rust. Instead of the carbon steel being left in the active state (prone to
corrosion), the metal is left passive (non-reactive). The intent is to protect the freshly cleaned metal while the equipment is
out of service.

Passivation Chemicals used: FQ7101/:F07102 (or equivalent):

Organic passivating agent liquids. FQ7101/FQ7102 work by chelating any soluble iron (like the surface rust present in
the new exchanger) in the system and promoting a Phosphate/Iron conversion layer on the metal surface. This layer
is then in the optimum form to prevent 'iron throw’ to the Cooling Water.

Ratios of chemicals to use for Cleaning/Passivation

For pre-cleaning on new equipment, the below concentrations on the chemicals are suggested:

• FQ7101 5% by volume (cleaner)


• FQ7102 0.2% by volume (pH corrector)

The recirculating solution pH shall be between 6.0 and 7.2 (Optimal value is 6.5).

If it’s not possible to calculate the actual thickness of the deposit to remove, use a standard 10% FQ7101 solution with
1%-2% of pH corrector FQ7102.
To ensure a performing chemical cleaning on the internal surfaces of the exchangers, and to reduce the product
replenishment (also considering the variable volumes caused by pipes, pumps and recirculation tank) it is suggested to
use a 15% FQ7101 solution.

6. PREPARATION OF THE CLEANING SOLUTION

• Calculate amounts of Ferroquest 7101/7102 (or equivalent) to be used (Table 1).


• Fill the circulation tank and the equipment to be treated with Quality 2 Water – Tap Water (Table 2)
• Add chemicals to the circulation tank while circulating water. Turn material over one time for mixing before
proceeding.
HARDCOPIES OF THIS DOCUMENT WITHOUT RELEASE SIGNATURES ARE CONSIDERED NOT CONTROLLED, HENCE WITHOUT ANY VALIDITY.

BAMA S.r.l. Via Novara, 20029 Turbigo, Italy - http://www.bama-technologies.com - Email [email protected] - tel. +39 0331898460
Filename: \\10.0.1.10\documenti\SISTEMA QUALITA' E AMBIENTE\7.Istruzioni tecniche\SPECIFICHE NUOVE RELEASE 08\BA010-CARBONIO\CLIENTI-BA010\RESTA\RESTA JOB 2918\BA010REV2.3-FQUEST-
08-BARHAIN-NC-JOB-29-18-280921-ENG.doc
ISTRUZIONE TECNICA 7.5 Rev. 2.3

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08 Date: 01/03/2022

Pag. 4 di 6

Table 1
SHELL SIDE TUBE SIDE FQ7101 VOLUME FQ7101 VOLUME FQ7102 VOLUME FQ7102 VOLUME
ITEM
VOLUME VOLUME FOR SHELL SIDE FOR TUBE SIDE FOR SHELL SIDE FOR TUBE SIDE

018E1006 4.3 m3 / 645 L / 43 to 86 L /


018E2003 1.4 m3 / 210 L / 14 to 28 L /
018E2006 4.3 m3 2.2 m3 645 L 330 L 43 to 86 L 22 to 44 L
018E2007 0.45 m3 0.38 m3 68 L 57 L 4.5 to 9 L 4 to 8 L
021E0003 / 1.6 m3 / 240 L / 16 to 32 L
021E0005 / 1.7 m3 / 255 L / 17 to 34 L
021E0009 1.4 m3 0.9 m3 210 L 135 L 14 to 28 L 9 to 18 L

7. CHEMICAL INLET PREPARATION

• Limit and tag all the working area around the exchanger and temporary equipment area.
• Prepare pumping station equipment for service. If using a diaphragm pump, start a small air flow.
• Hook up connection hoses from acid supply container to injection pump and to manifold off discharge of pump
and open vent on storage container.
• As equipment has been installed properly, start chemical injection.

8. CHEMICAL PARAMETERS MONITORING

PH, conductivity, and Iron content every 60 minutes shall be monitored in order to target the desired concentration of
Ferroquest chemicals.

Additional Ferroquest FQ7102 (or equivalent) will be added to control pH; all results shall be logged as certification.

9. CHECK OF IRON CONTENT

Take a sample of return water for iron as Fe 2O3.


The iron levels will increase rapidly when the cleaning is first started since the easiest iron deposits will be removed.
After a period of time, the iron level will not increase at the same rate, indicating that the passivation step is almost
complete.

10. FQ7102 ADDITION FOR PH CONTROL

Sample return water for pH on an hourly basis to target a pH range of 6.0 to 7.2 (optimal value is 6.5)
If needed, add Ferroquest 7102 (low pH) to maintain target.

11. PASSIVATION STEP COMPLETE

Passivation phase is complete when the iron concentration does not significantly increase over time, even after
additional FQ7101/7102 has been added to the system or if all the Ferroquest chemicals have been added to the
recirculation tank and have been in circulation for 24 hours, then passivation can be considered complete.
In any case recirculation time can be performed from 24h – to 72h.

After BAMA and Resta Site Supervisor agree that passivation step is complete, proceed to drain exchanger.

HARDCOPIES OF THIS DOCUMENT WITHOUT RELEASE SIGNATURES ARE CONSIDERED NOT CONTROLLED, HENCE WITHOUT ANY VALIDITY.

BAMA S.r.l. Via Novara, 20029 Turbigo, Italy - http://www.bama-technologies.com - Email [email protected] - tel. +39 0331898460
Filename: \\10.0.1.10\documenti\SISTEMA QUALITA' E AMBIENTE\7.Istruzioni tecniche\SPECIFICHE NUOVE RELEASE 08\BA010-CARBONIO\CLIENTI-BA010\RESTA\RESTA JOB 2918\BA010REV2.3-FQUEST-
08-BARHAIN-NC-JOB-29-18-280921-ENG.doc
ISTRUZIONE TECNICA 7.5 Rev. 2.3

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08 Date: 01/03/2022

Pag. 5 di 6

12. DRAIN THE ITEM

• Shut down circulation pump.


• Open high point bleed.
• Drain exchanger to empty storage tank(s).

13. FINAL FLUSH OF THE ITEM

Connect water (Quality 2 - Tap Water) to inlet connection and fill the system with fresh water until flow back to tank is
observed.
Drain the item to empty storage tank(s) or sewage.

14. DRYING

After chemical treatment the surfaces shall be drained completely.


Drying can be performed using forced dry air, air treatment unit (UTA), vacuum pump, nitrogen flushing.
Drying shall be completed when dew point at the outlet is 0° or less.

15. PRESERVATION WITH N2

Conditioning by nitrogen purging according to the preservation procedure No. WQA0107-2918 REV.2

16. CHEMICAL AND PHYSICAL CHARACTERISTICS OF THE WATER

Table 2
Quality 1 (Demi water) Quality 2 (Tap water)
Aspect Clear Clear
Colour Absent Absent
pH (25°C) 5.5/7.5 5.5/8
Chlorides < 1.5 ppm < 50 ppm
Fluorides < 0.1 ppm < 0.1 ppm
Sulphates < 1.0 ppm < 45 ppm
Silicon dioxide (SiO2) < 0.1 ppm
Total solids < 0.1 ppm < 600 ppm
Conductivity < 5 microsiemens
Filtration grade < 10 micron
If quality 2 (Tap Water) it is not available on-site, water with maximum +10% of chlorides can be used (chlorides <55 ppm)

17. CERTIFICATION

After the chemical treatment and inspections, the certificate will be issued (see attachment 1 for further information).

HARDCOPIES OF THIS DOCUMENT WITHOUT RELEASE SIGNATURES ARE CONSIDERED NOT CONTROLLED, HENCE WITHOUT ANY VALIDITY.

BAMA S.r.l. Via Novara, 20029 Turbigo, Italy - http://www.bama-technologies.com - Email [email protected] - tel. +39 0331898460
Filename: \\10.0.1.10\documenti\SISTEMA QUALITA' E AMBIENTE\7.Istruzioni tecniche\SPECIFICHE NUOVE RELEASE 08\BA010-CARBONIO\CLIENTI-BA010\RESTA\RESTA JOB 2918\BA010REV2.3-FQUEST-
08-BARHAIN-NC-JOB-29-18-280921-ENG.doc
ISTRUZIONE TECNICA 7.5 Rev. 2.3

BA010REV2.3/FQUEST/BAHRAIN/NC/JOB2918/08 Date: 01/03/2022

Pag. 6 di 6

18. ATTACHMENT
Attachment 1

HARDCOPIES OF THIS DOCUMENT WITHOUT RELEASE SIGNATURES ARE CONSIDERED NOT CONTROLLED, HENCE WITHOUT ANY VALIDITY.

BAMA S.r.l. Via Novara, 20029 Turbigo, Italy - http://www.bama-technologies.com - Email [email protected] - tel. +39 0331898460
Filename: \\10.0.1.10\documenti\SISTEMA QUALITA' E AMBIENTE\7.Istruzioni tecniche\SPECIFICHE NUOVE RELEASE 08\BA010-CARBONIO\CLIENTI-BA010\RESTA\RESTA JOB 2918\BA010REV2.3-FQUEST-
08-BARHAIN-NC-JOB-29-18-280921-ENG.doc

You might also like