SIEMENS PROCESS SET-UP SHEET JOB: Tool Base: Press Size: Cavities: Date:
W-2557
w-2557
64
MATERIAL: 95% Fill Cavity Weight:
Total Cavity Weight: Runner Weight: Individual Part Weight:
CHEMLON 104H
Max Regrind: Runner:
26/03/2011
50.12 g 52.60 g 21.90 g 00.82 g
Max Regrind @ wall: Barrel - per Shot:
50% 29% 21% 9%
MACHINE SET POINTS:
MACHINE OVERVIEW Cycle Time 23.30 Overall Cycle Timer 26.30 Fill Time 0.77 Recovery Time 2.70 Cure Time 12.00 Cushion 0.21 Cut-off Timer 1.07 HOLD PRESSURE
psi % Time
RECOVERY
% S. S. Pack Hold psi %
25% 25% 20% 20% Total Hold Time If Applicable:
0.20 0.25 0.20 1.85 2.50
1 99
75 75
BARREL Temperatures Nozzle 520 Z-3 520 Z-2 525 Z-1 530 Feed 150 MOLD Temperatures Cover 185 TCU Ejector 100 TCU
Value Gate Fill Timer
On Off On Off
Gate 1 Gate 2 Gate 3 Gate 4
Gate 5 Gate 6 Gate 7 Gate 8
Hot Runner Temps Zone 1 510 Zone 7 Zone 2 510 Zone 8 Zone 3 510 Zone 9 Zone 4 510 Zone 10 Zone 5 510 Zone 11 Zone 6 510 Zone 12
510 510 566 566 550
Mold Vac Blow Back 1st Stage Injection Time Mold Closed Time
REFERENCE PARAMETERS:
MACHINE OVERVIEW Mold Open Time 2.20 Shot Size 1.16 Cut-off Position 0.50 Pressure at Cut-off 821 Melt Temperature Nozzel Size Clamp & Ejector Full Open Close Fast Low Press Close Mold Safe Open Break Open Fast Open Slow Eject Start Eject Forward Eject Retract Eject Counts Tip Stroke (on/off) Pack & Hold
Vol Time
Recovery
Pos Decompress Screw Rotate Speed Screw Rotate Delay (sec) Prs Speed
Pack Hold
30 20
0.55
0.35
50
20% 45% 0.20
Position Pressure
Speed
Velocity Profile
Position in/sec
13.00 7.00 1.05 0.40 10.00 12.90 1.00 0.25 3 OFF 1 75 70 55 5 40 25 20 20 30 30
Notes: Se bloquearon cavidades 18 y 47 por problemas de piezas incompletas en zona de espigas debido a enplasticamiento de molde. Se colocan 2 TCU para separar circuitos de enfriamiento en molde lado cover.
87 74 61 48 35 22
1.00 1.00 1.00 1.00 1.00 1.00
Machine Max Press. 50%
MPJI-07-0043F4-SIEM
Printed On: 06/13/2011
REV. 02/13/09
SIEMENS PROCESS SET-UP SHEET
APPROVAL:
(Process Eng. Supervisor's signature is required) date
MPJI-07-0043F4-SIEM
Printed On: 06/13/2011
REV. 02/13/09
PATHFINDER PROCESS SET-UP SHEET JOB: Tool Base: Press Size: Cavities: Date:
W-2213
2213 300T 25.4 oz
4
MATERIAL: 95% Fill Cavity Weight:
Total Cavity Weight: Runner Weight: Individual Part Weight:
Polypro 7523
Max Regrind: Runner:
25/03/2011
63.68 g 66.94 g 17.55 g 16.00 g ###
Max Regrind @ wall: Barrel - per Shot:
50% 21% 29% 21%
MACHINE SET POINTS:
MACHINE OVERVIEW Cycle Time 27.60 Overall Cycle Timer 30.60 Fill Time 1.70 15.00 (recovery) Rotate Time Cure Time 0.25 Cushion 2.00 Cut-off Timer 2.00 PACK & HOLD PROFILE
Cushion Cut-off
3.50 300
1.50 300
1.50 350
0.20 350
sec psi
BARREL Temperatures Feed 450 Rear 430 Center 430 Front 430 Nozzle 430 MOLD Temperatures TCU Cover 140 TCU Ejector 140
If Applicable: Value Gate Fill Timer
On Off On Off
Gate 1 Gate 2 Gate 3 Gate 4
Gate 5 Gate 6 Gate 7 Gate 8
Hot Runner Temps Zone 1 Zone 7 Zone 2 Zone 8 Zone 3 Zone 9 Zone 4 Zone 10 Zone 5 Zone 11 Zone 6 Zone 12
Mold Vac Blow Back 1st Stage Injection Time Mold Closed Time
REFERENCE PARAMETERS:
MACHINE OVERVIEW Mold Open Time 2.00 Shot Size 1.80 Cut-off Position 0.15 1443 Pressure at Cut-off Melt Temperature Nozzel Size Clamp & Ejector Mold Open Close Fast Close Slow Clamp Lockup Clamp Closed (cure) Open Break Open Fast Open Slow Counts Eject Forward Eject Retract Tip Stroke (on/off) Partially Retracted Eject Start
Position
Injection Hold Press Pack Vol 30% spd 0.69 sec 10.00 in/sec 2150 Peak Boost (psi)
Recovery
psi speed in
Back Pressure Decompress After Screw Rotate (rpm) Rotate Delay (sec)
Boost Profile
60 0.25 135 0.25
in / sec
psi Cutoff
12.00 6.00 0.94 15.00 5.00 11.00 1.00 on 1.00 13.55
2.00 14.00 8.00
Shot Size in in/s
800 300 1480 500 800
0.15 0.15 0.17 0.19 0.21 0.31 0.41 0.71 1.01 1.31 1.80 0.40 0.82 0.80 1.20 1.20 1.20 1.20 1.20 1.20 1.20
Notes:
8.00 16.00 18.00 1.00 3.00
400 200
MPJI-07-0043F4-PATH
Printed On: 06/13/2011
REV. 02/13/09
PATHFINDER PROCESS SET-UP SHEET
APPROVAL:
(Process Eng. Supervisor's signature is required) date
MPJI-07-0043F4-PATH
Printed On: 06/13/2011
REV. 02/13/09
CRT PROCESS SET-UP SHEET JOB: Tool Base: Press Size: Cavities: Date:
W95% Fill Cavity Weight:
Total Cavity Weight: Runner Weight: Individual Part Weight:
MATERIAL:
Max Regrind: Runner: Max Regrind @ wall: Barrel - per Shot:
MACHINE SET POINTS:
MACHINE OVERVIEW Cycle Time Overall Cycle Timer (Fill) Inject Forward (Recovery) Screw Rotate Cure Time Cushion Cut-off Timer PACK & HOLD PRESSURE
(under Speed/Pressure & Timers Vol Pres Time
Inject Boost Inject Pack Inject Hold If Applicable: Value Gate Fill Timer
On Off On Off
BARREL Temperatures Nozzle Z-3 Z-2 Z-1 MOLD Temperatures Cover Ejector
Gate 1 Gate 2 Gate 3 Gate 4
Gate 5 Gate 6 Gate 7 Gate 8
Hot Runner Temps Zone 1 Zone 7 Zone 2 Zone 8 Zone 3 Zone 9 Zone 4 Zone 10 Zone 5 Zone 11 Zone 6 Zone 12
Mold Vac Blow Back 1st Stage Injection Time Mold Closed Time Velocity Profile Pos Vel Pos Back Pressure Pos Psi Pos
Controlled Process Setting: Pack / Hold Pressure Profile Pack Hold Pack Time Hold Time Cure Time
Vel
Psi
Velocity Offset
0.00
REFERENCE PARAMETERS:
Clamp & Ejector Mold Open Low Press Close Mold Safe Open Fast Eject Start Open Slow Eject Retract Eject Forward Eject Counts Screw Rotate Back Pressure Decomp After Screw (rpm)
Position Vol Press
MACHINE OVERVIEW Mold Open Time Shot Size Cut-off Position
Pressure at Cut-off
Notes:
Melt Temperature Nozzel Size
MPJI-07-0043F4-CRT
Printed On: 06/13/2011
REV. 02/13/09
CRT PROCESS SET-UP SHEET
APPROVAL:
(Process Eng. Supervisor's signature is required) date
MPJI-07-0043F4-CRT
Printed On: 06/13/2011
REV. 02/13/09
JOB: Tool Base: Press Size: Cavities: Date:
W-
ENGEL PROCESS SET-UP SHEET 95% Fill Cavity Weight:
Total Cavity Weight: Runner Weight: Individual Part Weight:
MATERIAL:
Max Regrind: Runner: Max Regrind @ wall:
#DIV/0!
Barrel - per Shot:
MACHINE SET POINTS:
MACHINE OVERVIEW Cycle Time Overall Cycle Timer (Fill) Elapsed Inj Time
Screw Feed Monitor Time (Recovery Time)
INJECTION HOLD PRESSURE PROFILE (under inj hold)
Injection Hold Time BACK PRESSURE PROFILE (under screw feed)
Time Cushion Injection Boost Time
(Cut-off Timer)
(Cure) Cooling
If Applicable: Value Gate Fill Timer
On Off On Off
BARREL Temperatures Nozzle Front Middle Rear MOLD Temperatures Cover Ejector
Gate 1 Gate 2 Gate 3 Gate 4
Gate 5 Gate 6 Gate 7 Gate 8
Hot Runner Temps Zone 1 Zone 7 Zone 2 Zone 8 Zone 3 Zone 9 Zone 4 Zone 10 Zone 5 Zone 11 Zone 6 Zone 12
Mold Vac Blow Back 1st Stage Injection Time Mold Closed Time
REFERENCE PARAMETERS:
MACHINE OVERVIEW Mold Open Time
(Re-Cycle Time)
Injection Speed Profile (Inj Boost)
Shot Size
(Set Screw Feeding Stroke)
Injection Boost Pressure
Screw Feed (Recovery) Screw Feed Speed Profile Decomp. After Feed Screw Feed Delay Time Decomp. Speed
Stroke Cut-off Point
(Cut-off Position)
Hydra Press. at Cut-off
Notes:
Melt Temperature Nozzel Size Mold Open, Clamp & Ejector Mold Open Position Start Speed (1&2) Closing Speed (1&2) Closing Speed (3) Clamp Force Intermed Fwd Vel Position Intermed Forward Speed Forward Pressure Retract Speed Retract Pressure Start Mold Protection Mold Prot Press Profile Mold Prot Speed Profile Ejector Counter
MPJI-07-0043F4-ENG Printed On: 06/13/2011 REV. 02/13/09
APPROVAL:
(Process Eng. Supervisor's signature is required)
ENGEL PROCESS SET-UP SHEET
date
MPJI-07-0043F4-ENG
Printed On: 06/13/2011
REV. 02/13/09
JOB: Tool Base: Press Size: Cavities: Date:
W-
NEWBURY PROCESS SET-UP SHEET 95% Fill Cavity Weight:
Total Cavity Weight: Runner Weight: Individual Part Weight:
MATERIAL:
Max Regrind: Runner: Max Regrind @ wall: Barrel - per Shot:
MACHINE SET POINTS:
MACHINE OVERVIEW Cycle Time Overall Cycle Timer Fill Time Cushion Pressure at Cut-off BARREL Temperatures Rear Middle Front Nozzle MOLD Temperatures Cover Ejector
If Applicable: Valve Gate Fill Timer
On Off On Off
Gate 1 Gate 2 Gate 3 Gate 4
Gate 5 Gate 6 Gate 7 Gate 8
Hot Runner Temps Zone 1 Zone 7 Zone 2 Zone 8 Zone 3 Zone 9 Zone 4 Zone 10 Zone 5 Zone 11 Zone 6 Zone 12
Mold Vac Blow Back 1st Stage Injection Time Mold Closed Time Parameters for Shuttle Press Injection Setup Inject Timer Sec Inject (hold) Sec Inject (hold) Timer Cure Timer Decompression Knockout Timer Idle Protection Time (sec) Screw Speed Inject Speed Hold Pressure Back Pressure Shot Size
Parameters for Rotary Press Injection Setup Pos Speed Press Inject Delay Fill Profile 1 Profile 2 Profile 3 Profile 4 Profile 5 Transfer At Pack Hold Cure Screw Speed Back Pressure Shot Size Decompress Max Cushion Min Cushion Operator Setup Knock Out Knock Out Timer Idle Timer (min.) Clamp Setup Clamp Full Open Open Speed Open Slow Down Close Speed LPC Pressure LPC Time
Time
Pos
Spd
Notes:
APPROVAL:
(Process Eng. Supervisor's signature is required) date
MPJI-07-0043F4-NEWB
Printed On: 06/13/2011
REV. 02/13/09
JOB: Tool Base: Press Size: Cavities: Date:
W-
NC4 PROCESS SET-UP SHEET 95% Fill Cavity Weight:
Total Cavity Weight: Runner Weight: Individual Part Weight:
MATERIAL:
Max Regrind: Runner: Max Regrind @ wall: Barrel - per Shot:
MACHINE SET POINTS:
MACHINE OVERVIEW Cycle Time Overall Cycle Timer Fill Time Recovery Time Cure Time Cushion Cut-off Timer BARREL Temperatures Feed Rear Center Front Nozzle MOLD Temperatures Cover Ejector HOLD PROFILE Pressure Time Total Hold Time
psi sec
0.00
If Applicable: Hot Runner Temps Zone 1 Zone 7 Zone 2 Zone 8 Zone 3 Zone 9 Zone 4 Zone 10 Zone 5 Zone 11 Zone 6 Zone 12
REFERENCE PARAMETERS:
MACHINE OVERVIEW Mold Open Time Shot Size Cut-off Position
Pressure at Cut-off Injection Profile
Speed (in/sec) Position (in)
Injection Profile
Melt Temperature Nozzel Size Breakaway Clamp Opn Spd 1 Clamp Opn Spd 2 Clamp Clsd Spd 1 Clamp Clsd Spd 2 Clamp Clsd Spd 3 Mold Protect Lock Up Forward Pressure Forward Speed 1 Forward Speed 2 Eject Forward Hold Retract Pressure Retract Speed Tip Stroke (on/off) Counts
Back Pressure Screw Rotate Decompression Clamp & Ejector Start Spd 1 Start Spd 2 Full Open Start Spd 2 Start Spd 3 Start Start Start Spd 2 Full Fwd Notes:
Full Retract Stop
APPROVAL:
(Process Eng. Supervisor's signature is required) date
MPJI-07-0043F8-NC4
Printed On: 06/13/2011
REV. 02/13/09