Excavation Permit for Arabian Ranches III

This excavation permit document provides details for excavation work on Plot 6482150 in Arabian Ranches III. It grants permission to excavate for the construction of a 1B+G+1F+R 132 KV substation building for Dubai Electricity & Water Authority. The permit is issued to contractor Danway Electrical & Mechanical Engineering L.L.C and is valid until expiry date with conditions that initial designs be approved, vehicle access be permitted, and DDA regulations are followed.

Uploaded by

raj vaddi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
652 views2 pages

Excavation Permit for Arabian Ranches III

This excavation permit document provides details for excavation work on Plot 6482150 in Arabian Ranches III. It grants permission to excavate for the construction of a 1B+G+1F+R 132 KV substation building for Dubai Electricity & Water Authority. The permit is issued to contractor Danway Electrical & Mechanical Engineering L.L.C and is valid until expiry date with conditions that initial designs be approved, vehicle access be permitted, and DDA regulations are followed.

Uploaded by

raj vaddi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BUILDING PERMIT

Permit Type Excavation Permit Number B2201679


Plot Number 6482150 Initial Issue Date 07-Jun-2022
Current Issue Date 07-Jun-2022 Expiry Date

BUILDING DESCRIPTION/HEIGHT BUILDING USE


Building 1: 1B+G+1F+R Building 1: 132 KV Substation

PROJECT INFORMATION:
Project Location ARABIAN RANCHES III
Plot Owner DUBAI ELECTRICITY & WATER AUTHORITY
Consultant LAKSHMI ENGINEERS ARCHITECTS & DESIGNERS
Contractor DANWAY ELECTRICAL & MECHANICAL ENGINEERING L.L.C 237177
Enabling Contractor

PROJECT CONDITION(S):
1. NOC from RTA for proposed vehicle accesses/TIS to be obtained. before Start of work
2. Initial design approval from Dubai Civil Defense to be obtained. before Start of work

NOTE(S):
1. This permit is restricted for Excavation Works.
2. Kindly refer to the attached comment sheet & approved drawings. The comments to be noted and complied.

GENERAL TERMS & CONDITIONS:


1. Dubai Development Authority shall bear no liability arising from the issuance of this permit and both Consultant and/or the Contractor shall bear the full
liability resulting from any errors in design, execution, stability and safety of building in accordance with Dubai Development Authority Laws and regulations
2. The Contractor shall build according to the permit approved drawings, with full adherence to the Health, Safety & Environment regulations on site.
3. This permit shall be cancelled in the event the work does not commence within six months from the date of issuance.
4. The next stage permit (Preliminary / Interim) or Final building permit to be obtained from Dubai Development Authority within six months from the issuance
of this permit. If not, site should be reinstated to its original condition.
5. The Excavation Permit and approved drawings must be always displayed on site for ready reference by Dubai Development Authority inspectors.
6. All the Sub-Contractors must have a valid trade license from Dubai at all time.
7. Dubai Development Authority regulations and construction laws must be followed, and Development Control Department must be notified at all times of
the followings:
• For Land Demarcation: Prior to Hoarding and mobilization works.
• For Dewatering: Prior to discharge of water from site.
• The work has been suspended (through form No. ZDDC-65) and/or resuming the work after suspension
• In case of any collapses or damages in the building under construction or the neighboring building or services, or any accidents and/or incidents on hotline:
800-4332

REQ-459886-0 Page 1 of 2
COMMENTS SHEET
Service Name Excavation Permit
Permit No. B2201679 Status No Objection With Comments
Plot No. 6482150 Project Location ARABIAN RANCHES III

COMMENT(S)
Operations Marwan Merhi Status: No Objection With Comments
1. Hoarding &signboard details to be as per Circular-331 ([Link]
2. Fire team should be available & trained
3. Hoarding, Offices, Signboard & Storages to be removed / relocated within 7 days of Zoning affair (DDA) instruction
4. Coordinate with on board infrastructure consultant & contractor
5. Control the entrance & Exit
Structural Marwan Alzaylaie Status: No Objection

NOTE(S):
The above comments issued along with the Excavation Permit to be noted and complied.

REQ-459886-0 Page 2 of 2