DEMOLITION CONTRACT
Dear:
We are formally submitted here with our offer for the demolition of your old
house. Please review the following requirements of our demolition.
Subject :
Location :
Demolition services shall be in exchange of:
A.) Your company will pay the amount of (P 0.00pesos) for demolishing your (#)
story concrete house with clearing.
B.) Down payment of P 0.00 pesos must be given before the start day of
demolition work.
C.) And for the final payment, P 0.00 pesos shall be given upon 100%
accomplishment of the said demolition works.
Bank Details:
Account name:
Account number:
Bank:
**All materials such as Roof & Lumber will be recovered by the contractor’s side.
**All salvageable materials such as wires/cables, embedded deformed bars & scrap
metals, etc.
will be recovered by the demolition contractor/buyer’s side.
• COMPLETE SET – Cutting Torch Kit & Tank
Torch Handle
Oxygen Attachment
Oxygen Regulator & Tank
Acetylene Regulator & Tank
Welding Nozzles (Nos. 3, 5, & 7)
Mixer
Cutting Nozzle
Twin Hose: 15ft x 1/4" C/W Fittings
Tip Cleaner
Goggles Spark Lighter
• Demolition Tools
Tactical Pry Bar & Crowbar
Sledgehammer
Nail Set
Framing Hammer
Phillips & Straight Flat Screwdrivers
Demolition Maul
Chisels
Crosscut Saw
Shovel
Demolition Rope 30ft. long 2pcs.
Demolition Hammer
Scope of Work:
a.) Complete demolition of all standing structure.
b.) Dismantling of house up to ground floor level only.
c.) Hauling out of all retrievable materials.
d.) With clearing and hauling.
e.) Dismantling of firewall.
f.) Demolition of perimeter fence.
Terms and conditions:
a.) Mobilization of manpower, necessary tools and equipment shall be provided by
the contractor. We can already start working on the demolition of the said house
within the day after receiving your approval and procurement of the necessary
demolition and barangay permits.
b.) The existing rules and regulation being implemented by the village/barangay shall
be strictly followed by the contractor while on the course of demolition works.
c.) Any untoward incidents/ accidents to workers or third party inside the property or
within the peripheral of the demolition area that may occur on the course of
demolition works shall be for the demolition contractor’s sole liability.
d.) Erection of safety signs, barriers, nets, etc. shall be for demolition company
expense.
e.) Duration of work must be completed within maximum of (14) days, and shall
commence effectively, procurement of the necessary barangay and demolition
permits and after receiving the owner notice to proceed.
f.) All the retrievable materials shall have a designated area of stockpile.
g.) The demolition contractor shall not be held liable for any delays caused by “force
majure” or deemed as act of God. Hence an extension of time may be granted by
the owner.
h.) Request for additional time shall be subject to owner’s approval for clarification
and may only be granted by the owner through agreed terms and condition
acceptable to both parties
i.) Homeowner to provide Utilities access during the course of demolition and said
bills incurred shall be for demolition contractor’s expenses.
________________________
Owner/Authorized Personnel
________________________
Proprietor