0% found this document useful (0 votes)
128 views7 pages

Tugas DNV RP E305 - 15518026 - Irfan Naufal

This document provides pipeline and environmental properties for conducting an on-bottom stability analysis according to DNV RP E305. It includes details on the pipeline geometry, material properties, coatings, marine growth, soil properties, and metocean conditions like water depth, currents, and waves. Submerged weight calculations are also provided for both installation and operation.

Uploaded by

Irfan Naufal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views7 pages

Tugas DNV RP E305 - 15518026 - Irfan Naufal

This document provides pipeline and environmental properties for conducting an on-bottom stability analysis according to DNV RP E305. It includes details on the pipeline geometry, material properties, coatings, marine growth, soil properties, and metocean conditions like water depth, currents, and waves. Submerged weight calculations are also provided for both installation and operation.

Uploaded by

Irfan Naufal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

On-Bottom Stability Analysis Tutorial

Based on DNV RP E305


Irfan Naufal - 15518026

Pipeline Properties (Seamless pipe, flammable content)

Outer Diameter Do ≔ 10.75 in = 273.05 mm

Wall Thickness tst ≔ 0.5 in = 12.7 mm

Specific Minimum Yield Strength SMYS ≔ 450 MPa

Specific Minimum Tensile Strength SMTS ≔ 535 MPa

Carbon Steel Density ρst ≔ 7850 kg ⋅ m -3

Steel Modulus Elasticity E ≔ 2.07 ⋅ 10 5 MPa

Poisson Ratio ν ≔ 0.3

Pipeline Joint Length lp ≔ 12.2 m

Corrosion Allowance tca ≔ 3 mm

Air Density tca ≔ 3 mm

Reservoir content Density ρreservoir ≔ 52.7 lb ⋅ ft -3

Air Density ρair ≔ 0 kg ⋅ m -3

Coating Properties

Corrosion Type 3LPE


Corrosion Coating Density ρcorr ≔ 940 kg ⋅ m -3

Corrosion Coating Thickness tcorr ≔ 3.5 mm

Corrosion Coating Cutback cccorr ≔ 150 mm


Concrete Density ρcc ≔ 3040 kg ⋅ m -3

Concrete Cutback ccconc ≔ 350 mm

Polyurethane Foam Infill ρif ≔ 1025 kg ⋅ m -3

Environmental Data
ρif ≔ 1025 kg ⋅ m -3

Environmental Data

Water Depth d ≔ 57.9 m

Seawater Viscosity v ≔ 1.076 ⋅ 10 -5 ft 2 ⋅ s -1

Significant Wave Height 1-yr Period Hs.1yr ≔ 3.24 m


‾‾‾‾‾‾‾‾‾
250 ⋅ Hs.1yr
Peak Wave Period 1-yr Tp.1yr ≔ ―――― = 9.088 s
g

Significant Wave Height 10-yr Period Hs.10yr ≔ 4.75 m


‾‾‾‾‾‾‾‾‾‾
250 ⋅ Hs.10yr
Peak Wave Period 10-yr Tp.10yr ≔ ――――= 11.004 s
g

Significant Wave Height 100-yr Period Hs.100yr ≔ 5.19 m


‾‾‾‾‾‾‾‾‾‾
250 ⋅ Hs.100yr
Peak Wave Period 100-yr Tp.100yr ≔ ―――― = 11.503 s
g

1-yr Current Speed (51.3 m MSL) U1yr ≔ 0.52 m ⋅ s -1

10-yr Current Speed (51.3 m MSL) U10yr ≔ 0.55 m ⋅ s -1

100-yr Current Speed (51.3 m MSL) U100yr ≔ 0.62 m ⋅ s -1

Marine Growth Density ρmg ≔ 1400 kg ⋅ m -3

Marine Growth Thickness tmg ≔ 75 mm

kg
Seawater Density ρw ≔ 1025 ――
m3
Soil Type: soil ≔ “clay”

Bottom Roughness z0 ≔ 5 ⋅ 10 -5 mm

Grain Size d50 ≔ 0.065 mm

Current Measurement Depth Ref. zr ≔ d - 51.3 m = 6.6 m

Sea State Durations Tstorm ≔ 3 hr = ⎛⎝1.08 ⋅ 10 4 ⎞⎠ s

Clay Undrained Shear Strength su ≔ 2 kPa

kN
Submerged Weight γs' ≔ 3.5 ――
m3

kN
Bulk Weight Unit γs ≔ 12.7 ――
m3
kN
Bulk Weight Unit γs ≔ 12.7 ――
m3
Current Directionality θc ≔ 90 deg

Submerged Weight Calculation (Installation)

Concrete Thickness tcc ≔ 15 mm

Inner Diameter Di.ins ≔ ⎛⎝Do - 2 ⋅ ⎛⎝tst - tca - ⎛⎝0.125 ⋅ tcc⎞⎠⎞⎠⎞⎠ = 257.4 mm

1
Pipeline Cross Section Area As.ins ≔ ―⋅ π ⋅ ⎛⎝Do 2 - Di.ins 2 ⎞⎠ = 0.007 m 2
4

Pipeline Weight Wst.ins ≔ ρst ⋅ As.ins ⋅ lp ⋅ g = 6.123 kN

Corrosion Coating Diameter Dcor.ins ≔ Di.ins + 2 ⋅ tcorr = 264.4 mm

π
Corrosion Coating Area Acor.ins ≔ ―⋅ ⎛⎝Dcor.ins 2 - Di.ins 2 ⎞⎠ = 0.003 m 2
4

Corrosion Coating Length lcor.ins ≔ lp - 2 ⋅ cccorr = 11.9 m

Corrosion Coating Weight Wcorr ≔ ρcorr ⋅ g ⋅ Acor.ins ⋅ lcor.ins = 0.315 kN

Concrete Diameter Dconc.ins ≔ Dcor.ins + 2 ⋅ tcc = 0.294 m

1
Concrete Cross Section Area Acc ≔ ―⋅ π ⋅ ⎛⎝Dconc.ins 2 - Dcor.ins 2 ⎞⎠ = 0.013 m 2
4

Concrete Coating Length lcc ≔ lp - 2 ⋅ ccconc = 11.5 m

Concrete Coating Weight Wcc.ope ≔ ρcc ⋅ Acc ⋅ lcc ⋅ g = 4.514 kN

π
Content Cross Section Area Areservoir ≔ ―⋅ Di.ins 2 = 0.052 m 2
4

Content Weight Wreservoir ≔ ρreservoir ⋅ Areservoir ⋅ lp ⋅ g = 5.256 kN

1
Infill Cross Section (Corr. Cutback) Aif.corr ≔ ―⋅ π ⋅ ⎛⎝Dconc.ins 2 - Do 2 ⎞⎠ = 0.01 m 2
4

Coating Infill Weight Wif.corr ≔ ρif ⋅ Aif.corr ⋅ 2 ⋅ ccconc = 6.827 kg

1
Infill Cross Section (Concrete Cutback) Aif.cc ≔ ―⋅ π ⋅ ⎛⎝Dconc.ins 2 - Dcor.ins 2 ⎞⎠ = 0.013 m 2
4

Coating Concrete Infill Weight Wif.cc ≔ ρif ⋅ Aif.cc ⋅ 2 ⋅ ccconc = 9.447 kg

Infill Weight Wif ≔ ⎛⎝Wif.corr + Wif.cc⎞⎠ ⋅ g = 0.16 kN

Marine Growth Diameter Dmg.ins ≔ Dconc.ins + 2 ⋅ tmg = 0.444 m


Wif ≔ ⎛⎝Wif.corr + Wif.cc⎞⎠ ⋅ g = 0.16 kN

Marine Growth Diameter Dmg.ins ≔ Dconc.ins + 2 ⋅ tmg = 0.444 m

π
Buoyancy Force (per unit length Bins ≔ ρw ⋅ g ⋅ ―⋅ Dmg.ins 2 = 1.559 kN ⋅ m -1
4

Pipeline Submerged Weight (per unit Wsub.ins ≔ ⎛Wst.ins + Wcorr + Wcc.ope + Wif ↲⎞ ↲
length) ⎜ ⎟
⎝+ Wreservoir ⎠
1
⋅ ―- Bins
lp
kg
Wsub.ins = -217.548 ――
s2

Submerged Weight Calculation (Operation)

Concrete Thickness tcc.ope ≔ 29 mm

Inner Diameter Di.ope ≔ ⎛⎝Do - 2 ⋅ ⎛⎝tst - tca⎞⎠⎞⎠ = 253.65 mm

1
Pipeline Cross Section Area As.ope ≔ ―⋅ π ⋅ ⎛⎝Do 2 - Di.ope 2 ⎞⎠ = 0.008 m 2
4

Pipeline Weight Wst.ope ≔ ρst ⋅ As.ope ⋅ lp ⋅ g = 7.537 kN

Corrosion Coating Weight Wcorr = 314.693 N

Concrete Diameter Dtot.ope ≔ Dcor.ins + 2 ⋅ tcc = 0.294 m

1
Concrete Cross Section Area Acc ≔ ―⋅ π ⋅ ⎛⎝Dtot.ope 2 - Dcor.ins 2 ⎞⎠ = 0.013 m 2
4

Concrete Coating Length lcc ≔ lp - 2 ⋅ ccconc = 11.5 m

Concrete Coating Weight Wcc.ope ≔ ρcc ⋅ Acc ⋅ lcc ⋅ g = ⎛⎝4.514 ⋅ 10 3 ⎞⎠ N

π
Content Cross Section Area Areservoir ≔ ―⋅ Di.ope 2 = 0.051 m 2
4

Content Weight Wreservoir ≔ ρreservoir ⋅ Areservoir ⋅ lp ⋅ g = ⎛⎝5.104 ⋅ 10 3 ⎞⎠ N

1
Infill Cross Section (Corr. Cutback) Aif.corr ≔ ―⋅ π ⋅ ⎛⎝Dtot.ope 2 - Do 2 ⎞⎠ = 0.01 m 2
4

Coating Infill Weight Wif.corr ≔ ρif ⋅ Aif.corr ⋅ 2 ⋅ ccconc = 6.827 kg

1
Infill Cross Section (Concrete Cutback) Aif.cc ≔ ―⋅ π ⋅ ⎛⎝Dtot.ope 2 - Dcor.ins 2 ⎞⎠ = 0.013 m 2
4

Coating Concrete Infill Weight Wif.cc ≔ ρif ⋅ Aif.cc ⋅ 2 ⋅ ccconc = 9.447 kg

Infill Weight Wif ≔ ⎛⎝Wif.corr + Wif.cc⎞⎠ ⋅ g = 159.594 N

Marine Growth Diameter Dmg.ope ≔ Dtot.ope + 2 ⋅ tmg = 0.444 m


Marine Growth Diameter Dmg.ope ≔ Dtot.ope + 2 ⋅ tmg = 0.444 m

π kg
Buoyancy Force Bope ≔ ρw ⋅ g ⋅ ―⋅ Dmg.ope 2 = ⎛⎝1.559 ⋅ 10 3 ⎞⎠ ――
4 s2
1
Pipeline Submerged Weight (per unit Wsub.ope ≔ ⎛Wst.ins + Wcorr + Wcc.ope + Wif ↲⎞ ⋅ ―- Bope
length) ⎜ ⎟ lp
⎝+ Wreservoir ⎠

kg
Wsub.ope = -230.008 ―
s2

Velocities associated to wave and current

Analysis Condition cond ≔ “operation” dominant ≔ “wave”

Concrete Thickness tcc ≔ tcc.ope

Total Diameter D ≔ Dcor.ins + 2 tcc = 0.322 m

m
Current Velocity U ≔ if dominant = “wave” ∧ cond = “installation” | = 0.55 ―
‖ | s
‖ U1yr |
else if dominant = “current” ∧ cond = “installation”|
‖ |
‖ U10yr |
|
else if dominant = “wave” ∧ cond = “operation” |
‖ |
‖ U10yr |
else |
‖ |
‖ U 100yr |

Significant Wave Height Hs ≔ if dominant = “wave” ∧ cond = “installation” | = 5.19 m


‖ |
H
‖ s.10yr |
else if dominant = “current” ∧ cond = “installation”|
‖ |
‖ Hs.1yr |
|
else if dominant = “wave” ∧ cond = “operation” |
‖ |
‖ Hs.100yr |
else |
‖ |
‖ Hs.10yr |

Peak Wave Period Tp ≔ if dominant = “wave” ∧ cond = “installation” | = 11.503 s


‖ |
‖ Tp.10yr |
else if dominant = “current” ∧ cond = “installation”|
‖ |
‖ Tp.1yr |
|
else if dominant = “wave” ∧ cond = “operation” |
‖ |
‖ Tp.100yr |
else |
‖ |
‖ T p.10yr |
kN
Submerged Weight Wsub ≔ if cond = “installation” | = -0.23 ――
‖W | m
‖ sub.ins |
else if cond = “operation”|
‖W |
‖ sub.ope ||
kN
Wsub ≔ if cond = “installation” | = -0.23 ――
‖W | m
‖ sub.ins |
else if cond = “operation”|
‖W |
‖ sub.ope ||

m
Us ≔ ―
s
Tu ≔ 12.096 s

⎛⎛ z0 ⎞ ⎛D ⎞ ⎞
⎜ ⎜1 + ―⎟ ⋅ ln ⎜―+ 1⎟ - 1 ⎟
⎜⎝ D⎠ ⎝ z0 ⎠ ⎟ m
Vc ≔ U ⋅ ―――――――― ⋅ sin ⎛⎝θc⎞⎠ = 0.432 ―
⎜ ⎛ zr ⎞ ⎟ s
⎜ ln ⎜―+ 1⎟ ⎟
⎜⎝ ⎝ z0 ⎠ ⎟⎠

1
Friction calibration factor μ ≔ 1.3 ―= 1 Ω
(Figure 5.11) S
Lift Force Coefficient CL ≔ 0.9
(Section 5.3.8)
Drag Force Coefficient CD ≔ 0.7
(Section 5.3.8)
Inertia Force Coefficient CM ≔ 3.29
(Section 5.3.8)
2 ⋅ π ⋅ Us m
Significant acceleration As ≔ ――― = 0.519 ―
perpendicular to pipeline Tu s2
(Section 5.3.8)
1 2
Lift Force FL ((θ)) ≔ ―ρw ⋅ D ⋅ CL ⋅ ⎛⎝Us ⋅ cos ((θ)) + Vc⎞⎠
(Section 5.3.8) 2
1
Drag Force FD ((θ)) ≔ ―ρw ⋅ D ⋅ CD ⋅ ⎛⎝Us ⋅ cos ((θ)) + Vc⎞⎠ ↲
(Section 5.3.8) 2
⋅ ||Us ⋅ cos ((θ)) + Vc||

π ⋅ D2
Inertia Force FI ((θ)) ≔ ――― ⋅ ρw ⋅ CM ⋅ As ⋅ sin ((θ))
(Section 5.3.8) 4

⎛⎝FD ((θ)) + FI ((θ))⎞⎠ + μ ⋅ FL ((θ))


θ ≔ 0 , 0.1 ‥ 180 FLateral ((θ)) ≔ ―――――――――
μ
0.56
0.49
0.42
0.35 FD ((θ)) ⎛⎝kN ⋅ m -1⎞⎠
0.28

FL ((θ)) ⎛⎝kN ⋅ m -1⎞⎠


0.21
0.14
0.07
0
0 20 40 60 80 100 120 140 160 180 FI ((θ)) ⎛⎝kN ⋅ m -1⎞⎠
-0.07
-0.14
-0.21 FLateral ((θ)) ⎛⎝kN ⋅ m -1⎞⎠

θ ((deg ))