Full FSI will be granted, in cases where width of the abutment of the plot or access is less than 9.00m but deprived from public street road width of more than 9.0m
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here .
Available Formats
Download as PDF or read online on Scribd
Go to previous items Go to next items
Save Full FSI will be granted, in cases where width of ... For Later Nev
* MUNICIPAL CORPORATION OF GREATER MUMBAL
OFFICE OF THE CHIEF ENGINEER DEVELOPMENT PLAN
No. ChEng/DP/ 2401/Gen of 30/07/2020
Sub.: - Policy for allowing development of residential plot with smaller width of
abutment to public street/road
Reft- 1) The then Hon'ble M.C.’s note sheet in CHE/WS/5S76/H/Eas/NEW
t.24.4.2019 (pg. C-123)
2) Report of this office dt. 07.01.2020 at pg. N-3/N-4,
3) CFO's remarks dt. 17.03.2020 at pg. N-S/N-8
4) This office’s note dt. 23.04.2020 at pg. N-9
Reference is requested to the case of Architect Shri Arun Kumar Dubey who has
submitted proposal for requited concession for proposed redevelopment of existing residential
building known as ‘Royal Dimond Park CHSL’ at Kolekalyan, Santacruz (E) for Hon'ble
M.C.'s approval on 23.04.2019 and Hon’ble M.C.°s remarks ie, “for the present, the proposal is
approved assuming that there is only a 6.0 m access, without allowing TDR/Premium FSI as per
DCPR2034. Please formulate the policy on how to deal with pipe access to the building.”
In the instant case, the plot wr abuts 9.15 wide existing road with 6.10 m pipe access
according to shape of plo/CTS (i.e part of CTS). Length of pipe access is 23.33 m which is
shown in the plan at pg. no. C-129. Architect has claimed the TDR in this case. After receipt
of the remarks from Hon'ble M.C., proposal of piped access less than 9m in other cases were not
processed for approvals with benefit of TDR.
In many cases the proposals were not processed for the want to formulate the policy on
how to deal with pipe access to the building. In this regards, various representations were
received from public representatives, Developers Association, Architects and PEATA. Copies
of representation/request letters are enclosed herewith for kind perusal. (page No. C-1 to C- 121)
and also in Bunch 1 kept below.
‘There are many cases where plot/s abut public street/road. However, width of abutment
to such public street/road is smaller than 9.00m. There are various cases where width of
abutment of two or more plots combinely provide access to buildings in the plots from public
street/ road.
Provisions with respect to requirement of access to any plot are very clear in DCPR’34
and are not dealt herewith. However, where plot abuts the public street/ road, but width of
abutment is less than 9.00m will be processed as per the policy herewith,
Accordingly, report was submitted to Hon MC vide pg. N-3/N-4 and CFO"s remarks
were received at pg. N-5/N-8. These were incorporated and report as at pg. N-9 was submitted
with correction if draft policy. During presentations on 13.07.2020, Hon, MC instructed to
review the draft policy by reducing the discretions. Accordingly, officers of Fire Dept and DP
discussed the issues related to fire requirements. Accordingly, changes in requirement of CFO
are included in the draft policy at pg. C-259/C- 263.Subsequently points were discussed on 27" July 2020 with JLMC (MCO), CFO,
EE(MCO) and undersigned. The draft policy is accordingly corrected and attached at pg. C-
281/C-289.
As per provisions of Reg. 30/Reg.32, FSI/TDR permitted is reckoned from the width of
the public street / road to which plot abuts. In these cases since plot is abutting public
\W’ | streettoad, FSI/TDR will be permitted based on the width of the public street/road to which the
plot abuts irrespective of width of abutment of the plot.
In view of above, Hon’ble M.C.’s consideration and approval is requested to ‘A’ above
and policy guidelines at pg. C- 281/C-289 for approval please.
On receipt of approval, policy will he circulated to all concerned including stake holders.
Submitted please.
dee! 26D itt
tage! {+020 xd Chithore)
> pgs 3 Lm
(LS. Chahdl) \
Hon’ble M.C.
Sir,
saad warren
ras si prefer
3:0 JUL 2020
qrrd 99, 9% 9B OF
am, 9%, 9 9Er
water
— . Gent
2)
Ch. engineer (! opel
&D. M.C. (Spl. Engg.)
ee?
(Chee Fine _Mi PAL CORPORATION OF
OFFICE OF THE CHIEF ENGINEER DEVELOPMENT PLAN
No, ChEng/DP/33\~— —/Gen.of 3\'07\rne
CIRCULAR
tial plot with smaller width of abutment to
Sub.: - Policy for allowing development of
public street/toad
‘There are many cases where plot/s abut public street/road. However, width of abutment to such
public street/road is smaller than 9,00m. There are various cases where width of abutment of two or
more plots combinedly provide access to buildings in the plots from public street/ road.
Representations were received to consider such cases for allowing development on such plots.
Provisions with respect to requirement of access to any plot are very clear in DCPR’34 and are
not dealt herewith. However, where plot/s abuts the public street/ road, but width of abutment of plot/s is
less than 9.00m will be processed as per the policy herewith.
A. For residential building having height less than 15m, Fire Safety requirements :—
Whenever plot/s partly abut public street/ road of width 6.00m or more and width of such
abutment and/or approach is min. 3.60m for entire length, as the width of approach of 3.60 m
width is not sufficient for fire appliances to reach up to the proposed building the fire
appliances will be parked on the main road / public street and further firefighting operations
will be carried out manually and with the help of inbuilt fire safety measures as recommended
below -
I. Approach to proposed building from public street / road shall not be less than 3.60 mtrs. wide.
2. The clear open space of the proposed building from plot boundary in alignment of approach shall be
misiimum 3.60 mtrs. (Sketch attached)
3. The said public street/road of minimum 6.00 mtrs. width shall be connected to another road having
width of minimum 6.00 mrs for easy manoeuvrability of fire appliances in case of an emergency.
Traffic department's / traffic consultant's certificate to that effect shall be submitted along with
proposal
4, The length of the approach from the main road to the point from where, the plot widens to full width
within plovs, shall not be more than 100 mtrs.
5. Down Comer of intemal diameter 10 cms. of G.l. “C” class pipe along with booster pump of 450
lpm capacity shall be provided in the duct or niches adjoining the staircase with hose reel at each
floor & on ground floor. Pressure reducing dises ot orifice shall be provided at lower level so as not
to exceed pressuré of 5.5 kgs/sq.cms. The riser shall be extended upto topmost floor/ terrace level &
shall be installed such that it will not reduce the flight width of the staircase.
6. A fire service inlet on the public street / main road side as well as on the external face of the building
directly fronting the courtyards shall be provided to connect the mobile pump of the fire service to
the rising mains of Down Comer.
7. Minimum two courtyard hydrants shall be provided within the confines of the site of the down
comer in accordance with LS. specification.
8, Smoke detectors shall be installed in Lift Machine room and Electric Meter room in accordance with
LS. specification,
9. The building shall be provided with manual fire alarm system with main control panel at ground
floor level & pill boxes & hooter at each floor level. The same shall be in accordance with 1S.
specification12,
B.
16.
|. One fire extinguisher of 06 kgs capacity each with BIS Certi
ation mark shall be provided in
electric meter room, lift machine room & on each floor.
Over Head Water Storage Tank for firefighting purpose at Terrace Level of minimum 5,000 litres
capacity is mandatory.
Stairease/s provided shall be having minimum width as per the provision of DCPR 2034.
Government approved Licensed Agency registered under The Maharashtra Fire prevention and Life
Safety Measures Act, 2006 for fire safety measures (referred as Licenced Agency) shall be
appointed. Schematic drawings pertaiting to fire prevention & fire safety measures shall be
submitted along with proposal by the Licenced Agency.
The self-declaration regarding the maintenance of all the fire-fighting measures provided in the
building from the Licensed Agency minimum upto 03 years shall be submitted by the
Owner/Occupier of the said building at the time of submission of building completion certificate in
online single window system through AutoDCR and same shall be renewed time to time,
Certification from Licenced Agency regarding provision of all the fire-fighting, measures in the
building are from the approved Licensed Agency registered under The Maharashtra Fire prevention
and Life Safety Measures Act, 2006 shall be submitted at the time of submission of building
completion certificate as per Common Completion Application process as per EODB including joint
site visit by concerned departments and issuance of completion will be followed.
Certification from Licenced Agency regarding provision of all the fire-fighting measures in the
building are from the Licensed Agency registered under The Maharashtra Fire prevention and Life
Safety Measures Act, 2006 shall be submitted at the time of submission of building completion
certificate through single window system through AutoDCR
Certification from Licenced Agency regarding the maintenance of all the fire-fighting measures
provided in the building initially for period of minimum 3 years, shall be submitted at the time of
submission of building completion certificate through single window system through AutoDCR.
Undertaking regarding the maintenance & to keep the entire fire service inlet as well as all other
firefighting installations / equipment in good working condition all the time shall be submitted by
the Owner/Occupier of the building’as per Section 3 of The Maharashtra Fire Prevention & Life
Safety Measures Act-2006 and Form B shall be submitted in the month of January & July to Fire
Brigade Department as per the provisions of Sec 3 of Maharashtra Fire Prevention & Life Safety
Measures Act.
Res al having height 1S m and above up to 32m
Whenever plot/s partly abut public street/ road of width 6.00m or more and width of such
abutment and/or approach is min. 3.60m for entire length, as the width of approach of 3.60 m
width is not sufficient for fire appliances to reach to the proposed building the fire appliances
will be parked on the main road / public street and further firefighting operations will be
carried out manually and with the help of inbuilt fire safety measures as recommended below -
Approach to proposed building from public street / road shall not be less than 3.60 mtrs, wide.
‘The clear open space of the proposed building from plot boundary in alignment of approach shall be
‘minimum 3.60 mtrs, (Sketch attached)
The said public street/road of minimum 6.00 mtrs. width shall be connected to another road having
width of minimum 6.00 mtrs for easy manoeuvrability of fire appliances in case of an emergency.
‘Traffic department's / traffic consultant’s certificate to that effect shall be submitted along with
proposal.
The length of the approach from the main road to the point from which plot widens to full width
within plows shall not be more than 100 mtrs.20.
. Fire Resistant Door ha
Minimum two lifts will be provided in such buildings, out of which one will be fireman evacuation
Jift with the requirement as per MGC/A/S80I dated 25.01.2018 and as per illustrative sketches
attached, Fireman evacuation lift can be used as passenger lift unless in case of emergency.
Alternate supply shall be provided to Fireman Evacuation Lif, fire lift, fire pumps, sprinkler pump
& jockey pump.
Wet riser-cum-down comer of internal diameter 10 ems. of G.l. “C” class pipe along with booster
pump (900 Ipm capacity) & fire pump (1400 Ipm capacity) & sprinkler pump shall be provided in
the duct or niches adjoining the staircase with single hydrant outlet and hose reel at each floor & on
ground floor. Pressure reducing dises or orifice shall be provided at lower level so as not to exceed
pressure of 5.5 kgs/sq.cms. The riser shall be extended upto topmost floor/ terrace level & shall be
installed such that it will not reduce the flight width of the staircase,
A fire service inlet on the public street / main road side as well as on the external face of the building,
directly fronting the courtyards shall be provided to connect the mobile pump of the fire service to
the rising mains of Wet riser cum down comer system as well as sprinkler system
Automatic Sprinkler System shall be provided in the entire building including lift lobby, common
corridor, each habitable room in each flat and other prominent areas.
Minimum two courtyard hydrants shall be provided within the confines of the
accordance with LS. specification.
‘Smoke detectors shall be installed in Lift Machine room and Electric Meter room in accordance with
LS. specification,
The building shall be provided with manual fire alarm system with main control panel at ground
floor level & pill boxes & hooter at each floor level. The same shall be in accordance with LS.
specification,
One fire extinguisher of 06 kgs capacity each with BIS Certification mark shall be provided in
electric meter room, lift machine room & on each floor.
of the wet riser in
|. For firefighting purpose Underground water storage tank of minimum 50,000 litres capacity &
Overhead water storage tank of minimum 20,000 litres capacity is mandatory.
. Staircase’s provided shall be of enclosed type having minimum width as per the provision of DCPR
2034 (Reg, 37, Table No. 16).
ing Olhour fire 1
ing shall be provided at staircase, main entrance and
kitchen of each flat,
Government approved Licensed Agency registered under The Maharashtra’ Fire prevention and Life
Safety Measures Act, 2006 for fire safety measures (referred as Licenced Agency) shall be
appointed. Schematic drawings pertaining to fire prevention & fire safety measures shall be
submitted along with proposal by the Licenced Agency.
Certification from Licenced Agency regarding provision of all the fire-fighting measures in the
building are from the approved Licensed Agency registered under The Maharashtra Fire prevention
and Life Safety Measures Act, 2006 shall be submitted at the time of submission of building.
completion certificate as per Common Completion Application process as per EODB including joint
site visit by concerned departments and issuance of completion will be followed.
. The self-declaration regarding the maintenance of all the fire-fighting measures provided in the
building from the Licensed Agency minimum upto 03 years shall be submitted by the
Owner/Occupier of the said building at the time of submission of building completion certificate in
online single window system through AutoDCR and same shall be renewed time to time
Certification from Licenced Agency regarding provision of all the fire-fighting measures in the
building are from the Licensed Ageney registered under The Maharashtra Fire prevention and Life
Safety Measures Act, 2006 shall be submitted at the time of submission of building completion
certificate through single window system through AutoDC!21. Certification from Licenced Agency regarding the maintenance of all the fire-fighting measures
provided in the building initially for period of minimum 3 years, shall be submitted at the time of
submission of building completion certificate through single window system through AutoDCR.
Undertaking regarding the maintenance & to keep the entire fire service inlet as well as all other
firefighting installations / equipment in good working condition all the time shall be submitted by
the Owner/Occupier of the building as per Section 3 of The Maharashtra Fire Prevention & Life
Safety Measures Act-2006 and Form B shall be submitted in the month of January & July to Fire
Brigade Department as per the provisions of Sec 3 of Maharashtra Fire Prevention & Life Safety
Measures Act.
22,
NOTE:
(@)The proposals as mentioned above for the residential buildings upto height of 32 mtrs.
with smaller width of abutment to public street / road as well as for any open space
concession for the residential building below 32 mtrs. Due to hardship shall be strictly
adhered to the fire safety measures at (a) 01 10 18 & (b) 01 to 22 above respectively & the
compliance of the same shall be obtained from Licensed Agency as per the provisions of
Maharashtra Fire Prevention & Life Safety Measures Act, 2006.
(0) No separate NOC from CFO needs to be obtained even if proposal involves relaxations
due to hardships in open space other than open space insisted in the policy,
(©) The process to obtain completion certificate for compliance of fire will be as per
EODB.
C. Residential building having height more than 32 m—
Whenever plovs partly abut public street/ road of width 9.00m or more and width of such abutment
and/or approach is min. 4.50m for entire length , as per reg. 12(2) read with Reg. 2 (IV) (75) of
DCPR'34, all such proposals will be scrutinized by Fire Department with respect to access, staging area
ete, & NOC/remarks regarding the same will be offered with justification by Fire Department, wherever
required, approval of Hon. M.C shall be obtained.
Notes :
1 The word abutment and/or access to plovs specified in paragraphs above, shall mean and
include any narrow access which is a part / portion of same plot or any narrow access which
includes a portion of other plot / plots or common access which is commonly used with any
other adjoining plot / plots for common access. The width of abutment / access shall be
considered as total width of abutment / access of the same plot as well as adjoining plot which
is jointly used as common access by the plot holders.
2 List of Licenced Agency can be obtained from htps:/wwm.mahafireservice.gov.in by
accessing Tab List of License Agency.
3. Whete NOC is already issued by CFO before the date of this circular, building permissions shall
be processed as per these NOCs.
Attached : Illustrative Sketches | to TV
hat” Me jr.
(Me, thitore) (Prabhat RAbaefdale) (I. S. Chahal)
‘Ch. Eng. (I.P.) & DMC (SE) CFO/DMCODM) Municipal CommissionercH ues
ILLUSTRATIVE. SKETCH—|
BELOW 32,00M
AP 600M. NOE ROD OECD 10 MOTE 600 1 WOE FOND
wo
DY
CH(ENG.(DP) & DMC (SE)