V.T. Lao Construction / PT Wijaya Karya (Persero) TBK. (JV) : Manpower Utilization Report January 25, 2022

The document reports on the manpower utilization for the reconstruction of Clarin Bridge in Bohol Province, Philippines for January and February 2022. It shows that in January, 36 personnel positions were mobilized and 78 personnel were utilized, leaving a balance of 42 additional personnel utilized. In February, 94 total personnel positions were mobilized and 104 were utilized, leaving a balance of 10 additional personnel utilized for the month. The report was submitted by the project manager and noted by the resident engineer and project engineer.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

V.T. Lao Construction / PT Wijaya Karya (Persero) TBK. (JV) : Manpower Utilization Report January 25, 2022

The document reports on the manpower utilization for the reconstruction of Clarin Bridge in Bohol Province, Philippines for January and February 2022. It shows that in January, 36 personnel positions were mobilized and 78 personnel were utilized, leaving a balance of 42 additional personnel utilized. In February, 94 total personnel positions were mobilized and 104 were utilized, leaving a balance of 10 additional personnel utilized for the month. The report was submitted by the project manager and noted by the resident engineer and project engineer.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

V.T.

LAO CONSTRUCTION / PT WIJAYA KARYA (PERSERO)


TBK. (JV)
,Brgy. Sagnap, Loay
Bohol Province

Reconstruction/Repair of Bridges Damaged by the 2013 Earthquake, Bohol Province


CP III: Reconstruction of Clarin Bridge

MANPOWER UTILIZATION REPORT

January 25, 2022


Month
Category BALANCE REMARKS
January 2022 MOBILIZED

PROJECT MANAGER 1 1 0

DEPUTY PROJECT MANAGER 1 1 0

PROJECT ENGINEER 1 1 0

BRIDGE ENGINEER/FIELD ENGINEER 1 2 1

MATERIAL & QUALITY CONTROL ENGR. 1 1 0

CONSTRUCTION FOREMAN 1 2 1

SAFETY PRACTITIONER 1 0 -1

SURVEYOR 1 1 0

SURVEY AIDES 0 3 3

HEAVY EQUIPMENT OPERATORS 2 5 3

LIGHT EQUIPMENT OPERATORS/DRIVERS 2 5 3

WELDER 2 8 6

FIRST AIDE 0 1 1

TRAFFIC AIDE 2 0 -2

LABORATORY AIDE 0 0 0

SKILLED LABORERS 5 31 26

UNSKILLED LABORERS 12 15 3

UTILITY PERSONNEL 1 1 0

FLAGMAN 2 0 -2

TOTAL 36 78 42

Submitted by: Checked by: Noted by:

BONIFACIO R. POTOY, Jr. SAMUEL B. TAGAAN BERNARDO A. AUSTRIA


Project Manager Resident Engineer Project Engineer
CONTRACTOR CONSULTANT Engineer IV/ PE III (Accred.No.4235)
RMC1-(B) UPMO-DPWH
V.T. LAO CONSTRUCTION / PT WIJAYA KARYA (PERSERO)
TBK. (JV)
,Brgy. Sagnap, Loay
Bohol Province

Reconstruction/Repair of Bridges Damaged by the 2013 Earthquake, Bohol Province


CP III: Reconstruction of Clarin Bridge

MANPOWER UTILIZATION REPORT

February 25, 2022


Month
Category BALANCE REMARKS
February 2022 MOBILIZED

PROJECT MANAGER 1 1 0

DEPUTY PROJECT MANAGER 1 1 0

PROJECT ENGINEER 1 2 1

BRIDGE ENGINEER/FIELD ENGINEER 2 1 -1

MATERIAL & QUALITY CONTROL ENGR. 1 1 0

CONSTRUCTION FOREMAN 2 2 0

SAFETY PRACTITIONER 0 0 0

SURVEYOR 1 1 0

SURVEY AIDES 3 2 -1

HEAVY EQUIPMENT OPERATORS 5 5 0

LIGHT EQUIPMENT OPERATORS/DRIVERS 6 3 -3

WELDER 5 10 5

FIRST AIDE 0 1 1

TRAFFIC AIDE 2 2 0

LABORATORY AIDE 0 0 0

SKILLED LABORERS 34 10 -24

UNSKILLED LABORERS 27 59 32

UTILITY PERSONNEL 1 1 0

FLAGMAN 2 2 0

TOTAL 94 104 10

Submitted by: Checked by: Noted by:

BONIFACIO R. POTOY, Jr. SAMUEL B. TAGAAN BERNARDO A. AUSTRIA


Project Manager Resident Engineer Project Engineer
CONTRACTOR CONSULTANT Engineer IV/ PE III (Accred.No.4235)
RMC1-(B) UPMO-DPWH