100% found this document useful (1 vote)
1K views2 pages

Steel Reinforcement Reconciliation Report

This document provides a steel reinforcement reconciliation for the 4A Head Regulator location of the NCC Limited Chitradurga Branch Canal Drip Pkg-3 project. It shows that the total drawing quantity, cumulative received quantity, stage-wise drawing quantities for the raft, side walls and slab, and cumulative consumption are all equal to zero for bar diameters of 8mm, 10mm, 12mm, 16mm, 20mm, 25mm and 32mm. The balance stock as per physical verification and consumption also equal zero. There are no variances against the drawings or physical stock.

Uploaded by

Nagothu Nikhil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views2 pages

Steel Reinforcement Reconciliation Report

This document provides a steel reinforcement reconciliation for the 4A Head Regulator location of the NCC Limited Chitradurga Branch Canal Drip Pkg-3 project. It shows that the total drawing quantity, cumulative received quantity, stage-wise drawing quantities for the raft, side walls and slab, and cumulative consumption are all equal to zero for bar diameters of 8mm, 10mm, 12mm, 16mm, 20mm, 25mm and 32mm. The balance stock as per physical verification and consumption also equal zero. There are no variances against the drawings or physical stock.

Uploaded by

Nagothu Nikhil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

NCC Limited

Chitradurga Branch Canal Drip Pkg-3


Steel Reinforcement Reconciliation
Location :- 4A Head Regulator

Dia of HYSD bar


Sl.No Description Unit Total
8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
A Total Drawing Quantity MT 0
B Cumulative Received MT 0
C Stage-wise drawing qty details
1 Raft MT 0
2 Side walls MT 0
3 Slab MT 0
Drawing Qty upto Slab level MT 0 0 0 0 0 0 0 0
D Consumption Details
1 Raft MT 0
2 Side walls MT 0
3 Slab MT 0
Cumulative Consumption MT 0 0 0 0 0 0 0 0
E Balance Stock
As per physical verification MT 0 0 0 0 0 0 0 0
As per consumption MT 0 0 0 0 0 0 0 0
F Variance
1 Against Drawing
i) Raft MT 0 0 0 0 0 0 0 0
ii) Side walls MT 0 0 0 0 0 0 0 0
iii) Slab MT 0 0 0 0 0 0 0 0
Total MT 0 0 0 0 0 0 0 0
2 Against Physical Stock MT 0 0 0 0 0 0 0 0
NCC Limited
Chitradurga Branch Canal Drip Pkg-3
Steel Reinforcement Reconciliation
Location :- 4A Head Regulator

Dia of HYSD bar


Sl.No Description Unit Total
8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
A Total Drawing Quantity MT 0

B Cumulative Received MT 0

C Consumption Details

1 Raft MT 0

2 Side walls MT 0

3 Slab MT 0

Cumulative Consumption MT 0 0 0 0 0 0 0 0

D Balance Stock

As per physical verification MT 0 0 0 0 0 0 0 0

As per consumption MT 0 0 0 0 0 0 0 0

E Variance

1 Against Physical Stock MT 0 0 0 0 0 0 0 0