Specification:: Details Plumbing Drawing
Specification:: Details Plumbing Drawing
0.40m
UNIFORM SLOPE OF NOT LESS THAN 1/4 CM PER METER OR 2%
WATER CLOSET
TOWARDS THE POINT OF DISPOSAL.
EACH HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH CLEAN OUT
floor line AT ITS UPPER TERMINAL.
VENT PIPE FOR OUTDOOR INSTALLATION SHALL EXTEND 3 METERS ABOVE
THE SORROUNDING GROUND AND SHALL BE SECURELY SUPPORTED.
NO SEPTIC TANK SHALL BE INSTALLED WITH IN OR UNDER THE BUILDING.
IMBEDED TO BOTH COMPARTMENT ARE PROVIDED WITH MANHOLES, AND TIGHT COVERS FOR
FLOORING CLEANING AND NECESSARY REPAIR, NOT LESS THAN 0.20m OF AIR SPACE
SHOULD BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART
OF THE TANK COVER.
SANITARY WYE
CAST IRON FITTINGS AND PIPES INCLUDING THAT OF PCV MATERIAL ARE
WASTE OUTLET OF APPROVED STANDARDS.
SANITARY WYE
PLUMBING DRAWING
1 DETAILS
P4 SCALE = DNTS
CERAMIC TILES
CONCRETE SLAB
0.10
2 LOCATION PLAN
P4 SCALE = DNTS