Growatt HPS 30 Manual 2017-10
Growatt HPS 30 Manual 2017-10
GROWATT NEW ENERGY TECHNOLOGY Co.,LTD Hybrid energy system User Manual
No.28 Guangming Road, Shiyan, Bao’an District,
Shenzhen, P.R. China
T + 86 755 2747 1900
F + 86 755 2747 2131
E [email protected]
W www.ginverter.com
GR-UM-072-A-00
Contents
2 Safety instructions
2.1 Installation 5 Pilot operation
5.1 Relevant requirements
2.2 Operator
5.2 Inspection
2.3 Inspection and storage 5.3 Power on steps
2.4 Transportation 5.4 Pilot operation completion
2.5 Repair and maintenance 5.5 Power off steps
2.6 Inverter EMC and noise level
2.7 Important note
6 GUI instruction
6.1 LCD display screen introduction
6.2 LCD operation
6.3 LCD display information schedule
3 Product Description
This chapter describes the contents of this manual, target reader, and safety symbols, Qualification
can help users to have a better understanding of the manual. 1) Only professional electricians or professionally qualified personnel can
transport or install this product.
2)The operator should be fully familiar with the structure and working principle of
the entire Energy Storage system;
1.1. Contents
3)The operator should be fully familiar with this manual;
4)The operator should be fully familiar with the local standards of the project.
This manual applies to Growatt HPS30 hybrid energysystem, the manual contains:
Product description The contents of this manual will be periodically updated or revised if necessary.
However discrepancies cannot be excluded. Please refer to the product or download
The role inverter plays in the energy storage system and structure, principle, the latest version of this manual on www.growatt.com.
protection, operation mode, storage and package size of the Growatt HPS30.
Installation
1.4. Symbols explanation
Inverter installation conditions, tools, and the inverter mechanical and electrical In order to ensure the personal and property safety of the user during installation, or
installation, the communication connection and inspection. optimally efficient use of this product, symbols are used highlight the information.
The following symbols may be used in this manual, please read carefully, in order to
Commissioning make better use of this manual.
Daily maintenance of the inverter, the replacement of some spare parts and waste
disposal instruction.
1 2
Safety instructions 2
Caution,risk of electric shock
WARNING Inverter installation and service personnel must be trained and familiar with the
general safety requirement when working on electrical equipment. Installation and
When battery bank connecting point are exposed, there will be DC voltage in
service personnel should also be familiar with the local laws and regulations and
the equipment DC side; and when output breaker is on, there is a potential risk
safety requirements.
of electric shock.
> Read this manual carefully before operation. The equipment will not be under
warranty if failing to operate according to this manual.
> Operation on the inverter must be for qualified electrical technician only.
Caution, risk of fire hazard
WARNING Suitable for mounting on concrete or other non-combustible > When inverter operating, don’t touch any electrical parts except for the touch-
surface only. screen.
> All electrical operation must comply with local electrical operation standards.
> Warranty service for the inverter does not contain module maintenance.
Protective conductor terminal > Permission from the local utility company is required before installing the Energy
The inverter has to be firmly grounded to ensure the safety of Storage system and only professional personnel are qualified for the operation.
PE TERMINAL personnel.
2.1. Installation
Risk of electric shock, Energy storage timed discharge.
Proper installation requires following all the instructions in the user manual involving
Electrical shock danger exists in the capacitor; the cover shall be transportation, mounting, wiring and commissioning. Growatt does not cover
WARNING
moved at least 5 minutes later after all powers are disconnected. warranty for the inverter damage due to failing to use it properly.
The protection level of the inverter is IP20, which is designed for indoor installation.
Please refer to chapter 4 for installation instruction.
3 4
2.2. Operator 2.5 Repair and maintenance
Inverter installation and service personnel must be trained and familiar with the
general safety requirement when working on electrical equipment. Installation and Repair and maintenance can only be carried out after disconnecting the DC and AC
service personnel should also be familiar with the local laws and regulations and for at least 5 minutes.
safety requirements.
Only professional technical personnel are qualified for the operation.
Disconnecting switches
2.3. Inspection and storage
Disconnect DC switch and AC switch, and make sure the inverter will not be
The inverter should be carefully checked before signing the document from the connected accidentally. Ensure the inverter is totally disconnected with no voltage by
transportation company. Check the received items against delivery note, and if there testing with a multi-meter. Although the DC and AC switch has been disconnected,
is any defect or damage, immediately notify the transportation company. If there is still voltage in some components, for example capacitors. Hence, the repair
necessary, you can seek help from Growatt Customer Service department. or maintenance operation can only be proceeded at least 5 minutes after the
disconnection.
Don't change the parameters of the inverter without authorization from the local
Transportation should follow the transportation methods described in the user
utility and Growatt New Energy Co., Ltd. Otherwise, it might lead to injury or
manual. The inverter's weight and center of gravity should be taken into account
equipment damage and the warranty of the inverter will be voided.
during transportation. The center of gravity is marked on the box.
5 6
Anti-interference property from internal components.
Product description 3
Anti-interference property from outside.
3.1 Energy Storage system
Electromagnetic emission impact on the environment
Growatt HPS30 bidirectional battery inverter is designed for energy storage system,
it converts DC current generated by battery bank into AC current and feed it into the
Inverter may generate some noise and electromagnetic radiation during operation. load/grid, also it can take power from solar inverter or grid to charge battery.
According to EMC emission and noise level, inverter should be used in industrial
environments. Hence, all personnel should not stay long near the inverter.
Structure of a typical energy storage system is shown as below
Information Battery
power cable
Item 1: Static electricity can cause damage to the inverter Load CAN communication
When operating the inverter, operator must comply with anti-static protection 3.2 Circuit diagram of the inverter
norms!
Item 2: Restriction Growatt HPS30 bidirectional battery inverter converts DC current generated by
battery into AC current. Then the AC current is filtered into sine wave electricity and
The inverter cannot be directly used to connect the life support equipment fed into the grid through a isolating transformer. It can also converts grid power to
and medical equipment! DC to charge battery. The circuit diagram is as below:
Item 3: Precautions
Make sure installation tools or other unnecessary items are not left inside the PV input
Maintenance can only be carried out after the inverter totally discharged. AC input
7 8
3.3 The layout of the main components Indicator
There are two LED indicators on the inverter which is used to display the current
3.3.1 External components status of the inverter.
LED Description
POWER The indicator lights when power supply to the inverter is normal.
Emergency STOP
3 touch Screen LCD Operation information display, receive control The emergency stop button immediately disconnects the inverter from both grid and
command and parameters setting battery, which ensure the safety of the inverter. By pressing the emergency stop
4 Off-on knob only control the grid-side switch, and does not button, the device will be locked in the "off" position. Only release the emergency
control the DC-side switch stop button by rotating it clockwise and closing AC, DC breaker, can the inverter
5 Emergency STOP Shut down the inverter when pressed down resume working normally.
Off-on knob
When the DC power system fails, the inverter will immediately disconnect the AC
3.4.3On-grid economic priority mode contactor and enters into the fault mode, so as to ensure the safety of the system.
(1)At this mode, the inverter can prevent the current from flowing back by default, Inverter continuously monitors fault status and will not enter charge and discharge
PV will only need to meet battery charge and load power. mode until the fault is eliminated.
(2)Valley price: working logic is the same to the backup priority mode’s. PV and grid
supply priority to battery, the remaining to load.
(3)Fair price: 3.4.8 Permanent fault mode
A. Battery can neither discharge nor be charged by grid.
When the DC power system is in serious failure, the inverter will immediately
B.PV power supply priority to load, the remaining to battery when PV power is higher
disconnect the AC contactor and enters into the Permanent fault mode, so as to
than load power.
C. When PV power is lower than load power, PV and grid supply to load. ensure the safety of the system. For example: inverter module failure etc. please
(4)Peak price: contact your local dealer or Growatt directly when inverter enters permanent fault
A. Grid will not charge battery. mode, repairmen on site is not allowed without authorization of Growatt.
B. When PV power is higher than load power, PV supply to load , the remaining to
battery.
C. When PV power is lower than load power, there are two conditions:
a. When battery voltage is normal, PV and battery supply to load.
When the ambient temperature is too high, it is normal the inverter
b. When the battery is under voltage, battery will not discharge, PV and grid supply
reduces the output power. However, if this frequently happens,
to load only, not to battery. CAUTION check the cooling surface of the inverter or place the inverter in
better ventilation conditions place. If the inverter fan is dirty, please
clean the fan, if there is problem with the inverter internal
3.4. 4 Micro-grid backup priority mode (generator mode)
electrical, please seek help from professional services.
11 12
3.5 Battery setting 3.8 Dimension
3.6 Protection
Anti-islanding
Lightning protection
Inverter built-in lightning protection module has the DC / AC side lightning over-
voltage protection to avoid inverter from being damaged.
More protection features, please refer to the section 6.3.
3.7 Storage
If there is a long time before installation or operation, the Growatt HPS30 should be
stored appropriately.
To ensure normal operation of the machine, the installation environment is required [Cable trench]
as follows:
The cable connection of inverter adopts bottom inlet and bottom outlet. Cable
> The ingress protection of inverter is IP20. Moreover, as this product is an electronic trenches are recommended.
equipment, it shall not be placed in humid environment;
The cable trenches are often designed and constructed by the construction side
> Install indoors and avoid sunlight and rain; based on relevant standards, with the equipment weight and dimensions required to
be considered. Good electrical connection is needed between different cable
> Ventilation of the room shall be good;
trenches and GND terminals.
> The installation environment shall be clean;
> As some noise will be produced in operation, this equipment shall be installed far
[Wiring specification]
from residential quarters;
Cables in the inverter can be classified into either power cables or data cables.
> The installation ground shall be even enough, and firm enough to support the
weight of inverter; In cabling, the power cable shall be kept far away from, and the cable shall be kept in
right angle at cross. The cable shall be as short as possible, and an appropriate
> The installation position shall be convenient for maintenance;
distance shall be kept to the power cable.
> Ambient temperature range: –25°C~55°C; The power cable and data access shall be placed in different cable trenches
respectively to avoid lengthy routing between the power cable and other cables, so
> Appropriate space shall be reserved for the machine to ensure ventilation and
as to reduce the electromagnetic interruption caused by sudden change of the
cooling.
output voltage. The distance among the power cable and data access shall be more
We suggest inverter is installed in the distribution room. The floor, wall clearance, than 0.2m. When the cables are crossed, the cross angle shall be 90 degrees, while
Ventilation equipment and precaution should be designed by professional personnel the distance can be reduced appropriately.
and satisfy the following requirements.
[Ventilation requirement]
[Foundation requirement]
In operation, inverter will produce a lot of heat. When ambient temperature is too
Inverter is required to install on even ground with fire-retardant material as the high, the electrical property of the equipment may be affected, the equipment may
surface or channel steel support structure, and sag or tilt ground is prohibited. The even be damaged. Therefore, the heat release shall be fully considered in designing
foundation shall be solid, safe and reliable. The foundation shall be capable of the control room to ensure operation of the equipment in high efficiency.
bearing the load of the inverter. Its load bearing ability shall be concerned
throughout the installation place selection.
[Ventilation environment]
[Clearance space] To satisfy the ventilation requirement of inverter, its installation environment shall
meet the following conditions:
During installation of the inverter, appropriate space shall be left to the wall or other
equipment, in order to satisfy the requirements on narrowest maintenance channel, ※ Inverter shall be prevented from being installed in the place of poor ventilation
emergency access and ventilation. condition and insufficient air flow;
15 16
[Ventilation equipment ] 4.3 Mechanical installation
To ensure safe and reliable operation of the equipment, the ambient temperature 4.3.1 Transportation of packaged whole machine
must be within the permission range –25°C~ 55°C, therefore, appropriate
ventilation devices must be equipped with to release the heat generated by the
equipment. We suggest the ventilation rate is more than 3665m³/h.
【NOTE】
·There must be ventilation equipment inside the distribution room to ensure release This inverter is transported as an integrated unit, and the user can hoist it from the
of the waste heat generated by the inverter from the equipment, and allow for bottom with a forklift, or move it with a hoisting crane or crane.
maximum ambient environment temperature. This can be realized from installation
of exhaust devices; Note 1: The inverter is integrated and cannot be dissembled either in transportation
or installation. Any fault attributed to modification unauthorized by the Growatt is
·Another fan can be added at the air duct outlet to exhaust the air out and ensure beyond the quality assurance.
balanced pressure;
Note 2: In movement, tilt, violent shake or sudden force upon the inverter shall be
·The direction of the air outlet shall be selected according to the local actual wind prevented, such as sudden down of lifting.
direction;
Note 3: Please read carefully the labeled parameters to select an appropriate
· Pay attention to the dustproof measures and waterproof design at the air inlet and transportation means and storage place.
outlet;
We suggest the user make use of forklift to move the inverter if possible.
· If more air ducts are required, its dimensions shall be designed by the professionals
according to the air output amount.
To keep the equipment in a better protective status, please adopt transportation with
package as much as possible, and comply with the labels printed on the package in
4.2 Tools and spare parts required for whole machine installation transportation:
· Wire stripper
17 18
Sign Indication
Figure 4-3-2-1
Inverters whose packages are not demolished can be moved with forklift, hoisting [Movement and installation of bear machine]
crane or crane. In moving, attention shall be paid to the weight painted on the
package to ensure enough load capacity of the devices. As the gravity center of the The inverter with demolished package can be moved with forklift, hoisting crane,
equipment locates at the lower place symmetrical in front and back and left and slide rail or crane.
right, the support point or hoisting point shall be arranged reasonably in
If the package demolished place is far from the final installation place, it can be
transportation.
transported with forklift containing wood pallet. It is shown in Figure.
The forklift transportation is the standard one. The gravity center of the cabinet in
transportation should locate between two forks of the forklift. The big-size inverter
may block driver's sight, and it shall be treated with cooperation of the aid
personnel.
Procedure 1: Demolish the wood side and roof of the packaged cabinet
Procedure 2: Demolish the out-set package material on the machine
Procedure 3: Demolish the fastening screws between the machine and the pallet Figure 4-3-2-2
19 20
4.4 Electrical installation 3) Cable requirements
Caution, risk of danger PV and BAT 1 input cable with each 35 mm² Φ8,20N*m
·There is a danger of electrical shock of high voltage in inverter’s Grid input A B C 1 input cables with each 50 mm 2
Φ8,20N*m
NOTICE
operation; only electricians of professional skills can operate.
· All connections with this equipment shall be done under non- Grid output A B C Φ8,20N*m
1 input cables with each 35 mm 2
voltage state.
· The inverter may be damaged if input or output terminal is Φ8,20N*m
N Wire 1 input cables with each 50mm 2
incorrectly plugged.
Failure of acting upon this information may cause serious More than 16 mm².Green and yellow is Φ8,20N*m
Earth Wire
personnel injury or significant property loss even to death. recommended
1) Battery
4.4.2 DC side wiring
The positive and negative highest voltage of the battery shall not exceed 1000V,
otherwise, the equipment will be in over-voltage protection state, and cannot work Caution, risk of danger
normally. Recommended battery capacity is 50kWh
The positive and negative of the battery shall not be connected in
CAUTION! reverse. A multimeter shall be used to determine the polarity
first, and then connect into the corresponding input ends of the
Model Growatt HPS30
Recommended battery capacity 30kW.h
Battery Voltage Limit 1000V
Specific procedures are as follows:
2) Three-phase grid 1) Cut off the distribution circuit breaker at the DC side, and ensure that no voltage
on the wire at DC side.
Inverter will continuously inspect whether the grid satisfy the grid connected 2) Determine the positive and negative with a multimeter.
conditions. The following is the grid limit for satisfaction of local Grid connected 3) Connect the positive of the battery to the "Battery-input +"of The HPS30
Conditions (requirements in different countries may vary, the value can be setup and 4) Connect the negative of the battery to the "Battery-input +"of The HPS30
please refer to local grid connected regulations for details), and the grid is three-
5) Connect the positive of the panels to the "PV-input+" of HPS30
phase grid. Meanwhile, it shall be permitted by local power supply department
6) Connect the negative of the panels to the "PV-input-" of HPS30
before install Grid-connected inverted power.
7) Please be sure that all wirings are fastened.
21 22
Figure 4-4-2 DC side wiring
Figure 4-4-3 AC side wiring
When connecting the AC grid, cut off the circuit breaker at the
AC side to ensure that the AC wire connecting to terminals has 4.4.4 Earthing
CAUTION!
no electricity.
Inverter must be earthing well for safety; Please make sure of the connection
between PE in power distribution cabinet and PE copper in the inverter good; and
make sure the earthing cable more than 16mm2 and the earthing resistance must
satisfy the demand of IEC standard.
Connect AC grid:
1) Cut off the circuit breaker at AC side, to ensure that the AC wire connecting to
All wiring into the channel at the bottom of the inverter to be all the wiring is
terminals has no electricity. Confirm it with a multimeter.
completed, the connection port must be sealed with dust cotton, to prevent dust
2)Connect the port A marked at "AC-input" of HPS30 with "L1" of the grid .
from entering the inside of the inverter.
3)Connect the port B marked at "AC-input" of HPS30 with "L2" of the grid
4)Connect the port C marked at "AC-input" of HPS30 with "L3" of the grid .
5)Connect the port A marked at "AC-output" of HPS30 with "L1" of the load .
6)Connect the port B marked at "AC-output" of HPS30 with "L2" of the load .
4.5 Communication
7)Connect the port C marked at "AC-output" of HPS30 with "L3" of the load .
8) Connect "N" of the load and "N" of the grid with the "N" port of HPS30
The inverter of Growatt PCS series has various communication methods. When the
Ensure that the wiring phase sequence at AC side is in consistent with the phase
user needs to monitor the operating status of DC power generation system, we
sequence at grid side.
provide single-machine and multi-machine control programs, and diversified
9) Please confirm that the wiring is fastened.
communication interfaces for customer's selection.
23 24
4.5.1 RS485 communication 4.6 Installation inspection
The inverter, through RS485 tandem, is connected with the PC for communication Before the inverter is put into operation, it shall be inspected for installation. Two
through RS485/RS232 adaptor. Inside the PC, a multi-machine monitoring software working men or more shall inspect to ensure correct installation of all installation
ShineNet independently developed by the Growatt is monitoring in real time the according to the following table.
operating status of all inverters, as shown in Figure 4-5-1. The RS485 wire should be
less than 1000m.
There is an Ethernet port on the right side of LCD. Please connect the LCD and Correct connection of DC input anode and cathode, and tightening torque
meeting requirements.
Router with Network cable; and then router can make data interaction with serve,
and users can communicate with the inverter by internet. Correct connection of communication lines, and maintaining a certain
distance to other cables.
Other Inspections
25 26
Pilot operation 5 5.2 Inspection
5.1 Relevant requirements Procedure 1: Inspect inverter's installation and wiring conditions based on the
Installation Inspection List in Table 4-6;
Before pilot operation, the installation conditions of the equipment shall be
examined thoroughly, in particular whether voltages at DC and AC ends are Procedure 2: Ensure the AC&DC circuit breakers are cut off;
consistent with inverter's requirements, and whether the polarity etc. are correct.
Procedure 3: Ensure the emergency button is available and woks normally.
Inspect if the system connection meets requirements in relevant standards or codes
and if the system is grounded well.
5.2.2 Grid voltage inspection
Inspect whether the three phases of the inverter is correctively connected with the
Before pilot operation, all switches at AC side and DC side shall three phase sequence of the grid.
ensure to be cut off. Inspect whether the line voltage and frequency are within the prescribed range,
and record the value.
CAUTION!
If possible, measure the phase THD (Total Harmonic Distortion), and inspect the
curve. If distortion is serious, the inverter may fail to operate.
27 28
5.2.3 DC side voltage inspection 5.4 Pilot operation completion
The DC side consists of two parts,from the confluence box or the DC distribution The following procedures shall be carried out after the inverter is normally in
cabinet to the HPS30 and from the storage battery to the HPS30. operation.
Ensure that the direct current from the confluence box or DC distribution cabinet Procedure 1: Inspect whether abnormity exists in the inverter, such as excessive
is connected to the PV terminal of HPS30 and is in sequence. noise, excessive heat, abnormal smell or smoke.
Measuring the open circuit voltage of pv-input cannot exceed the allowable Procedure 2: Measure whether inverter voltage, current and THD are stable.
maximum voltage.
Procedure 3: Operate LCD control panel and inspect whether it displays normally
Ensure that the direct current from the battery is connected to the battery input and accurately.
terminal of HPS30 and the polarity is correct.
By now, the pilot operation of inverter is fully completed, and we can enter the daily
Ensure that the battery voltage is within the limits set by the HPS30,and the operational maintenance.
battery ratio of the HPS30 is correct.
The HPS30 itself can not switch seamlessly between on and off
grid. That is to say,Cutting into the grid when inverter working
in off-grid mode was forbidden. If intend to use the capability of
CAUTION! switch seamlessly between on-grid and off-grid,you need
additional equipment. If there is a demand please contact us.
29 30
6 GUI instruction
6.1 LCD display screen introduction
User can view the information of the inverter operation on the LCD touch screen, as
well as setting the operating parameters. In order to facilitate the operation, a menu
is provided below.
Operation
History Info System Setup On/Off Home
Data
Operation
General fault Language
Data_1
Operation
Data_2 Time setting HPS30
Charge Power
Chart Factory Setting
Disharge Power
Chart Maintenance
Charge Month
Energy Chart
Generation
Disharge Month
Generation 6.2.2 ON/OFF interface
Charge Year
Generation
Clicking “ON/OFF” button in any interface will enter into this interface.
Disharge Year
Generation
There are “ON” and“OFF” button which is used to turn on and turn off the inverter.
Charge 20Years
Generation
Disharge
20Years
Generation
After powering on the LCD,it will enter the home page. Then you can begin to read
the information and set the parameters.
Inverter communication state, station number and system time is displayed at the top
of each page of the LCD.
Each page has five commonly used function keys: "run data" “historical
information” "system settings" “Home” at the below of the page. The five
commonly used keys corresponding sub-menu are under the button, and it will be
marked green after selected.
The operating status of the inverter output power, safety standard, model, input and Submenu: language settings, time settings, inverter information, maintenance.
output voltage, current information can be viewed in the page. Pressing the
following key can switch to other pages. Pressing the left button can enter into the corresponding submenu interface. The
default one is language setting interface.
31 32
Device Information: This page shows the manufacturer, inverter serial number,
hardware and software version information, and the date of manufacturing.
Clicking “historical information” can enter into the sub-menu of the "historical
information".
Time settings: system time setting (if the date and time displayed on LCD is not The submenu includes: history of failure.
inconsistent with the actual date and time, they can be modified here)
History of failure: all the common history of failure details can be found by flipping
the page up and down.
33 34
6.3 LCD display information schedule
No. information
1 DC_Inverse_Failure
2 IGBT_Failure
3 EEPROM_Write_Failure
4 EEPROM_Read_Failure
5 AC_MainContactor_Failure
6 AC_SlaveContactor_Failure
7 RISO_Failure
6.2.5 Operation data 8 DC_VoltHigh_Fault
9 DC_CurrHigh_Fault
Clicking the “Operation data” in any interface will enter into the submenu of
10 DC_OCP_Fault
“operation data”.
11 INT_DC_OverVolt_Fault
The sub-menu includes: real-time data, the power curve, and energy yield figure. 12 INT_DC_OverCurr_Fault
Pressing the left button can enter into the corresponding sub menu interface. The
13 IGBT_Module_Fault
default interface is the real-time data interface.
14 L_OCP_Fault
Insert USB Disk on the back of the LCD display, and the real time operation data will 15 AC_NoUtility_Fault
be stored in the USB Disk in every minute. Inverter will create a “CSV” format file
16 AC_GridPhaseSeque_Fault
every month in the USB disk for data storage.
17 AC_PLL_Fault
Real-time data: current DC power generation parameters and real-time data 18 AC_Volt_Unbalance_Fault
including the grid voltage, the grid frequency, the grid current, DC input voltage, DC
19 AC_Curr_Unbalance_Fault
input current, the internal temperature of the chassis as well as the total power
generation time (updated in real time). 20 AC_WU_OverVolt_Fault
21 AC_WU_UnderVolt_Fault
22 AC_VW_OverVolt_Fault
23 AC_VW_UnderVolt_Fault
24 AC_UV_OverVolt_Fault
25 AC_UV_UnderVolt_Fault
26 AC_OverFreq_Fault
27 AC_UnderFreq_Fault
28 AC_GridCurr_DcHigh_Fault
29 AC_L_Curr_DcHigh_Fault
30 AC_OverCurr_Fault
31 AC_L_Curr_High_Fault
32 AC_Overload_Fault
32 AC_Overload_Fault
33 LVRT_Fault
35 36
No. information
Routine maintenance 7
34 Module_OverTemp_Fault
35 Inductor_OverTemp_Fault
36 Transformer_OverTemp_Fault
37 LowTemp_Fault 7.1 Regular maintenance
38 EPO_Stop
39 KeyEmergencyStop In order to ensure the normal operation of the inverter, regular maintenance work is
40 LcdEmergencyStop required.
Recommended routine maintenance cycle and work, as shown in Table 7-1.
41 AC_MainContactor_Fault
42 AC_SlaveContactor_Fault Table 7-1 Routine maintenance work
43 AC_SPD_Fault
Maintenance item Cycle
44 Inductor_Rly_Fault
45 Transformer_Rly_Fault Clean or replace the dust screen Half a year
37 38
8.2 Growatt Factory warranty
8 Appendix
warranty for the Growatt inverter products Possession of this certificate validates a
8.1 Specification standard factory warranty from the date of purchase.
39 40
—Breaking of the original manufacturers seal;
—Power failure surges, lighting, flood, fire, exposure to incorrect use, negligence,
accident, force majeure, explosion, terrorist act, vandalism or damage caused by
incorrect installation, modification or extreme weather conditions or other
circumstances not reasonably attributable to Growatt.
The warranty shall also cease to apply if the product cannot be correctly identified as
the product of Growatt. Warranty claims will not be honored if the type of serial
number on the inverters have been altered, removed or rendered illegible.
Liability
The liability of Growatt in respect of any defects in its DC inverters shall be limited to
compliance with the obligations as stated in these terms and conditions of warranty.
Maximum liability shall be limited to the sale price of the product. Growatt shall
accept no liability for loss of profit, resultant of indirect damage, any loss of electrical
power and / or compensation of energy suppliers within the express meaning of that
term.
The warranty rights as meant herein are not transferable or assignable to any third
party excepting the named warranty holder.
8.3 Contact
If you have technical problems concerning our products, contact your installer or
Growatt. During inquiring, please provide below information:
·Inverter type
·Modules information
·Communication method
·Serial number of Inverters
·Error code of Inverters
·Display of inverters
41