M.ARCH COURSES INCLUDES-
ARCHITECTURAL CONSERVATION
HOUSING
ARCHITECTURAL DESIGN
-
M.DES COURSES INCLUDES
MASTER OF DESIGN
THE ATTEMPTS FOR CONTEMPORARY ARCHITECTURE AND ARCHITECTUREL STUDIES GO BACK ABOUT 200 YEARS DURING THE PERIOD
OF COLONIZATION IN INDIA, BRITISH STARTED BUILDING ICONIC AND SUPREME BUILDINGS IN INDIA SUCH AS COURTS, HOUSES,
PARLIAMENT HOUSES, ETC. IN LATE 19TH CENTURY PEOPLE OF INDIA TRIED TO STUDY THE FIELD OF ARCHITECTURE ALONG WITH THE
BRITISHERS, FOR WHICH THE FIRST ARCHITECTURE COLLEGE IN INDIA CALLED J.J. SCHOOL OF ARCHITECTURE WAS ESTABLISHED, IT
ALSO HAPPENS TO BE ASIA’S FIRST ARCHITECTURAL COLLEGE. IT WAS THE ONLY COLLEGE PROVIDING PROPER ARCHITECTURAL
EDUCATION FOR A TIME PRTIOD.
AS TIME PASSED , THE SCOPE OF ARCHITECTURE INCREASED WHICH LED TO THE INCREASE IN DEMAND OF ARCHITECTURAL INSTITUTE.
AFTER INDIPENDANCE THE MAJOR INSTITUTES ESTABLISHED WERE , CEPT AHMEDABAD, IIT KANPUR, SCHOOL OF PLANNING AND
ARCHITECTURE ( SPA , PROVIDED BY GOVERNMENT OF INDIA) .
ACITE NORMS
NORMS FOR INTAKE AND NO. OF COURSES PER DIVISION ( B.ARCH , M.ARCH , B. DES, M.DES)
DIPLOMA/ POST DIPLOMA LEVEL
S. NO. PROGRAMME INTAKE PER MAXIMUM NO. OF DIPLOMO/POST DIPLOMO CERTIFICATE COURSES/DIVISIONS
DIVISION ALLOWED
A ARCHITECTURE 40 2 80
B DESIGN 30 3 90
S. NO. PROGRAMME INTAKE PER MAXIMUM NO. OF UNDER GRADUATE COURSE/DIVISIONS ALLOWED
DIVISION
A ARCHITECTURE 40 4 160
B DESIGN 30 5 150
POST GRADUATE LEVEL
S. NO. PROGRAMME INTAKE PER MAXIMUM NO. OF POST GRADUATE DIVISIONS ALLOWED
DIVISION
A ARCHITECTURE AND
PLANNING
a) ARCHITECTURE 20 3 60
b) PLANNING 30 1 30
B DESIGN 15 3 45
2) RESOURCE CENTRE 1 80
7) LIBRARY 1 150
8) LANGUAGE/AUDIO VISUAL 1 66
LABORATORY
ADMINISTRATIVE AREAS
CARPET AREA IN SQ M PER ROOM NO. OF ROOMS REQUIRED TOTAL NO. OF ROOMS
1) PRINCIPAL/ DIRECTOR 30 1 1
OFFICE
2) BOARD ROOM 20 1 1
3) OFFICE 150/300 1 1
7) CENTRAL STORES 30 1 1
8) MAINTENANCE 10 1 1
9) SECURITY 10 1 1
10) HOUSEKEEPING 10 1 1
CARPET AREA IN SQ M PER CAERPET AREA IN SQ M NO. OF ROOMS TOTAL NO. OF ROOMS
ROOM ( FOR CAMPUS PER ROOM ( FOR CAMPUS
HAVING MORE THAN ONE WITH ONE PROGRAMME)
PROGRAMME)
1) TOILETS ( LADIES 350 150 ADEQUATE ADEQUATE
AND GENTS )
2) BOYS COMMON 100 75 1 1
ROOM
3) GIRLS COMMON 100 75 1 1
ROOM
4) CAFETERIA 150 150 1 1
5) STATIONERY STORE 10 10 1 1
COA NORMS
INFRASTRUCTURE REQUIREMENTS
LIBRARY REQUIREMENTS
LAND REQUIREMENT
COMPUTER CENTRE
ARCHITECTURAL STANDARDS
LECTURE HALL
DRAWING STUDIOS AND POTTERY WORKSHOP
DINING ARRANGEMENT
LIBRARY
PARKING
TOILATERIES REQUIREMENTS