This document provides a material requirement analysis and cost estimate for 20mm thick cement plastering over an area of 10 cubic meters. It estimates that 2.8 cubic meters of cement mortar will be required. This will require 0.7 cubic meters of cement, equivalent to 20 bags of cement, and 2.1 cubic meters of sand. A rate analysis sheet then provides the estimated costs for materials, labor, and equipment to complete the plastering work over 100 square meters. The total estimated cost is 17,260.2 rupees for 100 square meters or 172.602 rupees per square meter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views4 pages

20mm-Thick Cement Plastering in Cement Mortar

This document provides a material requirement analysis and cost estimate for 20mm thick cement plastering over an area of 10 cubic meters. It estimates that 2.8 cubic meters of cement mortar will be required. This will require 0.7 cubic meters of cement, equivalent to 20 bags of cement, and 2.1 cubic meters of sand. A rate analysis sheet then provides the estimated costs for materials, labor, and equipment to complete the plastering work over 100 square meters. The total estimated cost is 17,260.2 rupees for 100 square meters or 172.602 rupees per square meter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

20mm THICK CEMENT PLASTERING C

MATERIAL REQUIREMENT ANALYSIS FOR 10M3 VOLUME


12mm thick plaster (1:3)= 100 m2
Thickness 0.020 m
Qty of mortar required= 2.000 m3
After adding additional mortar for, joints, uneven surface

Qty of mortar required= 2.800 m3

>Cement
Quantity of Cement = 0.70 m3
Nos of Cement Bag= 20 bag

>Sand
Quantity of sand = 2.10 m3

RATE ANAL
ITEM NAME : 12mm THICK CEMENT PLASTERING IN C
(B) Material Cost Analysis
SR.NO MATERIAL QUANTITY

1 SAND 2.10 m3
2 CEMENT 20.00 bag
3 SUNDRIES -
4
5
6
7
8
9

(A) Labour Cost Analysis


SR.NO LABOUR NUMBERS

1 MISTRI 0.25
2 MASON 10
3 MALE COOLIE 10.00
4 FEMALE COOLIE 10
5 BHISTI 2
6 SUNDRIES -
(B) Equipment Cost Analysis
SR.NO Equipment Name

1
2 -
3 -
TOTAL COST

NOTES
- Material, Labour,and Equipment price is change as per location and time
- Material and equiment requirement is as per your uses.
- This is most common Rate Analysis Sheet which is majorly used
construction.
EMENT PLASTERING COST ANALYSIS

UME

ortar for, joints, uneven surface, dry wet conversion. etc

0.70 m3

RATE ANALYSIS SHEET


HICK CEMENT PLASTERING IN CEMENT MORTAR (1;3), QUANTITY (100 SQURE METER)

RATE PER AMOUNT


RS/- RS/-
800 CUBIC METER 1680
320 bag 6400
- - 50

TOTAL COST RS/- 8130

RATE PER AMOUNT


RS/- RS/-
400 day 100
300 day 3000
200 day 2000
180 day 1800
200 day 400
- - 50
Total Cost 7350

(A) MATERIAL COST 8130


HIRE CHARGES (B) LABOUR COST 7350
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 15480
TOTAL COST 0 2 1.5% WATER CHARGE 232.2
3 10% CONTRACTOR'S PROFIT 1548
TOTAL COST RS/- 17260.2
s per location and time FOR 100 SQUARE METER RS/- 17260.2
r uses. FOR 1 SQUARE METER RS/- 172.602