Municipal Committee Safidon: Tender Document FOR
Municipal Committee Safidon: Tender Document FOR
FOR
INDEX
NOTICE
8. Acceptance of offer will rest with the competent authority who does not
bind itself to accept the lowest tender and reserves to itself the authority
to reject any or all the tenders without assigning any reason.
9. Earnest money of the unsuccessful tendering firms will be released only
after the acceptance of the offer, whichever is earlier.
10. The offer of the Consulting Firm against whom there is any criminal
proceedings in any court of law, shall not be considered.
11. If any information furnished by the Consulting Firm is found incorrect at
a later date, the firm shall be liable to be debarred from tender/taking up
works in Municipal Committee SAFIDON. Municipal Committee SAFIDON
reserves the right to verify the particular furnished by the Consulting
Firm independently.
12. Penalty for wrong Estimation of quantities for items of works to be
executed will be as under:-
Variation in total Estimation of quantifies
i) Within 5% : Nil.
DESCRIPTION OF PROJECT
The project involve the Consultancy work for preparing DPRs and Designing
work as given below:-
Sr. Name of work Tentative
No. Estimated Amount
(in Lacs)
1 Const. of MC Complex and Swimming Pool 150.00
etc.
2 Const. of community center on 03 canal land 150.00
belonging to Municipal Committee Safidon
Note:- Tentative Estimated Amount may increase or decrease as per actual
estimation.
INTENT:
SCOPE OF WORK
The Consulting Firm shall be responsible for the following scope of work.
Obtain approval of all local and other authorities at all stages of work till
completion of project as per requirement and also prepare completion
drawings for the same.
(3) above in CD
QUALIFYING REQUIREMENTS
Names & Title of Directors and Officers to be concerned with the work, with
designation of individuals authorized to act for the organization.
Information on any litigation in which the applicant was involved during the last
five years, including any current litigation.
PRICE
S.No. Stage of payment as per scope of work. Breakup Stage as per scope
of fee.
On finalization of preliminary drawings, Preliminary stage
approval from the Engineer-in-charge and drawings
preliminary cost estimate on the basis of
which scheme will be floated and in case
required response is received, the matter
1. will be processed and in case required 25%
response is not received payment of this
stage will only be made and the project will
be prepared fresh at the same cost after
making suitable changes in case the Board
decided so.
On approval/finalization of detailed Drawings for
drawings of all disciplines including estimates
2. 25%
structural drawings required for preparing
detailed estimate at Directorate Level.
Supplying all the drawings for Working drawing
3. architectural, structural, civil landscaping, 10% stage
water supply, drainage etc.
On supply of detailed estimates of all the Detailed estimate
works including services along with tender and tendering stage
4. 20%
documents(DNIT) in respect of all services
as per/ scope of work .
5. On completion of 100 % consultancy work. 10%
On starting of structure work/ External Construction stage
6. 5%
Development work
5% + Construction stage
earnest
7.
After completion of work and submission money/s
of all completion drawings. ecurity
FORM “A”
FORM-B
1 2016-17
2 2015-16
3 2014-15
Key Dates
Name of The Work:- EXPRESSION OF INTEREST FOR CONSULTANCY WORK
FOR PREPARING DPRs DETAILED DESIGNING i.e. STRUCTURE DESIGN,
ARCHITECTURAL DESIGN/DRAWING WORK FOR CONSTRUCTION OF
COMMUNITY CENTRE AND CONSTRUCTION OF SWIMMING POOL COMPLEX.
DETAIL OF FEES
EXPRESSION OF INTEREST
FOR CONSULTANCY WORK
FOR PREPARING DPRs
DETAILED DESIGNING i.e.
STRUCTURE DESIGN,
ARCHITECTURAL
DESIGN/DRAWING WORK FOR
CONSTRUCTION OF
COMMUNITY CENTRE AND
CONSTRUCTION OF SWIMMING
POOL COMPLEX.
PRESS NOTICE
EXPRESSION OF INTEREST
MUNICIPAL COMMITTEE SAFIDON (KARNAL)