AuditReport Ra - Ha 50253631 Adinath Forging P LTD 50253631 - IATF16 26.jun.2021 27.jun.2021
AuditReport Ra - Ha 50253631 Adinath Forging P LTD 50253631 - IATF16 26.jun.2021 27.jun.2021
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 1/24
Audit report
Table of contents
Audit data 3
Organization information 4
Processes 6
Process Marketing 9
Process Purchase 10
Process Production planning & control, Production (Stamping, Welding and Machining ) 12
Process Quality 13
Process HR 15
Process Maintainance 16
Manufacturing processes 19
Customer information 21
Audit conclusion 22
Results 23
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 2/24
Audit report
Audit data
Audit basic data
Audit days 2
Audit team
Observer(s)
Name Company
Technical expert
Name
Translator(s)
Name Company
Witnessed No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 3/24
Audit report
Organization information
Organization information
Division
State Haryana
City Rohtak
Street 2
Country India
Certificate information
Certification structure
Comments about the design activity Parts are made as per customer drawing
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 4/24
Audit report
Number of employees
Dedicated to Automotive
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 5/24
Audit report
Processes
Organization's process name Is the process a Is it an on site process? Is it a remote process?
manufacturing process?
Marketing No No Yes
Purchase No No Yes
HR No No Yes
Maintainance No No Yes
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 6/24
Audit report
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 7/24
Audit report
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 8/24
Audit report
Process Marketing
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 9/24
Audit report
Process Purchase
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 10/24
Audit report
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 11/24
Audit report
Process Production planning & control, Production (Stamping, Welding and Machining )
Process data
Organization's process name Production planning & control, Production (Stamping, Welding and
Machining )
Process performance
Audit information Production process audited, Stamping, Machining, Welding. Production is performed under
controlled conditions. PFD, PFMEA, Control Plan / PQCS, SOP / WI, Inspection Standards are
available at place of use and well aware to the concerned users. The input for the manufacturing is
the production plan from PPC. Planning seen for the month of April & May'2021 for parts: Tow
Hook and Round Head Special. The risks related to the processes are identified and analysis of the
same was evident.
Control over manufacturing processes are verified for different samples and found to be effective.
Set up and process controls are exercised at beginning of shift & defined periodic intervals and
records are maintained. Production process is assessed for below samples:
• Restrictor: 89221-AFL3-S-01-01, FMEA: AFL/02/FMEA/S01, CP: AFL/01/CP/S01, : Customer:
Adinath Forging
• Round Head Special: 0105HG0370N, PFMEA/AFL/01/256,, Control Plan: AFL/01/CP/258
Product parameters and process parameters are monitored through regular inspections /
verification as per control plan / process plan and SOP's. Various in process inspections are
performed as per the quality standard and records are maintained. Necessary corrective actions
were evident to reduce in process & final rejections. Various Visual controls, first-piece approvals,
on-line verification, and traceability records are well implemented for product & process control. All
production processes are covered in all working shifts during this assessment. Outgoing product
quality compliance is well controlled by competent persons. Set up report sampled dated dated
welding 17.6.21, Part Toe Hook, Total Length: 26.24-26.28, welding done in Mig-02, parameters
checked Voltage, Current, Gas flow etc. verified as per set up dated 17.6.21, Operator Bhuvan
Sunil. Process: Drilling & Facing of Part Round Head Special, process set up verified dated 26.6.21
and parameters checked: ID: 5.05, Drill Length: 9.8-2.00, Operator: Ishrawat, Stamping process:
Blanking Die: 74.50-75.00 mm, Thickness: 0.95 -1.05mm report dated 27.6.2021. Pokayoke
blanking: stopper given in tool, Draw tool: Guide Pin.
Operator competency verified for Ram Kadam, Ram Karan, Manju, Sunil (L-3 & L-4) and found good.
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 12/24
Audit report
Process Quality
Process data
Process performance
Audit information Customer complaint: 2020-2021: 0 Complaints, 2021-2022: 1 one complaint dated 21.6.2021, there
is reducing trend which is a good sign for the organization. Complaint of Part: Body Fuel Inlet:
89221-57L10, Issue: Total length uneven, R/Cause: Butting of part not ok, CA: Guide pin
implemented to avoid tilt side push.
Process audit plan AFL/FM/QA/19 frequency once in 6 months, verified samples:
CNC process dated 15.11.2020, Drilling dated 21.4.2021, Welding: dated 27.5.2021 & 10.12.2020,
Stamping (Press) dated 27.5.21
Product audit plan AFL/FM/QA/76 frequency once in 6 months, verified samples:
Part: Bolt Heater: M6 1.0x25 dated 10.5.21, Part: M8 Sq. Weld Nut dated 15.4.21: M8x1.25x22 Bolt
Front Bumper dated 7.4.21
MSA process for both variable and attribute studies carried out as per plan and defined schedule.
Samples for MSA also verified and found well implemented & controlled, as below:
• Micrometer (AFL-01-MM-018), GRR Study dated 12-Oct-2020, % GRR – 8.87, NDC – 5.82
• Vernier Caliper (AFL-01-MM-82) , GRR Study dated 09-Nov-2020, % GRR – 17.04%, NDC – 8.15
Layout inspection of parts are being ensured as per plan and defined frequency. Layout plan in
place. Samples for layout:
Part: AFL-4-025 dated 5.20.2020, Part: aFL-D-1279 Dia 10 x 184 Rod dated 12.4.2020
Part: M16x2.0x67 Hex Head Solder Bolt : AFL-4-843 dated 21/6/2021
SPC process studies carried out as per plan and defined schedule. Samples for SPC also verified
Sleeve AFL-4-10-02 Dia 24.5 x 56: Cpk3.27 Feb'21, Body Dia: 13.40-13.60 AFL4-0942 study dated
Nov'20
Description of the interactions with Interface with Calibration with Supporting site at Jind Road
supporting / supported processes at
other sites(s) and/or remote location(s)
audited
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 13/24
Audit report
Process data
Is it a remote process? No
Process performance
Audit information Documented planned tool maintenance process is defined and implemented. Adequate resources
are available and provided as per the requirement for the tool maintenance process. The risk
analysis is done for the tool maintenance process and the risk mitigation measures are
implemented. Tool room is well managed as per defined procedure. Tool room is mainly
responsible for manufacturing, preventive maintenance and breakdown maintenance of press
tools. Samples verified for below tools, frequency 6 monthly or no. of shots, which ever is earlier
Following samples verified a
Tool: Extension Wheel House: AFL3S02 dated 11.5.21. Life monitoring 2.5 lacs strokes
Tool Blanking Code-07 (Spring Bush change) dated 11.5.21, Bending Tool Code 08 dated 12.5.21,
Punching Tool Code -09 dated 19.5.21
Part: Restrictor AFL-03-S01
Trimming tool Code -04 dated 5.4.21, Slot Cutting Code -06 dated 27.4.21, Life monitoring 2.5 lacs
strokes
Part: Bracket Rear Seat Side AFL-3-SO-3
Blanking & Punching, Code -10, dated 16.6.21, Bending Tool Code 11 dated 14.6.2021, Life
monitoring 2.5 lacs strokes
History card maintained as per AFL/FM/TR/01 no major breakdown evident, samples verified:
Store details are maintained in Google sheet, good and exhaustive planning is done, samples
verified:
Bolt Silencer M5x15: AFL-4-042, FG stock: 150000 Nos. June 2021, Raw material C/1010
HB/4.08-4.10, RM required 6431 kg., RM issued: 2042 kg.
7/16 -20 UNF-2B T Weld Nut: AFL-4-105, Raw material C/1010 HHB 14.60-14.62, RM Reqd: 1080
kg., RM issued 1468 kg.
M10x1.25x88 Boss-2: AFL-4-622, Rm B Black 1018/22, Closing stock1810 Kg.
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 14/24
Audit report
Process HR
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 15/24
Audit report
Process Maintainance
Process data
Is it an on site process? No
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 16/24
Audit report
Division
State Haryana
City Rohtak
Street 2
Country India
Did you accept the audit performed by the other certification body of Not applicable
the remote support location?
Activities
Marketing Marketing
Purchase Purchasing
Maintainance Maintenance
Quality Calibration
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 17/24
Audit report
1 7.5.1 Top Management Excellent use of technology to monitor raw material stocks and process wise inventory.
2 8.5.1.6 Tooling & Store Control of tooling and its monitoring through excel sheet is quite good, zero issues since
last 6 months.
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 18/24
Audit report
Manufacturing processes
Manufacturing processes and shifts
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 19/24
Audit report
Legend X 0 MA mi OFI PA NA _
compliant not audited Major minor Opportunity for Positive aspect not applicable Missing required
nonconformance nonconformance improvement
Organization name : ADINATH FORGING PRIVATE LIMITED CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
Audit date: 26.Jun.2021-27.Jun.2021 20/24
Audit report
Customer information
All automotive customer(s)
Name of CSR document Date of CSR Supplier code(s) IATF OEM New Stage 2 / Transfer 1. Surv audit 2. Surv audit
document customer
since last
audit?
Organization name : ADINATH FORGING PRIVATE LIMITED CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
Audit date: 26.Jun.2021-27.Jun.2021 21/24
Audit report
Audit conclusion
Projects
Comments Manufacturing process sampled for Stamping: 27.5.21, Welding: 27.5.2021 and Machining:
21.4.2021, process audit undertaken as per plan covering all processes, action taken is effective.
Comments Risk Assessment AFL/MR/32 related to current COVID-19 Pandemic situation found determined
and incorporated in process Quality, Too room & Store, action taken is effective
Comments No process/ part change since last audit. Hence, no sample available. However, Process validation
and 4M change record verified and well implemented.
Comments Control Plan of Part: Restrictor: AFL/01/CP/S01 process parameters stroke height related to
blanking & draw operation & for Control Plan of Part: NUT LOWER ARM M10x1.25: AFL/01CP/025
related to Drill operation collet size, machine feed etc. found included in control plan., action taken
is effective
Comments
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 22/24
Audit report
Results
Audit team conclusion
Comments Follow up off site audit for verification of minor non conformities
Total number Due date max. 20 days Due date max. 60 days
Major nonconformities 0
Positive aspects 2
Audit summary
Audited company has implemented and maintains a management system in accordance with the applied standard. Detailed audit results were
presented, explained and, as necessary, discussed with the organization's management during the closing meeting. All audit findings are based
on a sampling process, targeted towards reliable evidence for effective implementation and compliance of the management system
Recommendation for continuation to IATF, subject to closure of minor non conformities raised. Overall quality management system
demonstrates the effectiveness, except the minor non conformities.
3 minor non conformities were raised. This has been verified and closed with an offsite follow up audit dated 6th Sept 2021. Recommended for
continuation of certification to IATF.
Others:
3 minor non conformities were raised. This has been verified and closed with an offsite follow up audit dated 6th Sept 2021. Recommended for
continuation of certification to IATF.
By entering my name, I attest that a copy of the draft or final audit report and the NC management report was left with the organization at the
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 23/24
Audit report
closing meeting.
By entering my name, I attest that a copy of the final audit report and the NC management report was sent to the organization within a
maximum 15 calendar days from the closing meeting.
Additionally to this report a digital NC management report file will be provided by the auditor which has to be completed in IATF NC CARA at
https://nc-cara.iatfglobaloversight.org. All information about the software and use is provided in the documentation accessible at the provided
link.
DQS maintains ownership of this report. The content of this report and all information received in relation to the audit and certification of the
audited organization will be treated confidential and not disclosed to third parties. For exceptions e.g. disclosure to accreditation body refer to
DQS Certification and Assessment Regulations.
This report is considered as final by the audit team, if you do not get any adverse information from DQS within 14 days after the last audit day.
The recommendation of the audit team is subject to review and approval by DQS technical certification experts, who take binding certification
decision. An appeal process is defined in DQS Certification and Assessment Regulations. Should DQS obtain any information indicating
nonconformity of the certified management system, DQS will notify the certified organization timely and initiate investigation and evaluation of
such information.
Organization name : ADINATH FORGING PRIVATE CB certificate no.: 50253631 IATF16 Cara Version 1.2.2
LIMITED 24/24