West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.
DOC NO. SECL Job no.
Activity / Basic Job steps Hazards Mitigation /control measures
Inspect issue and control use of PPE
Hold daily Tool Box meeting Lake of P.P.E Explain daily work activity
When lifting/carrying scaffolding materials only carry recommended amounts. Tie materials
Lifting/carrying scaffolding Strains, pulled muscles, skeletal correctly when using a gin wheel and rope, if passing hand to hand, ensure receiver has the
materials, injuries and rope burns material in his/her grasp before releasing.
Raising/lowering scaffold materials Wear correct type of gloves.
Use correct manual handling techniques.
Undertake manual handling training.
Check gin wheel and rope in good order, exclusion zone in place
Operators must be trained, authorized and hold the relevant qualifications.
Being struck by vehicle or loads Outriggers must be fully extended.
Mechanical handling of materials. being moved to and from goods Any slinging of materials must be undertaken by trained persons or under the direct
Lorry mounted loader/crane. vehicle. supervision of a trained person.
Those at risk: Scaffold operatives, Inspect equipment before use.
other site workers, driver and the All equipment must be regularly maintained, tested and examined as statutory requirements.
Public. Trained banks men to be used with all cranes and hiab lorries.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.
DOC NO. SECL Job no.
Activity / Job step Hazards Mitigation /control measures
Installation of ties, ring bolts, Stability of scaffold. Eye and hearing protection to be worn during drilling operations.
anchors etc. Noise induced hearing loss. Ties/anchors & physical to be fixed/removed with the progress of the works.
Eye injuries.
Proper Use of Approved full body harness.
Safe system of work in place and briefing given to operatives.
Working at height When erecting/dismantling.
erecting/dismantling either tube and Falls of men and materials Install exclusion zone below the work area.
fitting or system scaffolding, Those at risk: scaffold operatives, Progressively position and fix ladders.
including staircases and Hake others below work area. Erect ties as work proceeds.
temporary roof systems. Cease work if adverse weather prevails.
Install span set running lines.
Incomplete platforms Fall of men and materials Installation of hard barriers and relevant warning signage clearly displayed, to prevent access.
Rescue of someone who has had a Suspension trauma. Fall prevention must be considered in the first instance, install span-set running lines, inertia
fall when harness is attached to Injury to those carrying out the blocks and protection decks.
anchor point rescue. It is important that a rescue plan is in place and understood by the scaffold operatives before
. work commences.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.
DOC NO. SECL Job no.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.
DOC NO. SECL Job no.
.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.
DOC NO. SECL Job no.
.
.