0% found this document useful (0 votes)
2K views

Priorities For Development Projects (20% Component of Nta Utilization) (FY: - )

This document is a form for prioritizing development projects to be funded by 20% of the Net Tax Allotment for a given fiscal year in a specific barangay. It includes sections for listing the priority projects by rank, with descriptions of each project, their individual costs, and a cumulative total column to ensure funding does not exceed the 20% allotment. Instructions at the bottom provide guidance on filling out the form to properly rank and cost development projects for the fiscal year.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Priorities For Development Projects (20% Component of Nta Utilization) (FY: - )

This document is a form for prioritizing development projects to be funded by 20% of the Net Tax Allotment for a given fiscal year in a specific barangay. It includes sections for listing the priority projects by rank, with descriptions of each project, their individual costs, and a cumulative total column to ensure funding does not exceed the 20% allotment. Instructions at the bottom provide guidance on filling out the form to properly rank and cost development projects for the fiscal year.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

AIP Form No.

4 Annex 3

Republic of the Philippines


Province of ___________________
City/ Municipality of __________________
Barangay _______________________

PRIORITIES FOR DEVELOPMENT PROJECTS


(20% COMPONENT OF NTA UTILIZATION)
(FY: _________)

TOTAL NTA for FY: _________________


X 20% = _________________

Priority Development Projects


Cumulative
Funded by the 20% of NTA RANK Project Cost
TOTAL
(2) (3)
(4)
Project Description (1)

Instructions:

(1) Describe the project to be implemented like construction of a Day Care Center,
acquisition of a computer, etc, in their order of priority.
(2) Indicate in this column the ranking of development projects in their proper order,
Rank 1 is the first priority, Rank 2 is the second, etc.
(3) Indicate the total project cost that will complete the project.
(4) Add all project costs from Rank 1 to the last rank equivalent to the 20% of the IRA or
higher

Reference: Department of Budget and Management. (2006). Budget Operations Manual for Barangays

You might also like