0% found this document useful (0 votes)
65 views6 pages

Diagrama Bha Cyclone Bailer - Petrocedeno 2011

Uploaded by

Jesus Bolivar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views6 pages

Diagrama Bha Cyclone Bailer - Petrocedeno 2011

Uploaded by

Jesus Bolivar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

FISHING /RE - ENTRY

Date: 1 de abril de 2012 Well: WB-15 CT. Ing.:

Client: PETROCEDEÑO Field: San Diego de Cabrutica


CT. Oprt.:
Company Ing. Rep.: JESUS GARCIA Rig: TM- 117 CT. Unit.:
Asist Company Rep.: BHA Nº: WTTA-003 Weatherford Repr.: JUAN CALDERA
Type of Operation: PESCA DE TUBERIA 3-1/2 CON CUELLO 4-1/2 + OVERSHOT 5-3/4

Item BHA Draving Tool Description Tool O.D. Tool I.D. Length Fish Neck Connection - Treads Part. Nr:

X- OVER 4"-3/4 OD 4" 3/4 2.000 0.700 3-1/2 IF. PIN X 3-1/2 EUE BOX 44830

ACELERADOR HIDRAULICO 4" 3/4 2.000 12.15 4" 3/4 3-1/2" IF PIN X 3-1/2" IF PIN 510517

JAR 4" 3/4 OD HIDRAULICO 4" 3/4 2" 29.80 4" 3/4 3-1/2" IF PIN X 3-1/2" IF PIN 758055

x -over 3 1/2 if box /3 1/2eue pin 4.813 1.500 2"


510573

Total Length of B.H.A. : (Meters) 45,85FT B.H.A. Prepared by / TT - Operator


B.H.A.
Please note that all O/D's and I/D's are approximate, and are given as a guideline only # 01 - Run # 01 JUAN CALDERA
Date: 15 de mayo de 2009 Well: CT. Ing.:
Client: PETROBRAS Field: CT. Oprt.:
Company Rep.: ILARIO DOMINGUEZ Rig: CT. Unit.:
Asist Company Rep.: BHA Nº: Weatherford Repr.: ALFREDO J. MALDONADO
Type of Operation: Realizar Limpieza de Arena de Formacion en el Casing de 7" - 27#/ft
Item BHA Draving Tool Description Tool O.D. Tool I.D. Length Fish Neck Connection - Treads Part. Nr:

17 DrillPipe

16 Dailey - Hypulse Jar Slinger


Accelerator

15 Drill Collar or HWDP

14 Dailey - Hydraulic Fishing Jar

13 Circulating Sub

12 Dailey - Lubricated Bumper Sub

11 Stabilizer

10 Debris Junk Basket

9 Crossover Sub

8 Stabilizer

7 Crossover Sub

Venturi Reverse Circulating Junk


6 Cyclone Bailer® System

5 Hanging Sub for Screen


with O -ring seal profile

4 Acme threaded sub


with flapper valve installed

Additional Washpipe Sections


3 or Drill Pipe with internal screen
Dura grip or Free flow 10ft long
sections c/w bullnose

2 Acme threaded sub


with flapper valve installed

1 Rotary Shoe c/w baffle plate


to stop large debris

Sand fill

Total Length of B.H.A. : 0.00 (Meters) 0.00 (Feet) B.H.A. Prepared by/TT - Operator

Please note that all O/D's and I/D's are approximate, and are given as a guideline only B.H.A. # 01 - Run # 01 Alfredo J. Maldonado
Date: 5/4/12 Well: IC-09 CT. Ing.:
Client: PETROCEDEÑO Field: San Diego de Cabrutica CT. Oprt.:
Company Ing. Rep.: J.SANCHES Rig: Evertson - 3 Workover Unit. CT. Unit.:
Asist Company Rep.: BHA Nº: WTTA-02 Weatherford Repr.: Erick Barrios/ C. RODRIGUEZ
Type of Operation: Realizar Limpieza de Arena de Formacion en el Casing de 7" - 27#/ft
Item BHA Draving Tool Description Tool O.D. Tool I.D. Length Fish Neck Connection - Treads Part. Nr:

5 SUB - CROSS OVER, 3-1/16'' 2-1/4" 2.00 2-3/8" EUE PIN X 3-1/2" EUE BOX 613113

4 SUB - CROSS OVER, 3-1/16'' 2-1/4" 2.00 3.063 2-3/8" EUE BOX X 2-3/8" PAC PIN 54655

3 SUB - DUAL CIRCULATING 3-1/16" 1-1/2" 1.30 3-1/2" 2-3/8"PAC BOX X 2-3/8"REG PIN 510480

2 MOTOR - 3 1/2 "CTD®" 3-1/2" 2-1/8" 13.00 3-1/2" 2-3/8"REG BOX X 2-3/8"REG BOX 507951

1 JET NOZZLES - DUAL CIRCULATION 3.750 0.21 1.00 3-1/2" 2-3/8"REG PIN 500433

Total Length of B.H.A. : 0.00 (Meters) 19.30 (Feet) B.H.A. Prepared by / TT - Operator
Please note that all O/D's and I/D's are approximate, and are given as a guideline only B.H.A. # 01 - Run # 02 E. BARRIOS/ A. ESPINOZA
FISHING /RE - ENTRY
Date: 3 de mayo de 2012 Well: WB-15 CT. Ing.:

Client: PETROCEDEÑO Field: San Diego de Cabrutica


CT. Oprt.:
Company Ing. Rep.: JESUS GARCIA Rig: TM- 117 CT. Unit.:
Asist Company Rep.: BHA Nº: WTTA-003 Weatherford Repr.: JUAN CALDERA
Type of Operation: PESCA DE TUBERIA 3-1/2 CON CUELLO 4-1/2 + OVERSHOT 5-3/4

Item BHA Draving Tool Description Tool O.D. Tool I.D. Length Fish Neck Connection - Treads Part. Nr:

X- OVER 4"-3/4 OD 4" 3/4 2.000 0.700 3-1/2 IF. PIN X 3-1/2 EUE BOX 44830

ACELERADOR HIDRAULICO 4" 3/4 2.000 12.15 4" 3/4 3-1/2" IF PIN X 3-1/2" IF PIN 510517

JAR 4" 3/4 OD HIDRAULICO 4" 3/4 2" 29.80 4" 3/4 3-1/2" IF PIN X 3-1/2" IF PIN 758055

x -over 3 1/2 if box /3 1/2eue pin 4.813 1.500 2"


510573

Total Length of B.H.A. : (Meters) 45,85FT B.H.A. Prepared by / TT - Operator


B.H.A.
Please note that all O/D's and I/D's are approximate, and are given as a guideline only # 05 - Run # 05 JUAN CALDERA

You might also like