The General Managers (Engg.)- CR, ER, ECR, ECoR, NR, NCR, NER, NFR, NWR, SR,
SCR, SER, SECR, SWR, WR, WCR and Metro Railway/Kolkata.
The General Manager (Const.), N.F. Railway, Guwahati.
The General Manager/CORE/Allahabad.
Sub: Correction Slip No. 7 to the Indian Railways Permanent Way Manual 2020.
*****
Ministry of Railways (Railway Board) has decided that correction/addition as indicated
in the enclosed Correction Slip No. 7 dated 03.04.2022, to relevant para of the IRPWM-2020
be made.
Receipt of this letter may please be acknowledged.
Copy to:-
Sr. PPS/PS to CRB & CEO, MF, MI, M(T&RS), M(O&BD), Secretary.
AM(CE), AM(Works), AM(Budget), AM(Traction), AM(Fin.), AM(Sig.), AM(Plg.),
AM(Staff), AM(Mech.Engg.), AM(PU), AM(Tele.), AM(TT), PED(Bridge), PED(Vigilance),
PED(Safety), AM(M&BD), AM(T&C), AM(Comml.).
1202 Works Requiring the Sanction of Commissioner of Railway Safety and Notice
thereof –
(1) Requirement of sanction of Commissioner of Railway Safety (CRS) for works is covered
under Section 23 of The Railways Act, 1989 (24 of 1989) and Chapter VII of the “The
Railways (Opening for Public Carriage of Passengers) Rules, 2000”. Sanction of CRS
will however not be required for execution of works affecting running of trains carrying
passengers and for temporary arrangements necessary for carrying it out, in case of
emergency.
(2) The sanction of Commissioner of Railway Safety shall be obtained for the opening of the
following works if they form part of, or are directly connected with, a railway used for
the public carriage of passengers and have been constructed subsequent to the giving of
a report by the Commissioner, namely –
Note: (I) Above list is not exhaustive. Decision whether a component of work is
materially affecting the structural character or not, will be taken by Chief
Engineer/Construction for construction works and by Chief Track
Engineer/Chief Bridge Engineer for open line works.
(II) Further, any work which in opinion of CTE/CBE is affecting the safety of
running lines will be processed for sanction of Commissioner of Railway
Safety.
****