0% found this document useful (0 votes)
21 views

Inspection Practice: Practical Exercise in Teams of 5

The document discusses inspection practices for concrete structures and includes 5 cases related to acceptable tolerances and measurements for formwork thickness, rebar cover, pavement uniformity deviations, temperature reinforcement spacing in slabs, and measurement of standard hooks on shear wall reinforcement bars.

Uploaded by

Danilo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Inspection Practice: Practical Exercise in Teams of 5

The document discusses inspection practices for concrete structures and includes 5 cases related to acceptable tolerances and measurements for formwork thickness, rebar cover, pavement uniformity deviations, temperature reinforcement spacing in slabs, and measurement of standard hooks on shear wall reinforcement bars.

Uploaded by

Danilo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Inspection Practice

Practical Exercise in Teams of 5


ACI 117

ASTM C94

ACI 301
References: ACI 311

ACI 304

CRSI –Concrete Reinforcing Steel Institute


Formwork vs Falsework
The thickness of the footing
Case 1 of a structural element is 48
cm. However, the formwork
was made with 50 cm.
This is:

Acceptable

Not Acceptable
• You must inspect the cover
of a #6 rebar in an exposed
structure to earth and
weather. That covering must
be:

2 cm 3,8 cm

4 cm
Case 2 5 cm
• In a pavement for high-
speed traffic, the uniformity
is considered acceptable for
traffic if the deviations do
not exceed:

1 mm 3 mm

5 mm 10 mm

Case 3
• You must inspect a slab with
0,10 m of thickness. The
temperature reinforcement
was spaced 0,50 m. This
spaced is:

Acceptable

Not Acceptable

Case 4
• You must inspect a shear
wall and you saw a #4
bars with a standard hook.
What should be the
measurement of the hook
(180 degrees)

5,5 cm 6,0 cm

4,0 cm 6,5 cm
Case 5