0% found this document useful (0 votes)
579 views17 pages

Documents Required For EIL Approval

EIL Approval for Oil & Gas Equipments and technologies

Uploaded by

NORTECH TRINITY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
579 views17 pages

Documents Required For EIL Approval

EIL Approval for Oil & Gas Equipments and technologies

Uploaded by

NORTECH TRINITY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 17
ENHANCEMENT/ REVALIDATION OF Netuninars” CONSTRUCTION CONTRACTORS AND Page tof 17, LOGISTIC SERVICE PROVIDERS EROS GAINGNERS _ proceoURE FOR ENLISTMENT! Document No#-1844.001 Bares © NDA UTED Rev. 1 PROCEDURE FOR ENLISTMENT/ ENHANCEMENT! REVALIDATION AND PERFORMANCE MONITORING OF CONSTRUCTION CONTRACTORS AND LOGISTIC SERVICES PROVIDERS “eit $0000. Re 228-2014 Sei NN PROCEDURE FOR ENLISTMENT? Document Nos. 10440011 ENHANCEMENT REVALIDATION AND * Bakes NOAUMTD — Pehronmance moNTTORING age 20117 — aay OF CONSTRUCTION CONTRACTORS Ano Losisnc Senvice PROVIDERS ‘Abbreviations: PSE ‘Cantal Public Sector Entorprise Die) ‘Director (Commercat Be Engineer n-Charge = Enginors India Limited Erce Engineering, Procurement, Consiructon & Commissioning HOD Head of Department iso International Organization fr Standardization ct Master Contractors List ‘OcEME ‘Online Contractor Enlistment Management System POD. Procurement Development Department Pat Project Manager PME Projet Management Consultant PSU CPSE Public Sector Unil Cental Publi Sector Enterprise Row Resident Construction Manager scec ‘Supplier Contractor Evaluation Cormites ‘SOR ‘Sehedule of Rates Sst ‘Small Scale Industry Document Drafting Committee (DDC) Members: 4. Dalchand Agrawal 2. Sumeet Sharma 3. Hemananda Seth Document Review Committee (DRC) Members: 1. Kaltagh Kumar 2. Neeraj Mathur ED (SCHnspection) “unneo 2n0004-72 Ry 2/98 142084 capa i mat Dseument No-.1844.0017 Sinn emcee OE ‘arent MOMERALWSAY OF CONSTRUCTION CONTRACTORS {NO LOGISTIC SERVICE PROVIDERS. CONTENTS CLAUSE NO. THLE SHEET NO. 1 PURPOSE 2 ‘SCOPE 3 REFERENCES “ 4 DEFINITIONS oe 5 METHODOLOGY AND CONTROLS oe 6 TERMS & CONDITIONS a 7. [DOCUMENTATION AND RECORDS ® 8 ‘QUALIFICATION CRITERIA oa SAE NCNERS __,haoceoune ron ensruenT) | Oseumeninosseeort fi ip emnncentnt/nevALonTON Axo Rov eBarbits SNA [PERFORMANCE MONITORING Page dots? Renton stwentewms OF CONSTRUCTION CONTRACTORS ‘mip Locis ie semice PROVIDERS 4. PURPOSE ‘As a Consultant, it's obigatory on the patt of EIL to have @ fist of Construction Contractor! Logistic Service Providers for projects being executed by Ell. Accordingly preparing, updating and maintaining the Uist of contractors shall be camied out by Procurement Development Deparment (PDD) on reguar basis, The purpose of this procedure is to formulate methodology tb be folowed for Entstmentienhancemert/ Revalidation ang performance monitring of construction contractors and logistic sorice providers, 2. SCOPE ‘This procedure ie applicable for Indigenous as well as Foreign Construction Contractors and Logistic Service Providers. This document does not cover the

You might also like