New Fulcrum Canopies - Structural Drawings - Permit
New Fulcrum Canopies - Structural Drawings - Permit
com
CONCRETE: COLD-FORMED STEEL FRAMING: 1705.6 SPECIAL INSPECTION OF SOILS
CODE:
TERMS AND 2018 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC)
1. CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF ACI 1. ALL COLD-FORMED STEEL FRAMING SHALL BE FABRICATED AND
ERECTED IN ACCORDANCE WITH THE LATEST EDITION OF
SPECIAL INSPECTION FOR EXISTING SITE SOIL CONDITIONS, FILL
PLACEMENT AND LOAD-BEARING REQUIREMENTS SHALL BE AS REQUIRED
301, "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" AND
ABBREVIATIONS DESIGN LOADS:
ACI 318, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE".
SPECIFICATIONS FOR THE DESIGN OF COLD-FORMED STEEL
STRUCTURAL MEMBERS BY THE AMERICAN IRON AND STEEL
BY TABLE 1705.6.
2. ADDITION OF WATER TO THE BATCH FOR MATERIAL WITH INSUFFICIENT INSTITUTE AND THE STEEL STUD MANUFACTURERS ASSOCIATION AND
I.C.C. ESR-3064P). TABLE 1705.6: REQUIRED VERIFICATION AND INSPECTION OF SOILS
ABBRV TERM 1. ROOF: SLUMP WILL NOT BE PERMITTED, UNLESS THE SUPPLIER HAS
LIVE LOAD(UNREDUCIBLE) 12 PSF SPECIFICALLY WITHHELD WATER FROM THE BATCH AT THE PLANT. IN 2. STEEL FOR ALL MEMBERS AND FOR ALL STRAPS SHALL HAVE A
CONTINUOUS
(#) NUMERICAL QUANTITIES WHEN DEAD LOAD 8 PSF SUCH CASE THE MIX DESIGN AND TRUCK TICKET MUST CLEARLY MINIMUM YIELD STRENGTH OF 55,000 PSI.
ENCLOSED IN PARENTHESES 2. WIND LOAD: STATE THE MAXIMUM AMOUNT OF WATER THAT CAN BE ADDED TO THE 3. STEEL SHALL BE GALVANIZED AT LOCATIONS EXPOSED TO WEATHER VERIFICATION AND INSPECTION TASK
PERIODIC
A\E ARCHITECT/ENGINEER RISK CATEGORY II BATCH ON SITE. IN NO CASE SHALL THE DESIGN WATER TO AND WHENEVER NOTED ON THE DRAWINGS.
AB ANCHOR BOLT BASIC WIND SPEED, V : 101 MPH CEMENTITIOUS MATERIAL RATIO BE EXCEEDED. 4. ALL MEMBERS SHALL BE SECURELY SEATED FOR FULL BEARING
Mesa, AZ 85202
CD CONTRACT DOCUMENTS Kz: 0.88 REVIEW PRIOR TO PLACEMENT OF CONCRETE. REFERENCE ACI 318 7. STEEL STUD SIZES ARE AS INDICATED IN PLANS AND KEYNOTES. X
(480) 454-6408
CHAPTER 5, TABLE R5.3 FOR SPECIFIC REQUIREMENTS. THICKNESS REFERENCED IN THE DRAWINGS ARE AS FOLLOWS: AND HAVE REACHED PROPER MATERIAL.
CJ CONSTRUCTION JOINT ENCLOSURE CLASSIFICATION: OPEN BUILDING
CONTROL JOINT 3. SEISMIC LOADS: 5. DRILLED PIER CONCRETE SHALL BE CHANNELED TO FREE FALL DOWN
THE SHAFT WITHOUT STRIKING THE REINFORCING OR THE SIDES OF • 16 GAUGE MATERIAL - 0.059 INCHES 3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED X
CL CENTERLINE RISK CATEGORY II
THE SHAFT. MAXIMUM HEIGHT OF FREE-FALL IS 15'-0". • 14 GAUGE MATERIAL - 0.075 INCHES FILL MATERIALS.
CLR CLEAR IMPORTANCE FACTOR, Ie : 1.0
CMU CONCRETE MASONRY UNIT SEISMIC SITE CLASS: DEFAULT 6. CONCRETE PROPERTIES: • 12 GAUGE MATERIAL - 0.105 INCHES
• 10 GAUGE MATERIAL - 0.134 INCHES 4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT X
D DEPTH Ss: 0.172 THICKNESSES DURING PLACEMENT AND COMPACTION OF
DIA DIAMETER S1: 0.063 CONCRETE USE MINIMUM 28 DAY
NOTE: THE UNCOATED MINIMUM STEEL THICKNESS OF THE COLD-FORMED COMPACTED FILL.
DIM DIMENSION SDS: 0.183 COMPRESSIVE
DL DEAD LOAD SD1: 0.101 STRENGTH STEEL PRODUCTS AS DELIVERED TO THE JOB SITE SHALL NOT AT ANY
5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE X
EA EACH SEISMIC DESIGN CATEGORY: B LOCATION BE LESS THAN 95 PERCENT OF THE DESIGN THICKNESS
SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED
EL ELEVATION BASIC SEISMIC FORCE RESISTING SYSTEM: UNLESS NOTED OTHERWISE INDICATED ABOVE.
PROPERLY.
EQ EQUAL STEEL ORDINARY CANTILEVER COLUMN SYSTEMS ALL CONCRETE SHALL BE 2,500 PSI
1704.2.5 SPECIAL INSPECTION OF FABRICATORS:
EXT EXTERIOR R: 3.5
EW EACH WAY Ω: 2.5 PHOTOVOLTAIC PANELS: SPECIAL INSPECTION OF FABRICATION OF STRUCTURAL STEEL BEING
(F) FUTURE Cd: 3.0 2018 1705.3 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION
PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP IS REQUIRED.
FF FINISH FLOOR ELEVATION Cs: 0.052 1. THE PANEL MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE
FLR FLOOR BASE SHEAR, V: 0.052W PANELS AND THE DESIGN OF THE PANEL CONNECTIONS TO THE SPECIAL INSPECTION AND VERIFICATIONS FOR CONCRETE
EXCEPTION: SPECIAL INSPECTIONS OF FABRICATORS WITH ONE OF THE
FT FEET STRUCTURE INCLUDING ALL COMPONENTS REQUIRED TO MAKE THE CONSTRUCTION SHALL BE AS REQUIRED BY TABLE 1705.3.
FOLLOWING QUALIFICATIONS IS NOT REQUIRED:
FTG FOOTING GENERAL: CONNECTIONS. PHOTOVOLTAIC PANELS, COMPONENTS AND
21
• INTERNATIONAL ACCREDITATION SERVICE, INC. (IAS)APPROVED
20
GA GAUGE CONNECTIONS SHALL BE DESIGNED TO SUPPORT PANEL WEIGHT PLUS EXCEPTIONS: SPECIAL INSPECTIONS SHALL NOT BE REQUIRED FOR:
FABRICATOR.
4/
GALV GALVANIZED
/0
1. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS SNOW, WIND, OR SEISMIC LOADING, WHICHEVER COMBINATION 1. ISOLATED SPREAD CONCRETE FOOTINGS OF BUILDING THREE
08
• AISC CERTIFIED FABRICATOR (STD).
GC GENERAL CONTRACTOR REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE PRODUCES THE MOST SEVERE CONDITION IN ACCORDANCE WITH THE STORIES OR LESS ABOVE GRADE PLANE THAT ARE FULLY SUPPORTED
GSN GENERAL STRUCTURAL NOTES METHOD OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR INTERNATIONAL BUILDING CODE. ON EARTH OR ROCK.
THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR
HORIZ HORIZONTAL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND 2. OWNER TO PROVIDE PANEL CAPABLE OF SUPPORTING IN MANOR IN 2. CONTINUOUS CONCRETE FOOTINGS SUPPORTING WALLS OF Expires 6/30/2023
MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES
HSS HOLLOW STRUCTURAL PROCEDURES. WHICH IS INTENDED BY THESE DRAWINGS (I.E. SUPPORTED BY SHORT BUILDINGS THREE STORIES OR LESS ABOVE GRADE PLANE THAT ARE
THAT PROVIDE A BASIS FOR INSPECTION CONTROL OF THE
I SECTION MOMENT OF INERTIA 2. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND END, DUAL SUPPORTS, ETC). SUBMIT PANEL SPEC SHEETS FOR FULLY SUPPORTED ON EARTH OR ROCK WHERE:
WORKMANSHIP AND THE FABRICATOR’S ABILITY TO CONFORM TO
IBC INTERNATIONAL BUILDING CODE PROGRAMS IN CONNECTION WITH THE WORK THAT CONFORMS TO REVIEW PRIOR TO PURCHASING ANY PANELS. 3. THE FOOTINGS SUPPORT WALLS OF LIGHT-FRAME CONSTRUCTION;
APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS.
ID INSIDE DIAMETER THE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH 3. CONTRACTOR TO VERIFY PV PANELS WITH OWNER PRIOR TO 4. THE STRUCTURAL DESIGN OF THE FOOTING IS BASED ON A SPECIFIED
THE SPECIAL INSPECTOR SHALL REVIEW THE PROCEDURES FOR
KIP, K ONE THOUSAND POUNDS ADMINISTRATION (OSHA) SAFETY AND HEALTH STANDARDS FOR THE FABRICATION. COMPRESSIVE STRENGTH, f'c, NO GREATER THAN 2,500 PSI
COMPLETENESS AND ADEQUACY RELATIVE TO THE CODE REQUIREMENTS
KLF KIP PER LINEAR FOOT CONSTRUCTION INDUSTRY. 4. THIS IS A DEFERRED SUBMITTAL ITEM. REGARDLESS OF THE COMPRESSIVE STRENGTH SPECIFIED.
FOR THE FABRICATOR’S SCOPE OF WORK.
L STEEL ANGLE 3. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR 5. CONCRETE SLABS ON GRADE. STEEL REINFORCING STILL REQUIRES
LB POUND MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR SPECIAL INSPECTION.
LL LIVE LOAD ADDENDUM. STRUCTURAL STEEL:
LLBB LONG LEG BACK TO BACK 4. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. HE SHALL BE SPECIAL STRUCTURAL INSPECTIONS:
LLH LONG LEG HORIZONTAL RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN TABLE 1705.3: REQUIRED VERIFICATION AND INSPECTION OF
1. LATEST AISC AND AWS CODES APPLY. THE WORD APPROVED PER IBC/CBC SECTION 1704 AND 1705 SPECIAL INSPECTIONS ARE IN
LLV LONG LEG VERTICAL OPTION AND HE SHALL COORDINATE ALL DETAILS. INSPECTION 4.4 OF THE AISC CODE OF STANDARD PRACTICE FOR CONCRETE CONSTRUCTION
LSH LONG SIDE HORIZONTAL 5. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER ADDITION TO THE REQUIRED INSPECTION CONDUCTED BY THE BUILDING
STEEL BUILDINGS AND BRIDGES IS REDEFINED AS REVIEWED.
CONTINUOUS
LSV LONG SIDE VERTICAL GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS. WHERE NO JURISDICTION PER IBC/CBC SECTION 110.
Phoenix, AZ 85019
2. STEEL SHALL BE FINISHED AT LOCATIONS EXPOSED TO WEATHER THE TYPES OF WORK LISTED BELOW SHALL BE INSPECTED BY A SPECIAL
MCJ MASONRY CONTROL JOINTS SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO VERIFICATION AND REFERENCE IBC/CBC
PERIODIC
MECH MECHANICAL SIMILAR WORK ON THE PROJECT. INSPECTOR. INSPECTION STANDARD REFERENCE
(602) 512-4411
AND EXPOSURE CONDITIONS OF PROJECT LOCATION.
MFR MANUFACTURER 6. TYPICAL DETAILS ARE NOT CUT ON DRAWINGS, BUT APPLY UNLESS 3. WHEN STRUCTURAL STEEL IS FURNISHED TO A SPECIFIED MINIMUM
NA NOT APPLICABLE NOTED OTHERWISE. 1. ALL SPECIAL INSPECTORS SHALL BE UNDER THE SUPERVISION OF A
YIELD POINT GREATER THAN 36 KSI, THE ASTM OR OTHER REGISTERED CIVIL OR STRUCTURAL ENGINEER.
NTS NOT TO SCALE 7. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SPECIFICATION DESIGNATION SHALL BE INCLUDED NEAR THE
OC ON CENTER DIMENSIONS WITH ACTUAL SITE CONDITIONS AND GENERAL 2. THE QUALIFICATIONS OF ALL SPECIAL INSPECTORS SHALL BE
ERECTION MARK ON EACH SHIPPING ASSEMBLY OR IMPORTANT REVIEWED AND APPROVED BY THE STRUCTURAL ENGINEER OF 1. INSPECT REINFORCEMENT,
PERP PERPENDICULAR CONTRACTOR PRIOR TO START OF CONSTRUCTION. ALL DIMENSIONS CONSTRUCTION COMPONENT OVER ANY SHOP COAT OF PAINT PRIOR ACI 318: Ch. 1908.4
PL PLATE SHOWN ON STRUCTURAL DRAWINGS ARE TO ASSIST CONTRACTOR IN RECORD. INCLUDING PRESTRESSING X
TO SHIPMENT FROM THE FABRICATORS PLANT. 20, 25.2, 25.3,
PLF POUNDS PER LINEAR FOOT VERIFICATION. DO NOT SCALE DIMENSIONS FROM DRAWINGS. 3. THE MINIMUM QUALIFICATIONS FOR THE SPECIAL INSPECTORS ARE AS TENDONS, AND VERIFY
4. IF IT IS NECESSARY TO SPLICE ANY MEMBER, SPLICE LOCATIONS ARE 26.6.1-26.6.3
PSF POUNDS PER SQUARE FOOT 8. ITEMS SHOWN BY OTHER DISCIPLINES WITH REFERENCE TO FOLLOWS: PLACEMENT.
SUBJECT TO REVIEW BY STRUCTURAL ENGINEER. SPLICES SHALL BE
PSI POUNDS PER SQUARE INCH STRUCTURAL DRAWINGS BUT NOT SHOWN ON THESE STRUCTURAL FULL PENETRATION WELDED AND TESTED PER THIS SECTION. 2. REINFORCING BAR WELDING.
QA QUALITY ASSURANCE DRAWINGS SHALL BE CONSIDERED DESIGN BUILD ITEMS. • CONCRETE INSPECTION - I.C.C. CERTIFICATION IN REINFORCED AWS D1.4
INDICATE ALL SPLICE LOCATIONS, AND WELDING PROCEDURES ON CONCRETE OR E.I.T. CERTIFICATION. a. VERIFY WELDABILITY OF
QC QUALITY CONTROL CONTRACTOR SHALL SUBMIT DESIGN BY OTHERS FOR REVIEW ACI 318: 26.6.4
SHOP DRAWINGS FOR REVIEW PRIOR TO FABRICATION. • STRUCTURAL WELDING INSPECTION REINFORCING BARS.
REINF REINFORCING 5. ALL BEAMS SHALL BE ERECTED WITH THE NATURAL CAMBER b. INSPECT SINGLE PASS X
REQD REQUIRED • VISUAL TESTING - I.C.C. CERTIFICATION IN STRUCTURAL STEEL AND
UPWARDS. WELDING OR A.W.S. CERTIFIED WELD INSPECTOR (C.W.I.). FILLET WELDS, MAXIMUM
RFI REQUEST FOR INFORMATION FOUNDATIONS: 6. ALL BOLTS SHALL BE INSTALLED WITH STEEL WASHERS. • NON-DESTRUCTIVE TESTING - A.W.S. C.W.I. 5/16".
SF SQUARE FOOT 7. ALL WELDING BY WELDERS HOLDING VALID CERTIFICATES AND c. INSPECT ALL OTHER WELDS. X X
CHANDLER, AZ 85226
9. ALL WELDING PER AMERICAN WELDING SOCIETY STANDARDS. ALL 4. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: FOR PROPER APPLICATION 1908.8
VERT VERTICAL STRUCTURAL ENGINEER PRIOR TO PROCEEDING WITH WORK. WELDS ON DRAWINGS ARE SHOWN AS SHOP WELDS. CONTRACTOR
W/C WATER TO CEMENT RATIO 3. SPREAD FOOTINGS SHALL BEAR ON COMPACTED NATIVE SOILS. TECHNIQUES.
MAY SHOP WELD OR FIELD WELD AT THEIR DISCRETION. SHOP WELDS • THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK REQUIRING
W/O WITHOUT BOTTOM OF FOOTINGS SHALL BEAR AT A DEPTH NOT LESS THAN 2.0 OR FIELD WELDS SHALL BE SHOWN ON SHOP DRAWINGS. 8. VERIFY MAINTENANCE OF
WL WINDLOAD FT BELOW LOWEST ADJACENT GRADE WITHIN 5 FEET OF STRUCTURE SPECIAL INSPECTION FOR CONFORMANCE WITH THE APPROVED ACI 318: 1908.9
10. SLAG SHALL BE REMOVED FROM ALL COMPLETED WELDS, AND THE SPECIFIED CURING X
OR FOUNDATION. FOUNDATION EXCAVATIONS SHALL BE INSPECTED DESIGN DRAWINGS AND SPECIFICATIONS. 26.5.3-26.5.5
WELD AND ADJACENT BASE METAL SHALL BE CLEANED BY BRUSHING • THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO BE TEMPERATURE AND
BY GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF CONCRETE. OR OTHER SUITABLE MEANS. WELDED JOINTS SHALL NOT BE PAINTED TECHNIQUES.
4. DRILLED POLE FOUNDATIONS SHALL BEAR ON MACHINE CLEANED, KEPT AT THE SITE FOR USE BY THE BUILDING OFFICIAL, THE
UNTIL AFTER WELDING HAS BEEN COMPLETED AND THE WELD CONTRACTOR, THE STRUCTURAL ENGINEER OF RECORD, AND THE
INSPECTED SOIL STRATA. POLE FOUNDATIONS WERE DESIGNED IN ACCEPTED. 12. INSPECT FORMWORK FOR
ACCORDANCE WITH THE PRESCRIPTIVE METHOD OF IBC/CBC ARCHITECT OF RECORD. IF SPECIAL INSPECTION IS PROVIDED BY SHAPE, LOCATION AND X ACI 318:26.11.2
11. ALL STRUCTURAL STEEL SHALL BE FABRICATED BY A FABRICATOR ANYONE OTHER THAN THE STRUCTURAL ENGINEER OF RECORD,
SECTION 1807.3.2. FOR TOP OF POLE FOUNDATION ELEVATIONS, SEE WITH ANY ONE OF THE FOLLOWING MINIMUM QUALIFICATIONS. DIMENSIONS OF THE (b)
FOUNDATION PLANS AND SECTIONS. IF WATER IS ENCOUNTERED INSPECTION REPORTS SHALL BE SUBMITTED TO THE OFFICE OF THE CONCRETE MEMBER BEING
QUALIFICATIONS SHALL BE IN EFFECT AT TIME OF BID. STRUCTURAL ENGINEER ON A WEEKLY BASIS. ALL DISCREPANCIES
DURING DRILLING, STOP AND CONSULT STRUCTURAL ENGINEER OR 12. AISC CERTIFIED FABRICATOR (STD). FORMED.
GEOTECHNICAL ENGINEER FOR RESOLUTION. SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
13. STEEL PROPERTIES CONTRACTOR FOR CORRECTION, THEN IF UNCORRECTED, TO THE
• WIDE FLANGE COLUMNS, BEAMS AND TEES: ASTM A992 (Fy = 50 DESIGN AUTHORITY AND THE BUILDING OFFICIAL.
KSI) • UPON COMPLETION OF THE ASSIGNED WORK, THE SPECIAL
SHOP DRAWINGS: • STEEL PLATES: ASTM A572 (Fy = 50 KSI) INSPECTOR SHALL COMPLETE AND SIGN A FINAL REPORT CERTIFYING
• CHANNELS AND ANGLES: ASTM A36 (Fy = 36 KSI) THAT TO THE BEST OF HIS KNOWLEDGE, THE WORK IS IN
1. SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS • HSS RECTANGULAR STEEL: ASTM A500 Gr. B (Fy = 46 KSI) CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS,
AND ITEMS REQUIRED BY ARCHITECTURAL SPECIFICATIONS. UNITED • BOLTS: ASTM A325 OR ASTM A F1852 TWIST-OFF TYPE AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE.
STRUCTURAL DESIGN, LLC. ASSUMES NO RESPONSIBILITY FOR THE • ANCHOR RODS: ASTM F1554 Gr. 55 (Fy = 55 KSI)
FAILURE OF THE CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR 14. STEEL BOLTS SHALL BE PRETENSIONED UNLESS OTHERWISE NOTED 5. DUTIES AND RESPONSIBILITIES OF THE CONTRACTOR:
REVIEW. AS A SNUG-TIGHT CONNECTION ON THE DRAWINGS OR DETAILS. ONE
2. ITEMS NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS SHALL BE OF THE FOLLOWING METHODS SHALL BE USED TO ASSURE ADEQUATE • NOTIFY THE RESPONSIBLE INSPECTOR THAT WORK IS READY FOR
FLAGGED UPON CONTRACTORS REVIEW PRETENSIONING IS ACHIEVED: INSPECTION AT LEAST ONE WORKING DAY (24 HOURS MINIMUM)
3. THE CONSTRUCTION DOCUMENTS MAY NOT BE REPRODUCED FOR USE • TURN-OF-NUT METHOD BEFORE SUCH INSPECTION IS REQUIRED.
AS SHOP DRAWINGS. • DIRECT TENSION INDICATOR WASHERS • ALL WORK REQUIRING SPECIAL STRUCTURAL INSPECTION SHALL Sheet List
4. ELECTRONIC FILES OF CONSTRUCTION DOCUMENTS WILL NOT BE • CALIBRATED WRENCH REMAIN ACCESSIBLE AND EXPOSED UNTIL IT IS OBSERVED BY THE
MADE AVAILABLE FOR USE AS SHOP DRAWINGS. • TWIST-OFF TYPE BOLT SPECIAL STRUCTURAL INSPECTOR.
5. FIELD VERIFY ALL DIMENSIONS AND FINISHED GRADE PRIOR TO Sheet
CONSTRUCTION AND PRIOR TO BEGINNING SHOP DRAWINGS. Number
6. THE ENGINEER OF RECORD HAS THE RIGHT TO APPROVE OR
6. SPECIAL INSPECTION Sheet Name No. Description Date
DISAPPROVE ANY CHANGES TO CONTRACT DOCUMENTS AT ANYTIME
• INSPECTION OF FABRICATORS
S0.1 GENERAL STRUCTURAL NOTES
BEFORE OR AFTER SHOP DRAWING REVIEW. STEEL REINFORCING:
7. ITEMS OMITTED OR SHOWN INCORRECTLY AND ARE NOT FLAGGED BY
• INSPECTION OF CONCRETE CONSTRUCTION S2.1 DOUBLE POST STRUCTURE PLANS
1. ALL BARS PER CRSI SPECIFICATIONS AND HANDBOOK. LATEST ACI • INSPECTION OF STRUCTURAL STEEL
THE STRUCTURAL ENGINEER OR ARCHITECT SHALL NOT BE S2.2 DOUBLE POST STRUCTURE PLANS
CODE AND DETAILING MANUAL APPLY. SECURELY TIE ALL BARS IN • INSPECTION OF SOILS
CONSIDERED CHANGES TO THE CONTRACT DOCUMENTS.
8. SHOP DRAWINGS DO NOT REPLACE THE CONTRACT DOCUMENTS. LOCATION BEFORE PLACING CONCRETE. REINFORCING BAR SPACING S2.3 TRIPLE POST STRUCTURE PLANS
GIVEN ARE MAXIMUM ON CENTERS. SEE TABLES ON GSN FOR ADDITIONAL INFORMATION.
REVIEWING IS INTENDED ONLY AS AN AID TO THE CONTRACTOR IN S2.4 TRIPLE POST STRUCTURE PLANS
OBTAINING CORRECT SHOP DRAWINGS. IT IS THE CONTRACTOR’S 2. ALL REINFORCING TO BE WELDED SHALL BE WELDED IN ACCORDANCE
RESPONSIBILITY TO ENSURE ALL ITEMS ARE CONSTRUCTED WITH AWS D1.4. NO TACK WELDING OF REINFORCING BARS IS S4.1 SOLAR CANOPY DETAILS
ACCORDING TO THE CONTRACT DOCUMENTS. ALLOWED WITHOUT PRIOR REVIEW OF PROCEDURE BY STRUCTURAL
ENGINEER.
3. REINFORCING LAP SPLICES IN CONCRETE SHALL BE PER TYPICAL
DETAIL UNLESS NOTED OTHERWISE. ALL SPLICE LOCATIONS ARE
SUBJECT TO APPROVAL. PROVIDE BENT CORNER BARS TO MATCH AND PROJECT NUMBER: 21120
LAP WITH HORIZONTAL BARS AT CORNERS AND INTERSECTIONS OF
FOOTINGS AND WALLS. DRAWN BY: KS
4. TYPICAL REINFORCING BAR STRENGTHS CHECKED BY: JE
5. REINFORCING (WELDABLE): ASTM A706, DEFORMED, Fy = 60 KSI
6. TYPICAL CLEAR CONCRETE COVERAGE DATE: 05/06/2021
• CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO
EARTH: 3"
• FORMED CONCRETE EXPOSED TO EARTH OR WEATHER:
#6 AND LARGER: 2" SHEET NAME
#5 AND SMALLER: 1 1/2"
GENERAL
ALL OTHERS PER LATEST EDITION OF ACI 318.
STRUCTURAL NOTES
S0.1
SHEET NOTES
www.unitedstr.com
a. FOR STRUCTURE LOCATIONS REFERENCE PROJECT SITE PLAN.
HIGH SIDE COLUMN SPACING AND LOCATIONS SHALL BE COORDINATED WITH
PROJECT ARCHITECT OR PROFESSIONAL RESPONSIBLE FOR SITE PLAN.
b. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DIMENSIONS,
ELEVATIONS WHERE SHOWN ARE TO BE USED AS AN AID AND SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR PRIOR TO
30' - 9"
REF S2.1 CONSTRUCTION.
c. FOR ADDITIONAL INFORMATION, REFERENCE GENERAL STRUCTURAL
NOTES.
PV PANEL INFORMATION
Mesa, AZ 85202
CONSTRUCTION. ALL PANEL INFORMATION INDICATED IN THESE
(480) 454-6408
DRAWINGS IS FOR REFERENCE ONLY AND SHALL BE VERIFIED WITH THE
OWNER, THE ELECTRICAL DRAWINGS AND THE GENERAL CONTRACTOR
HIGH SIDE PRIOR TO FABRICATION AND PRIOR TO CONSTRUCTION.
C. THE OWNER IS TO PROVIDE A PANEL CAPABLE OF SUPPORTING IN
MANOR IN WHICH IS INTENDED BY THESE DRAWINGS (I.E. SUPPORTED
BY SHORT END, DUAL SUPPORTS, ETC). SUBMIT PANEL SPEC SHEETS
FOR REVIEW PRIOR TO PURCHASING ANY PANELS.
D. THE PANEL MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE
PANELS INCLUDING ALL IT'S COMPONENTS. PHOTOVOLTAIC PANELS AND
IT'S COMPONENTS SHALL BE DESIGNED TO SUPPORT PANEL WEIGHT
58' - 0"
REF S2.3 PLUS SNOW, WIND, OR SEISMIC LOADING, WHICHEVER COMBINATION
PRODUCES THE MOST SEVERE CONDITION IN ACCORDANCE WITH THE
BUILDING CODE
21
20
58' - 0"
4/
/0
08
KEYNOTES Expires 6/30/2023
5 10
S4.1
Phoenix, AZ 85019
OVERALL LAYOUT - Dependent 1
2 NO
(602) 512-4411
12
S4.1
7T
W14X38 W14X38
6
W12X26
W12X26
W12X26 W12X26
8T
1
10 DOUBLE POST - 7 DEG
S2.2
S4.1 3 NO SCALE
S2.1
SHEET NOTES
www.unitedstr.com
a. FOR STRUCTURE LOCATIONS REFERENCE PROJECT SITE PLAN.
COLUMN SPACING AND LOCATIONS SHALL BE COORDINATED WITH
PROJECT ARCHITECT OR PROFESSIONAL RESPONSIBLE FOR SITE PLAN.
b. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DIMENSIONS,
ELEVATIONS WHERE SHOWN ARE TO BE USED AS AN AID AND SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR PRIOR TO
CONSTRUCTION.
c. FOR ADDITIONAL INFORMATION, REFERENCE GENERAL STRUCTURAL
NOTES.
PV PANEL INFORMATION
Mesa, AZ 85202
CONSTRUCTION. ALL PANEL INFORMATION INDICATED IN THESE
(480) 454-6408
DRAWINGS IS FOR REFERENCE ONLY AND SHALL BE VERIFIED WITH THE
OWNER, THE ELECTRICAL DRAWINGS AND THE GENERAL CONTRACTOR
PRIOR TO FABRICATION AND PRIOR TO CONSTRUCTION.
C. THE OWNER IS TO PROVIDE A PANEL CAPABLE OF SUPPORTING IN
MANOR IN WHICH IS INTENDED BY THESE DRAWINGS (I.E. SUPPORTED
BY SHORT END, DUAL SUPPORTS, ETC). SUBMIT PANEL SPEC SHEETS
FOR REVIEW PRIOR TO PURCHASING ANY PANELS.
D. THE PANEL MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE
PANELS INCLUDING ALL IT'S COMPONENTS. PHOTOVOLTAIC PANELS AND
IT'S COMPONENTS SHALL BE DESIGNED TO SUPPORT PANEL WEIGHT
PLUS SNOW, WIND, OR SEISMIC LOADING, WHICHEVER COMBINATION
PRODUCES THE MOST SEVERE CONDITION IN ACCORDANCE WITH THE
BUILDING CODE
21
20
4/
/0
08
KEYNOTES Expires 6/30/2023
7T 8T
Phoenix, AZ 85019
3700 N 36th Ave
(602) 512-4411
30' - 9"
9' - 0 1/2"
11 1/4"
42 1/2"
23"
42 1/2"
23"
42 1/2" 30' - 11 5/8
23" "
42 1/2"
23"
42 1/2"
SLOPE 7 23"
° 42 1/2"
CHANDLER, AZ 85226
S4.1 S4.1
W12X26
5
S4.1
11
S4.1
(+1'-0" ALLOWED FOR TERRAIN)
21' - 9 1/2" AT COLUMN
W12X26
CLEAR
17' - 0"
2 1 2 1
9
S4.1 S4.1
No. Description Date
FOUNDATION PLAN
0' - 0"
BOTTOM OF COLUMN
-4' - 0"
SHEET NAME
DOUBLE POST
STRUCTURE PLANS
1 DOUBLE POST 7 DEG TEE SECTION
1/4" = 1'-0"
S2.2
1 2 SHEET NOTES
www.unitedstr.com
a. FOR STRUCTURE LOCATIONS REFERENCE PROJECT SITE PLAN.
11' - 6" 25' - 0" MAX
25'-0" MAX HIGH SIDE COLUMN SPACING AND LOCATIONS SHALL BE COORDINATED WITH
PROJECT ARCHITECT OR PROFESSIONAL RESPONSIBLE FOR SITE PLAN.
EQ EQ EQ 6' - 0" EQ b. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DIMENSIONS,
TYP TYP TYP ELEVATIONS WHERE SHOWN ARE TO BE USED AS AN AID AND SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR PRIOR TO
CONSTRUCTION.
30' - 9"
REF S2.1 c. FOR ADDITIONAL INFORMATION, REFERENCE GENERAL STRUCTURAL
NOTES.
PV PANEL INFORMATION
Mesa, AZ 85202
CONSTRUCTION. ALL PANEL INFORMATION INDICATED IN THESE
(480) 454-6408
DRAWINGS IS FOR REFERENCE ONLY AND SHALL BE VERIFIED WITH THE
12 OWNER, THE ELECTRICAL DRAWINGS AND THE GENERAL CONTRACTOR
7
S4.1 PRIOR TO FABRICATION AND PRIOR TO CONSTRUCTION.
HIGH SIDE C. THE OWNER IS TO PROVIDE A PANEL CAPABLE OF SUPPORTING IN
MANOR IN WHICH IS INTENDED BY THESE DRAWINGS (I.E. SUPPORTED
9T BY SHORT END, DUAL SUPPORTS, ETC). SUBMIT PANEL SPEC SHEETS
W12X65 W12X65 FOR REVIEW PRIOR TO PURCHASING ANY PANELS.
D. THE PANEL MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE
PANELS INCLUDING ALL IT'S COMPONENTS. PHOTOVOLTAIC PANELS AND
IT'S COMPONENTS SHALL BE DESIGNED TO SUPPORT PANEL WEIGHT
PLUS SNOW, WIND, OR SEISMIC LOADING, WHICHEVER COMBINATION
58' - 0"
REF S2.3 PRODUCES THE MOST SEVERE CONDITION IN ACCORDANCE WITH THE
BUILDING CODE
W14X43
W14X43
21
20
58' - 0"
4/
7° SLOPE
/0
08
KEYNOTES Expires 6/30/2023
3 SAG ROD AS SHOWN ON PLANS, (1) MINIMUM AT SPANS LESS THAN 18'-0"
AND (2) MINIMUM AT SPANS LESS THAN 27'-0". REFERENCE DETAIL 10/S4.1.
LOW SIDE
4 (1) SAG ROD REQUIRED BETWEEN SUPPORT AND CANTILEVER END AS
SHOWN. REFERENCE DETAIL 10/S4.1. SAG ROD NOT REQUIRED WHERE
CANTILEVER IS LESS THAN 5'-0".
5 DO NOT SPLICE PURLINS AT SUPPORT AT CANTILEVER ENDS.
6 16 GAUGE END CAP WITH 2" LEGS EACH END OF STRUCTURE.
7 BEAM FLANGE BRACES AS SHOWN ON PLANS. REFERENCE DETAIL 6/S4.1
FOR MORE INFORMATION.
Phoenix, AZ 85019
OVERALL LAYOUT
(602) 512-4411
SCALE
W12X53 W12X53
10T
7° SLOPE
W14X43
W14X43
W12X40 W12X40
11T
1
TRIPLE POST
S2.4 STRUCTURE PLANS
www.unitedstr.com
a. FOR STRUCTURE LOCATIONS REFERENCE PROJECT SITE PLAN.
COLUMN SPACING AND LOCATIONS SHALL BE COORDINATED WITH
PROJECT ARCHITECT OR PROFESSIONAL RESPONSIBLE FOR SITE PLAN.
b. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DIMENSIONS,
ELEVATIONS WHERE SHOWN ARE TO BE USED AS AN AID AND SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR PRIOR TO
CONSTRUCTION.
c. FOR ADDITIONAL INFORMATION, REFERENCE GENERAL STRUCTURAL
NOTES.
PV PANEL INFORMATION
Mesa, AZ 85202
CONSTRUCTION. ALL PANEL INFORMATION INDICATED IN THESE
(480) 454-6408
DRAWINGS IS FOR REFERENCE ONLY AND SHALL BE VERIFIED WITH THE
OWNER, THE ELECTRICAL DRAWINGS AND THE GENERAL CONTRACTOR
PRIOR TO FABRICATION AND PRIOR TO CONSTRUCTION.
C. THE OWNER IS TO PROVIDE A PANEL CAPABLE OF SUPPORTING IN
MANOR IN WHICH IS INTENDED BY THESE DRAWINGS (I.E. SUPPORTED
BY SHORT END, DUAL SUPPORTS, ETC). SUBMIT PANEL SPEC SHEETS
FOR REVIEW PRIOR TO PURCHASING ANY PANELS.
D. THE PANEL MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE
PANELS INCLUDING ALL IT'S COMPONENTS. PHOTOVOLTAIC PANELS AND
IT'S COMPONENTS SHALL BE DESIGNED TO SUPPORT PANEL WEIGHT
PLUS SNOW, WIND, OR SEISMIC LOADING, WHICHEVER COMBINATION
PRODUCES THE MOST SEVERE CONDITION IN ACCORDANCE WITH THE
BUILDING CODE
21
20
4/
/0
08
KEYNOTES Expires 6/30/2023
Phoenix, AZ 85019
3700 N 36th Ave
(602) 512-4411
9T 10T 11T
12' - 6 1/2" 58' - 0" 58' - 0"
42 1/2"
23" 42 1/2"
CHANDLER, AZ 85226
23" 42 1/2"
23" 42 1/2"
23" 42 1/2"
23" 42 1/2"
8 23" 42 1/2"
23" 42 1/2"
11 23" 58' - 5 1/4"
42 1/2"
S4.1 7 23" 42 1/2"
23" 42 1/2"
5 23" 42 1/2"
S4.1 W14X43 23" 42 1/2"
7° SLOPE 23" 42 1/2"
23" 42 1/2" 12' - 4 1/2"
23" 42 1/2"
17 23" 42 1/2"
23" 42 1/2"
S4.1 23" 42 1/2"
8
5
S4.1 W14X43
17
(+1'-0" ALLOWED FOR TERRAIN)
S4.1
32' - 4 3/4" AT COLUMN
6
25' - 3 3/8" AT COLUMN
W12X65
5 S4.1
S4.1 11
W12X40
1 9 1 9
2 2 1
2
S4.1 S4.1 S4.1
FOUNDATION PLAN
0' - 0" PROJECT NUMBER: 21120
DRAWN BY: KS
www.unitedstr.com
1. STEEL PURLIN, SEE PLANS 1. STEEL PURLIN, SEE PLANS 1. STEEL BEAM, FOR TILT 1 1. STEEL COLUMN PER PLAN.
5
AND GSN FOR SIZE, GAUGE AND GSN FOR SIZE, GAUGE 4 DIRECTION SEE SECTIONS 2. CONCRETE POLE FOOTING
6 AND FINISH. AND FINISH. AND ELECTRICAL 3. (2) #7 BARS EACH SIDE OF
LIP
2. SOLAR PANELS BY OTHERS. 2. SOLAR PANELS BY OTHERS. DRAWINGS. STEEL COLUMN (4 - TOTAL).
DEPTH
3. THRU BOLT BY PANEL MFR. 3. THRU BOLT BY PANEL MFR 2. STEEL COLUMN. WELD TO EACH SIDE OF
(1/4" OR M6 DIAMETER (1/4" OR M6 DIAMETER 3. 3/4" X WIDTH COLUMN (OR 2 COLUMN AS INDICATED.
LIP
MINIMUM). MINIMUM). 5/16 BEAM, WHICH EVER IS 4. FINISHED GRADE, ASPHALT
4. SPACING BETWEEN LONG 4. SPACING BETWEEN PANELS, GREATER), Fy = 50 KSI OR SLAB AS OCCURS.
SIDE OF PANELS, TYPICAL. TYPICAL. CONTRACTOR TO MINIMUM. 5. CENTERLINE OF STEEL
5 5. SPACING BETWEEN SHORT VERIFY PURLIN SPACING WITH 4. 1/2" FULL DEPTH WEB COLUMN AND CONCRETE
SIDE OF PANELS, TYPICAL. PANEL AND BRACKET STIFFENERS EACH SIDE OF FOOTING.
5
CONTRACTOR TO VERIFY 2 SPECIFICATIONS PRIOR TO COLUMN, AS SHOWN TYP. 6. ALL STEEL BELOW GRADE
AND BRACKET 5. MINIMUM LIP LENGTH SHALL 2" 3" 3" 3" 3" 2" BOLTS EACH SIDE OF BEAM, MINIMUM CONCRETE.
SPECIFICATIONS PRIOR TO 3 3 MEET OR EXCEED THE CENTERED ON BEAM GAUGE 7 7. PROVIDE 6" EXPOSED PIER AT
INSTALLATION. 1/2" FOLLOWING: (8 TOTAL). TENSION BOLTS LOCATIONS OUTSIDE PAVED
6. END CAP. C-SHAPES SNUG TIGHT. AREAS.
• 16 GAUGE - 0.773 INCHES 8. PROVIDE SLOPPED SURFACE
• 14 GAUGE - 0.800 INCHES AT TOP TO PREVENT
Mesa, AZ 85202
4 8
• 12 GAUGE - 0.885 INCHES 3 ACCUMULATION OF WATER.
(480) 454-6408
1 5
3/8
2
4'-0" MINIMUM
NO SCALE NO SCALE NO SCALE
2"
21
PURLIN. PURLIN. PLANS.
20
4/
2. C2"x1"x14 GAUGE STEEL SAG 2. SOLAR PANELS BY OTHERS. 2. STEEL BEAM.
/0
2 1
TYPICAL SAG ROD
08
2 ROD BRACE BOTTOM OF 3. THRU BOLT PER PANEL MFR. 3. 3/16"x8"x6" (LSH) STEEL
PURLINS. SEE PLANS FOR (1/4" OR M6 DIAMETER PLATE AT 9" DEEP PURLINS
1 LOCATIONS. REFERENCE MINIMUM). 1/8 WITH (6) #12 SELF TAPPING Expires 6/30/2023
3 DETAIL 10/S3.1 FOR SECTION 3 2 1 3 4. L2"x2"x16 GAUGE STEEL SAG SCREWS. TYP EACH
INFORMATION. ANGLE WHERE SHOWN ON 4. PURLIN SPLICE AT INTERIOR BAR 1/4 6
3 3. (2) #12 SELF DRILLING PLANS. ATTACH WITH (2) #12 BEAMS ONLY.
SCREWS AT EACH PURLIN. SELF DRILLING SCREWS AT 5. 2"x14 GAUGE FLANGE
SCREWS SHALL BE LONG EACH PURLIN. BRACE STRAP WHERE
ENOUGH SO THAT AT LEAST 3 5. AT CONTRACTORS OPTION, SHOWN ON PLANS.
6"
EXPOSED THREADS EXIST ON USE 1 1/2"x1 1/4"x18 GAUGE 6. AT CONTRACTORS OPTION,
3
THE PROJECTED END. STEEL HAT CHANNEL SAG SCREW STRAP TO PURLIN
SECTION X ROD IN LIEU OF L2"x2"x14 3 WITH (2) #12 SELF TAPPING
2 GAUGE STEEL SAG ROD. SCREWS ILO WELD.
3 7. PROVIDE (2) HILTI 0.157" DIA.
4 3
X XU POWDER ACTUATED
6 FASTENERS ILO WELD.
1'-0" MAX
3" MIN.
5
Phoenix, AZ 85019
3700 N 36th Ave
(602) 512-4411
2
4, 5
2' - 0" DIA
7
UNO
1
STEEL SAG ROD AT BOTTOM FLANGE OF STEEL PURLINS SAG ROD AT STEEL PURLINS ATTACHMENT TYPICAL PURLIN TO STEEL BEAM CONNECTION STEEL COLUMN AT POLE FOOTING CONNECTION
14 NO SCALE 10 NO SCALE 6 NO SCALE 2 NO SCALE
2.
SPLICE LOCATIONS.
3/4" THICK STEEL END PLATE
2. STEEL PURLIN, ATTACH TO
BEAM PER OTHER DETAILS.
FOOTING SCHEDULE 2. CONCRETE SPREAD FOOTING,
SEE SCHEDULE THIS DETAIL
CHANDLER, AZ 85226
HIGH STRENGTH BOLTS EACH MFR.(1/4" OR M6 DIAMETER VERTICAL WELDED TO EACH
SIDE OF BEAM FLANGE (8 - 3 1 4 MINIMUM). SIDE OF COLUMN FLANGE (6
TOTAL). 5. OPTIONAL MITERED END CUT. DOUBLE POST #6 AT 10" O.C. EACH WAY TOTAL PER COLUMN).
10'-0"x5'-6"x2'-0" 0'-0" 3,000 PSI
STRUCTURE TOP AND BOTTOM 4. FINISHED GRADE OR SLAB AS
TRIPLE POST #6 AT 10" O.C. EACH WAY OCCURS.
10'-0"x5'-6"x2'-0" 0'-0" 3,000 PSI 5. CENTERLINE OF STEEL
STRUCTURE TOP AND BOTTOM
COLUMN AND CONCRETE
"e", NOTE 7 FOOTING WIDTH.
6. CENTERLINE OF FOOTING
2 LENGTH.
7. OFFSET COLUMN PER
FOOTING SCHEDULE. WHERE
FOOTING ECCENTRICITY
EXISTS, LONGER FOOTING TOE
SHALL OCCUR ON THE SAME
SIDE OF THE COLUMN.
5 1 8. PROVIDE SLOPPED SURFACE
AT COLUMN TO PREVENT
ACCUMULATION OF WATER
5 6 AGAINST STEEL.
45°
2 1/2"
3
3"
2
PROJECT NUMBER: 21120
THICKNESS
6"
DRAWN BY: KS
3"
6"
CHECKED BY: JE
2 1/2"
DATE: 05/06/2021
7"
2"
SHEET NAME
"e", NOTE 7
TYP EACH
BAR 3/8
5 6 SOLAR CANOPY
LENGTH DETAILS
*THIS DETAIL MAY BE USED IN LIEU OF DETAIL 2/S4.1