0% found this document useful (0 votes)
22 views1 page

RFI 14 September 2021

The document outlines the inspection and test schedule for the RDMP Refinery Unit-V Balikpapan Project, detailing specific dates, times, locations, and inspection items. It includes information on the responsible personnel from PP Urban and notes regarding access and release conditions for inspections. The schedule emphasizes the requirement to submit Requests for Information (RFI) at least one day prior to the inspections.

Uploaded by

Aria Zulham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

RFI 14 September 2021

The document outlines the inspection and test schedule for the RDMP Refinery Unit-V Balikpapan Project, detailing specific dates, times, locations, and inspection items. It includes information on the responsible personnel from PP Urban and notes regarding access and release conditions for inspections. The schedule emphasizes the requirement to submit Requests for Information (RFI) at least one day prior to the inspections.

Uploaded by

Aria Zulham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION AND TEST SCHEDULE KILANG PERTAMINA

BALIKPAPAN

Project : [IKAN] RDMP- Refinery Unit-V Balikpapan Project


Owners : Pertamina RU-V Balikpapan
Contractors : RDMP JO Balikpapan
Sub-Contractors : PT. PP URBAN (BD003)

NO. DATE TIME LOCATION RFI NUMBER INSPECTION AND TEST ITEM PP Urban's PIC REMARKS

Acces for inspection and


1 Tuesday, September 14th 2021 13.00 A-331-03B RFI-P-PU2-AR-02028 Inspection Before Pouring Concrete PD1 Aria Zulham pouring concrete should
installed

Release if inspection was


2 Tuesday, September 14th 2021 14.00 A-331-03B RFI-P-PU2-AR-02035 Inspection During Pouring Concrete PD1 Aria Zulham
accepted by IPMT

3 Tuesday, September 14th 2021 14.00 341/UCR-001 RFI-P-PU2-AR-02036 Inspection Before Pouring Concrete Slab 1st Floor (T.O.C +102.800) Aria Zulham Closing Comments

4 Tuesday, September 14th 2021 14.30 341/UCR-001 RFI-P-PU2-AR-02037 Inspection Before Pouring Concrete Girder 1st Floor (T.O.C +102.800) Aria Zulham Closing Comments

Release if any comments was


5 Tuesday, September 14th 2021 15.00 341/UCR-001 RFI-P-PU2-AR-02038 Inspection During Pouring Concrete Slab 1st Floor (T.O.C +102.800) Aria Zulham
accepted by IPMT

Release if any comments was


6 Tuesday, September 14th 2021 15.30 341/UCR-001 RFI-P-PU2-AR-02039 Inspection During Pouring Concrete Girder 1st Floor (T.O.C +102.800) Aria Zulham
accepted by IPMT

Note: Please submit RFI max 1 day before inspection and test agenda