IM Underground Drilling June 2022 1655491374
IM Underground Drilling June 2022 1655491374
UNDERGROUND DRILLING
The world’s first automated one-boom canopy, it is also available with a closed, air-
jumbo for the small segment, Epiroc’s conditioned, or heated, cabin improving the
new Boomer S10 S
operator’s comfort levels and well-being and
therefore also improving performance and
ultimate productivity. “The FM 2.320 drive
underground development jumbos & production drills zero-emission solutions in their underground
copper operations. These goals are in line with
including the latest battery electric options the current global trends in mining. They recently
or analysis of underground drilling trends, underground conditions very well. carried out lengthy tests of the Roof Master 1.8KE,
United. Inspired.
UNDERGROUND DRILLING
designed structures and proven components the High Performance Development method – a
ensure a reliable workplace for both operators way of working during the entire drill cycle – the
and maintenance crews. Boomer S10 S offers up to 25% more
These rigs are equipped with an electric development metres compared to traditional
driveline system including a battery package and one-boom jumbos. The total cycle time is
an electric motor for zero emissions and reduced reduced thanks to better pull-length,
operating costs. Coupled with its smart battery fragmentation and less need for scaling. “It’s a
charging system, Sandvik says its drills will help snowball effect on productivity: accurate drilling
customers to maximise utilisation of their mine’s holes means less explosives, less scaling and
electrical infrastructure. The batteries can be better tunnel profiles. In turn, a better tunnel
charged during drilling, while electric power can profile means less rock reinforcement and less
be drawn from the system for supporting the tear on all the machines in the drift. All this leads
electrical supply from the mine’s network. The to severe cost reductions and increases
battery even recharges while the rig is tramming productivity and safety for everyone involved,”
downhill, using energy generated by the braking Berggren explains.
system. Epiroc’s Rig Control System, RCS, was first
implemented in 1998. The system is used for
Epiroc’s new Boomer S10 S pushes controlling several vital functions in Epiroc’s
the boundaries machines. It is also an enabler for several
Being the world’s first automated one-boom productivity increasing, efficiency boosting and
Since the rollout of the first Sandvik battery- jumbo for the small segment, Epiroc’s new cost saving automation features.
electric drill in 2016 – the DD422iE – over 3 Boomer S10 S it says pushes the boundaries of Designed for great ergonomics with lower
million metres have been drilled and over 13,000
km have been trammed with these machines what’s to be expected from a face drilling rig. The vibration levels and sound levels (<75 dbA), “the
Boomer S10 S provides near surgical precision in Boomer S10 S is a pure joy to use for the
Sandvik highly automated drills are based on drilling and major cost savings throughout the operator. Apart from offering better visibility and
electric driveline technology, featuring the latest cycle – all thanks to being the world’s first one- a multi-functional joystick, Boomer S10 S grants
technology in drilling automation, data boom jumbo featuring Epiroc’s Rig Control higher comfort and a significant reduction of live
management and tele remote operations. Its i- System. The consistent, repeatable, and quality work.”
series automated battery-powered drills avoid assured results are made possible by advanced
spreading diesel emissions into the environment automation, operator assisting features and Battery electric drill orders filtering in
and help reducing thermal load and digital drill plans. “With Boomer S10 S as our Both Epiroc and Sandvik have been announcing
requirements for ventilation capacity latest addition, we are proud to offer a major order packages over the past year, which
underground. Continuous, unmanned operations sustainable automated operation for the small include battery development jumbos. In April
through shift changes and breaks, utilising data segment, with a complete range of automated 2022, Epiroc announced a major battery-electric
up and downloads through wireless networks are rigs for face drilling, production drilling and rock and autonomous fleet order from the owners of
delivering high levels of performance while reinforcement underground,” said Sarah the Odyssey Mine in Malartic, Québec, Canada.
ensuring safer operations. Increased equipment Hoffman, VP Sales & Marketing at Epiroc’s The order, from the Canadian Malartic
utilisation and productivity while reducing diesel Underground division. Epiroc says the new Partnership, will be used in the new underground
emissions towards zero make the underground Boomer S10 S doesn’t compromise on quality. gold mine. The Odyssey Mine will be accessed by
working environment safer for the teams in “And in this case, great quality means cost a ramp and a shaft estimated to be 1,800 m
operation. savings in terms of wear and tear of rock drilling deep. Plans are to extract 19,000 t of ore at an
The Sandvik DS412iE is a highly automated tools, spare parts, and other consumables. estimated grade of about 2.75 g/t gold and
and productive, battery-powered, bolter for Compared to traditional, non-automated one- roughly 5,000 t/d of waste rock during peak
underground mining operations and civil boom jumbos, Boomer S10 S decreases the operations. The equipment ordered during the
construction tunnelling. This bolter is equipped consumption of consumable parts with 30% March quarter includes battery-electric versions
with an electric driveline system including a while lowering maintenance costs by 12%.” of the Boltec (an M10 Boltec) rock reinforcement
battery package and electric motor for zero Thanks to the digital drill plans and Epiroc’s drill rig, Simba production drill rig and Boomer
emissions while tramming. The Sandvik DL422iE Rig Control System the drill rig
is a fully automated, battery-powered top “is perfectly aligned in the drift to
hammer longhole drill designed for underground optimise ultimate accuracy,”
mass mining in 4 x 4 m or larger production providing less overbreak and
drifts. It is capable of drilling vertical and inclined underbreak, and longer pull
fans and single or parallel Ø89-127 mm rounds. “The Rig Control System
longholes up to 54 m in depth using ST58 and provides drilling accuracy way
ST68 tube rods. Finally, the Sandvik DD422iE is beyond what human eye measure
an electric mining jumbo designed to drive down could ever accomplish. It is high-
production costs while reducing the quality production from start to
environmental impacts of drilling and tunnelling. finish, and a great milestone
Major benefits of this innovative electric drill rig reached for mine development,”
include zero emissions during tramming and said Niklas Berggren, Global Product Manager Odyssey project operator training on an Epiroc
improved productivity. The drill rig's well- face drilling equipment at Epiroc. When applying underground drill simulator
304.525.7811 MANUFACTURED IN
800.543.5431 HUNTINGTON, WV
J.H. Fletcher & Co. cannot anticipate every mine hazard that may develop during use of these products. Follow your mine plan and/or roof control plan prior to use of the product. Proper use, mainte-
nance and continued use of (OEM) original equipment parts will be essential for maximum operating results. 2022 J.H. Fletcher & Co. All Rights reserved.
GOAD SYSTEM
Fletcher’s Graphic Operator Angle Display (GOAD) is offered as an
option on all Fletcher Drill Jumbos. The system utilizes sensors on
the boom and feed mechanisms that display hole angle and depth of
drilling on an in-cab monitor. This ensures accurate boom and feed
alignment for precise hole placement and direction. The system is
designed for use with both burn patterns and V-cut patterns. The
GOAD system in operation, has seen a 30 percent improvement in
the tonnage blasted along with a significant savings in fuel, blasting
agents, drill steel, and bit.
STANDARD GOAD
MULTI-PLANE ASSIST
Built on Answers.
UNDERGROUND DRILLING
face drilling rig (jumbo). It also includes an Easer rig with Sandvik’s
raise boring rig, Scooptram loaders, and unique and patented
Minetruck haulers. The machines will be ”charging-while-
equipped with Epiroc’s telematics system Certiq, drilling” technology,
which allows for intelligent monitoring of the company said.
machine performance and productivity in real
time. Komatsu’s new
In South Africa, Ivanplats’ initial order with ZJ32Bi two boom
Epiroc, for its Platreef primary mining fleet battery jumbo
includes emissions-free, battery-electric M2C Last September,
jumbo face drill rigs, ST14 Battery 14 t Komatsu Mining
Scooptrams (LHDs), battery-electric Boltec introduced a new underground hard-rock drilling The Komatsu ZJ32Bi is a battery-electric, medium-
bolting rigs and MT42 Battery 42 t dump trucks. machine with several advanced features, class jumbo built on a common platform for
Construction of Platreef’s initial solar-power including hoseless booms, at MINExpo 2021 in increased user adoption and efficient training
plant is scheduled to commence in August 2022, Las Vegas. The ZJ32Bi is a battery-electric,
with commissioning expected in 2023. The solar- medium-class jumbo built on a common platform Because of the common platform of the
generated power from the initial plant will be for increased user adoption and efficient training, ZJ32Bi, it essentially becomes a multifunction
used for mine development and construction the company says. The new machine offers a drilling machine, Komatsu says. Other key
activities, as well as for charging Platreef’s standard reduced hose configuration – only six features of the ZJ32Bi include:
battery-powered underground mining fleet. per boom – with a hoseless option. n An intelligent control system that allows for
Sandvik and Hindustan Zinc have signed a At the event, Komatsu showcased the new semi-autonomous functionality or operator
Memorandum of Understanding for supply of a jumbo with two booms and zero hoses. The augmentation;
battery-electric underground equipment fleet to hoseless boom completes all fluid and n A modular battery-electric driveline with up to
be used at Sindesar Khurd Mine to help it communication transfer inside of the boom 130 kW (65 kW base) of on-board energy for
achieve its carbon neutrality ambitions. cylinder, offering a potential game-changer in the demanding tram cycles and rigorous
Deliveries are scheduled to begin in the March terms of automation and productivity, according hard-rock mining;
quarter of 2023, with the fleet being the first to the company. A hoseless boom also eliminates n A newly designed fully enclosed operator
underground battery-electric fleet to be deployed the need to account for hoses in automation cabin with advanced noise reduction,
in India. The equipment to be delivered includes algorithms and eliminates wear between the operator ergonomics, double-curved glass
an 18-t-payload LH518B loader and three 50-t- inner and outer boom tubes for improved drilling with a focus on air cleanliness; and
payload TH550B trucks as well as a DD422iE drill accuracy over time. n Lightweight, durable feeds in fixed and
HYDRAULIC
OIL COOLING
DEEP UNDERGROUND
Suitable for up to 35 bar pressure, Bowman
hydraulic oil coolers are the proven solution for:
• Rock Drilling & Crushing Machines
• Ancillary Mining & Tunnelling Equipment.
• Open Cast Mines with high ambient air temperature.
• Coal Mines
BOWMAN®
EJ Bowman (Birmingham) Ltd, Chester Street, Birmingham B6 4AP, UK
T +44 (0) 121 359 5401 E [email protected] W www.ej-bowman.com
FM38224
1 0 0 Y E A R S O F H E AT T R A N S F E R T E C H N O L O G Y
UNDERGROUND DRILLING
PANTHER T29-12
OUR NEW SAFE HANDHELD REMOTE WITH EXPANDED
FUNCTIONALITY
NEW
UNDERGROUND DRILLING
Enabling
Innovation
Visit us @Exponor 2022
220412_IM_2022.indd 6
Project2_Layout 1 05/05/2022 12:09 Page 3
Training Solutions
– AT – Pipe Umbrella VR Simulator
– EDVIRT SSI™
– VR Hand Spraying Simulator™
– VR Shotcrete Simulator™
– VR Scaling Simulator™
dsiunderground.com
04.05.2022 17:43:23