Critical Design Review
Critical Design Review
Y, N, F, O Comments
NA
REVIEW PREPARATION
1 Have standards been identified to
clearly define the review process?
2 Were guidelines used to prepare for
the review?
3 Has the project submitted any request
for deviations or waivers to the
defined process?
4 Have entrance and exit criteria been
established for the review?
5 Was an agenda prepared and
distributed in advance of the review?
6 Was the review package provided
with ample time to review?
7 Were the appropriate stakeholders in
attendance?
REVIEW CONTENT
8 Were the goals of the review and any
review prerequisites provided?
9 Was the review process addressed,
including the method for capturing
Requests for Action (RFAs), risks, or
issues?
10 Was an overview of the software
project/system provided (e.g.,
mission goals, key functionality,
operational characteristics)?
11 Is the Organization/Work Breakdown
Structure (WBS)/Project relationship
presented?
12 Is status included on action items
from the Preliminary Design Review
(PDR)?
13 Is IV & V status provided?
14 Are milestones, software builds, and
schedules presented?