100% found this document useful (1 vote)
240 views18 pages

Samsung - Cargo Handling - Cooling Down Tables - 2002

This document provides tables to calculate the quantity of coolant needed to cool down a 138,000 cubic meter LNG carrier over 10 hours. It lists assumptions about the cooling down time, total LNG requirements, cargo tank volume and area, insulation thickness, and individual sprayer flowrate. It also shows the expected variation in primary barrier temperature over time, modeled by a 6th order polynomial function, going from 30 degrees Celsius to -100 degrees Celsius over the 10 hour period.

Uploaded by

seawolf50
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
240 views18 pages

Samsung - Cargo Handling - Cooling Down Tables - 2002

This document provides tables to calculate the quantity of coolant needed to cool down a 138,000 cubic meter LNG carrier over 10 hours. It lists assumptions about the cooling down time, total LNG requirements, cargo tank volume and area, insulation thickness, and individual sprayer flowrate. It also shows the expected variation in primary barrier temperature over time, modeled by a 6th order polynomial function, going from 30 degrees Celsius to -100 degrees Celsius over the 10 hour period.

Uploaded by

seawolf50
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

N220 - TANK ANA - 1.6.

GAZTRANSPORT & TECHNIGAZ

Project N 220

CARGO HANDLING STUDIES


SECTION 1 : TECHNICAL ANALYSIS
Section 1.6 : Special Studies

SAMSUNG HEAVY INDUSTRIES

Hull n° 1428
138000 m3LNG CARRIER - BG

Technical Analysis N°: 1.6.5


COOLING-DOWN TABLES
COOLANT QUANTITY

! SHI, Geole Shipyard


'-
I Dra"1ling/Document Submission

0 f'J,r Appro~Jal
~ for Reference

\
10_-
I
r-
I P.cfcr to
I
our letter no. ..
!- dated--
l --

1 03/10/02 Final Issue


0 04/06/02 First issue
Rev. Date Description of revision y ec e epa . roJec
Reference for revision visa visa visa visa

"",."',
; SAMSUNG N220 TANK ANA 1.6.5
.c~- " 3"
~"~:~,, C?:;,,;.,,~,=~_. 138 000 m LNG Carrier Project . .
';;C",.-,,:,:::-:,--"~,,-~--
'. " COOLING DOWN-TABLES RevIsion: 1

GAZTRANSPORT& TECHNIGAZ COOLANT QUANTITY 03/10/2002

N 220 Cargo Handling Design Studies Page: 2/19


TECHNICAL ANALYSIS N° : 1.6.5

REVISION SHEET

REV. 0 1 REV. REV REV.


PAGE PAGE PAGE PAGE
1 X X 26 51 76
2 X X 27 52 77
3 X X 28 53 78
4 X X 29 54 79
5 X X 30 55 80
6 X X 31 56 81
7 X X 32 57 82
8 X X 33 58 83
9 X X 34 59 84
10 X X 35 60 85
11 X X 36 61 86
12 X X 37 62 87
13 X X 38 63 88
14 X X 39 64 89
15 X X 40 65 90
16 X X 41 66 91
17 X X 42 67 92
18 X X 43 68 93
19 X X 44 69 94
20 45 70 595
21 46 71 96
22 47 72 97
23 48 73 98
24 49 74 99
25 50 75 100

1 03/10/02 Final Issue Spray nozzle quantity


0 04/06/02 First Issue
Rev. Date Description of revision Description of revision
Reference for revision

"This document is the property of GAZTRANSPORT & TECHNIGAZ. It cannot be used, published or communicated without its express authorisation
@ GAZTRANSPORT & TECHNIGAZ, 2001 -
. article L.122 - 4 of the Intellectual Property Code article 5 of Bern Convention"

c.>~ !
GAZTRANSPORT
& TECHNIGAZ Date: 03/10/2002 Rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

Sheet 0 of 15
-
1 GENERALCOOLING-DOWNASSUMPTIONS

. Cooling-Down Time 10 -
hours to ensure 130 °C on Primary barrier

..
. Total lNG Requirements
LNG Density
LNG Vapor. Latent Heat
800
470,0
499,1
m3
kg/m3
kJ/kg for forced vaporisation process
. LNG 1 Forced Gas HHV 53034 kJ/kg
50,269 MBTU/kg
. Cargo Tanks Volume 138 570 m3 (100 %)
. Overall Cargo Tanks Area 24555 m2 on Primary Barrier
. Insulation Thickness 0,270 m and Mark III "E" system
. OverallCargoTanks 195290MJfor stabilisedgradientacrossinsulation
wall
Heat Energy Capacity (compartments temperature corresponding to IMO
external conditions; and - 162 °C inside cargo tanks)
. Individual Sprayer 0,966 m3/hour when fed with fresh water
Flowrate at 2.0 bar g for EMANI "Whirljet" 3/4 BD 25 type

2 - PRIMARY BARRIER TEMPERATURE VARIATION VS. TIME

.According to the typical plot which is an average amongst numerous possible


observed on previous ships), then modelled by a 6th order polynomial function t(T)
curves (as

Cooling-Down Time Primary Barrier


Mean Temperature

0 hour 30 °C

1 hour 12 °C

2 hours -20 °C

3 hours -47 °C

4 hours -67 °C

5 hours -85 °C

6 hours -100 °C

7 hours -113 °C

8 hours -118 °C

9 hours -125 °C

10 hours -130 °C

""-- ,
°
GAZTRANSPORT
& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

Sheet 1 of 5

CARGO TANK No.1 COOLING-DOWN: DETAILED TABLE (1°C INTERVAL)

..
. CargoTankVolume
Cargo Tank Area
Number of Sprayers
24587 m3 (100%)
4885 m2 (on primary barrier)
30
Spraying Rate 16,50 m3/hour
. Operation Count-Down from 10 hours

Mean Temperature LNG Quantity Time


of All Sensors Required Count-Down
[OC] [m3] [hours]

30 164,2 9,95
29 162,8 9,87
28 161,6 9,79
27 160,4 9,72
26 159,3 9,65
25 158,2 9,59
24 157,1 9,52
23 156,2 9,46
22 155,2 9,41
21 154,3 9,35
20 153,5 9,30
19 152,7 9,25
18 151,9 9,21
17 151,2 9,16
16 150,4 9,12
15 149,8 9,08
14 149,1 9,04
13 148,5 9,00
12 147,9 8,96
11 147,3 8,93
10 146,7 8,89
9 146,2 8,86
8 145,7 8,83
7 145,2 8,80
6 144,7 8,77
5 144,2 8,74
4 143,7 8,71
3 143,2 8,68
2 142,8 8,65
1 142,3 8,63
0 141,9 8,60
GAZTRANSPORT& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAM SUNG LNG CARRIER -138,570 m3

CARGO TANK No.1 COOLING-DOWN (Cont'd) Sheet 2 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
rOC] [m3] [hours]

-1 141,4 8,57
-2 141,0 8,54
-3 140,6 8,52
-4 140,1 8,49
-5 139,7 8,47
-6 139,2 8,44
-7 138,8 8,41
-8 138,4 8,39
-9 137,9 8,36
-10 137,5 8,33
-11 137,0 8,30
-12 136,6 8,28
-13 136,1 8,25
-14 135,6 8,22
-15 135,2 8,19
-16 134,7 8,16
-17 134,2 8,13
-18 133,7 8,10
-19 133,2 8,07
-20 132,7 8,04
-21 132,2 8,01
-22 131,7 7,98
-23 131,1 7,95
-24 130,6 7,91
-25 130,0 7,88
-26 129,5 7,85
-27 128,9 7,81
-28 128,3 7,78
-29 127,7 7,74
-30 127,1 7,71
-31 126,5 7,67
-32 125,9 7,63
-33 125,3 7,59
-34 124,7 7,56
-35 124,0 7,52
-36 123,4 7,48
-37 122,7 7,44
-38 122,1 7,40
-39 121,4 7,36
GAZTRANSPORT & TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No.1 COOLING-DOWN (Cont'd) Sheet 3 of 5

Mean Temperature lNG Quantity Time


of All Sensors Required
roC] [m3] [hours]

-40 120,7 7,32


-41 120,0 7,27
-42 119,3 7,23
-43 118,6 7,19
-44 117,9 7,15
-45 117,2 7,10
-46 116,5 7,06
-47 115,7 7,01
-48 115,0 6,97
-49 114,2 6,92
-50 113,5 6,88
-51 112,7 6,83
-52 112,0 6,79
-53 111,2 6,74
-54 110,4 6,69
-55 109,6 6,64
-56 108,9 6,60
-57 108,1 6,55
-58 107,3 6,50
-59 106,5 6,45
-60 105,7 6,40
-61 104,9 6,36
-62 104,1 6,31
-63 103,2 6,26
-64 102,4 6,21
-65 101,6 6,16
-66 100,8 6,11
-67 99,9 6,06
-68 99,1 6,01
-69 98,2 5,95
-70 97,4 5,90
-71 96,5 5,85
-72 95,7 5,80
-73 94,8 5,75
-74 94,0 5,69
-75 93,1 5,64
-76 92,2 5,59
-77 91,3 5,53
-78 90,4 5,48

I
GAZTRANSPORT& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No.1 Sheet 4 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
[OC] [m3] [hours]

-79 89,5 5,42


-80 88,6 5,37
-81 87,7 5,31
-82 86,7 5,26
-83 85,8 5,20
-84 84,8 5,14
-85 83,8 5,08
-86 82,9 5,02
-87 81,9 4,96
-88 80,8 4,90
-89 79,8 4,84
-90 78,8 4,77
-91 77,7 4,71
-92 76,6 4,64
-93 75,5 4,58
-94 74,4 4,51
-95 73,2 4,44
-96 72,0 4,37
-97 70,8 4,29
-98 69,6 4,22
-99 68,3 4,14
-100 67,0 4,06
-101 65,7 3,98
-102 64,3 3,90
-103 62,9 3,81
-104 61,5 3,73
-105 60,0 3,63
-106 58,4 3,54
-107 56,8 3,45
-108 55,2 3,35
-109 53,5 3,24
-110 51,8 3,14
-111 50,0 3,03
-112 48,1 2,91
-113 46,1 2,80
-114 44,1 2,68
-115 42,1 2,55
-116 39,9 2,42
-117 37,7 2,28

! ..
GAZTRANSPORT& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No.1 COOLING.DOWN (Confd) Sheet 5 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
roC) [m3] [hours]

-118 3S,4 2,14


-119 33,0 2,00
-120 30,S 1,85
-121 27,9 1,69
-122 2S,2 1,S3
-123 22,S 1,36
-124 19,6 1,19
-125 16,6 1,01
. -126 13,S 0,82
-127 10,2 0,62
-128 6,9 0,42
-129 3,4 0,21
-130 0,0 0,00
GAZTRANSPORT
& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAM SUNG LNG CARRIER - 138,570 m3

Sheet 1 of 5

CARGO TANKS No.2 1 3 COOLING-DOWN: DETAILED TABLE (1°C INTERVAL)

. Cargo Tank Volume 39454 m3 (100 %)


. Cargo Tank Area 6738 m2 (on primary barrier)
. Number of Sprayers 40
. Spraying Rate 22,00 m3/hour
. Operation
Count-Down
from 10hours

Mean Temperature LNG Quantity Time


of All Sensors Required Count-Down
rC] [m3] [hours]

30 218,9 9,95
29 217,1 9,87
28 215,5 9,79
27 213,9 9,72
26 212,3 9,65
25 210,9 9,59
24 209,5 9,52
23 208,2 9,46
22 207,0 9,41
21 205,8 9,35
20 204,6 9,30
19 203,6 9,25
18 202,5 9,21
17 201,5 9,16
16 200,6 9,12
15 199,7 9,08
14 198,8 9,04
13 198,0 9,00
12 197,2 8,96
11 196,4 8,93
10 195,6 8,89
9 194,9 8,86
8 194,2 8,83
7 193,5 8,80
6 192,9 8,77
5 192,2 8,74
4 191,6 8,71
3 191,0 8,68
2 190,4 8,65
1 189,8 8,63
0 189,2 8,60

~ ~$j;;
GAZTRANSPORT & TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANKS No. 2/3 COOLING-DOWN (Cont'd) Sheet 2 of 5


--~~

Mean Temperature LNG Quantity Time


of All Sensors Required
rC] [m3] [hours]

-1 188,6 8,57
-2 188,0 8,54
-3 187,4 8,52
-4 186,8 8,49
-5 186,2 8,47
-6 185,7 8,44
-7 185,1 8,41
-8 184,5 8,39
-9 183,9 8,36
-10 183,3 8,33
-11 182,7 8,30
-12 182,1 8,28
-13 181,5 8,25
-14 180,9 8,22
-15 180,2 8,19
-16 179,6 8,16
-17 178,9 8,13
-18 178,3 8,10
-19 177,6 8,07
-20 176,9 8,04
-21 176,3 8,01
-22 175,6 7,98
-23 174,8 7,95
-24 174,1 7,91
-25 173,4 7,88
-26 172,6 7,85
-27 171,9 7,81
-28 171,1 7,78
-29 170,3 7,74
-30 169,5 7,71
-31 168,7 7,67
-32 167,9 7,63
-33 167,1 7,59
-34 166,2 7,56
-35 165,4 7,52
-36 164,5 7,48
-37 163,6 7,44
-38 162,7 7,40
-39 161,8 7,36
GAZTRANSPORT & TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAM SUNG LNG CARRIER -138,570 m3

CARGO TANKS No. 2/3 COOLING-DOWN (Cont'd) Sheet 3 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
rC] [m3] [hours]

-40 160,9 7,32


-41 160,0 7,27
-42 159,1 7,23
-43 158,1 7,19
-44 157,2 7,15
-45 156,2 7,10
-46 155,3 7,06
-47 154,3 7,01
-48 153,3 6,97
-49 152,3 6,92
-50 151,3 6,88
-51 150,3 6,83
-52 149,3 6,79
-53 148,3 6,74
-54 147,2 6,69
-55 146,2 6,64
-56 145,1 6,60
-57 144,1 6,55
-58 143,0 6,50
-59 142,0 6,45
-60 140,9 6,40
-61 139,8 6,36
-62 138,7 6,31
-63 137,7 6,26
-64 136,6 6,21
-65 135,5 6,16
-66 134,4 6,11
-67 133,2 6,06
-68 132,1 6,01
-69 131,0 5,95
-70 129,9 5,90
-71 128,7 5,85
-72 127,6 5,80
-73 126,4 5,75
-74 125,3 5,69
-75 124,1 5,64
-76 122,9 5,59
-77 121,7 5,53
-78 120,5 5,48

l
GAZTRANSPORT& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANKS No. 2/3 COOLING-DOWN (Cont'd) Sheet 4 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
roC] [m3] [hours]

-79 119,3 5,42


-80 118,1 5,37
-81 116,9 5,31
-82 115,6 5,26
-83 114,4 5,20
-84 113,1 5,14
-85 111,8 5,08
-86 110,5 5,02
-87 109,1 4,96
-88 107,8 4,90
-89 106,4 4,84
-90 105,0 4,77
-91 103,6 4,71
-92 102,2 4,64
-93 100,7 4,58
-94 99,2 4,51
-95 97,6 4,44
-96 96,1 4,37
-97 94,5 4,29
-98 92,8 4,22
-99 91,1 4,14
-100 89,4 4,06
-101 87,6 3,98
-102 85,8 3,90
-103 83,9 3,81
-104 82,0 3,73
-105 80,0 3,63
-106 77,9 3,54
-107 75,8 3,45
-108 73,6 3,35
-109 71,3 3,24
-110 69,0 3,14
-111 66,6 3,03
-112 64,1 2,91
-113 61,5 2,80
-114 58,9 2,68
-115 56,1 2,55
-116 53,2 2,42
-117 50,3 2,28

I
I
GAZTRANSPORT& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANKS No.2 / 3 COOLING-DOWN (Cont'd) Sheet 5 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
roC] [m3] [hours]

-118 47,2 2,14


-119 44,0 2,00
-120 40,7 1,85
-121 37,2 1,69
-122 33,7 1,53
-123 30,0 1,36
-124 26,1 1,19
-125 22,1 1,01
-126 18,0 0,82
-127 13,7 0,62
-128 9,2 0,42
-129 4,5 0,21
-130 0,0 0,00
GAZTRANSPORT
& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

Sheet 1 of 5

CARGO TANK No.4 COOLING-DOWN: DETAILED TABLE (1°C INTERVAL)

0 Cargo Tank Volume 35075 m3 (100 %)


0 Cargo Tank Area 6 194 m2 (on primary barrier)
0 Number of Sprayers 36
0 Spraying Rate 19,80 m3/hour
0 Operation Count-Down from 10 hours

Mean Temperature LNG Quantity Time


of All Sensors Required Count-Down
laC] [m3] [hours]

30 197,0 9,95
29 195,4 9,87
28 193,9 9,79
27 192,5 9,72
26 191,1 9,65
25 189,8 9,59
24 188,6 9,52
23 187,4 9,46
22 186,3 9,41
21 185,2 9,35
20 184,2 9,30
19 183,2 9,25
18 182,3 9,21
17 181,4 9,16
16 180,5 9,12
15 179,7 9,08
14 178,9 9,04
13 178,2 9,00
12 177,5 8,96
11 176,8 8,93
10 176,1 8,89
9 175,4 8,86
8 174,8 8,83
7 174,2 8,80
6 173,6 8,77
5 173,0 8,74
4 172,4 8,71
3 171,9 8,68
2 171,3 8,65
1 170,8 8,63
0 170,2 8,60

-~~~
GAZTRANSPORT& TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No: 4 COOUNG-DOWN (Cont'd) Sheet 2 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
lC] [m3] [hours]

-1 169,7 8,57
-2 169,2 8,54
-3 168,7 8,52
-4 168,1 8,49
-5 167,6 8,47
-6 167,1 8,44
-7 166,6 8,41
-8 166,0 8,39
-9 165,5 8,36
-10 165,0 8,33
-11 164,4 8,30
-12 163,9 8,28
-13 163,3 8,25
-14 162,8 8,22
-15 162,2 8,19
-16 161,6 8,16
-17 161,1 8,13
-18 160,5 8,10
-19 159,9 8,07
-20 159,3 8,04
-21 158,6 8,01
-22 158,0 7,98
-23 157,4 7,95
-24 156,7 7,91
-25 156,0 7,88
-26 155,4 7,85
-27 154,7 7,81
-28 154,0 7,78
-29 153,3 7,74
-30 152,6 7,71
-31 151,9 7,67
-32 151,1 7,63
-33 150,4 7,59
-34 149,6 7,56
-35 148,8 7,52
-36 148,1 7,48
-37 147,3 7,44
-38 146,5 7,40
-39 145,7 7,36
GAZTRANSPORT & TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No.4 COOLING-DOWN (Cont'd) Sheet 3 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
roC] [m3] [hours]

-40 144,8 7,32


-41 144,0 7,27
-42 143,2 7,23
-43 142,3 7,19
-44 141,5 7,15
-45 140,6 7,10
-46 139,7 7,06
-47 138,9 7,01
-48 138,0 6,97
-49 137,1 6,92
-50 136,2 6,88
-51 135,3 6,83
-52 134,4 6,79
-53 133,4 6,74
-54 132,5 6,69
-55 131,6 6,64
-56 130,6 6,60
-57 129,7 6,55
-58 128,7 6,50
-59 127,8 6,45
-60 126,8 6,40
-61 125,8 6,36
-62 124,9 6,31
-63 123,9 6,26
-64 122,9 6,21
-65 121,9 6,16
-66 120,9 6,11
-67 119,9 6,06
-68 118,9 6,01
-69 117,9 5,95
-70 116,9 5,90
-71 115,9 5,85
-72 114,8 5,80
-73 113,8 5,75
-74 112,7 5,69
-75 111,7 5,64
-76 110,6 5,59
-77 109,6 5,53
-78 108,5 5,48

,.~~~l..,
GAZTRANSPORT & TECHNIGAZ Date: 3/10/02 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No.4 COOLING-DOWN (Cont'd) Sheet 4 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
[OC] [m3] [hours]

-79 107,4 5,42


-80 106,3 5,37
-81 105,2 5,31
-82 104,1 5,26
-83 102,9 5,20
-84 101,8 5,14
-85 100,6 5,08
-86 99,4 5,02
-87 98,2 4,96
-88 97,0 4,90
-89 95,8 4,84
-90 94,5 4,77
-91 93,2 4,71
-92 91,9 4,64
-93 90,6 4,58
-94 89,3 4,51
-95 87,9 4,44
-96 86,5 4,37
-97 85,0 4,29
-98 83,5 4,22
-99 82,0 4,14
-100 80,4 4,06
-101 78,8 3,98
-102 77,2 3,90
-103 75,5 3,81
-104 73,8 3,73
-105 72,0 3,63
-106 70,1 3,54
-107 68,2 3,45
-108 66,2 3,35
-109 64,2 3,24
-110 62,1 3,14
-111 59,9 3,03
-112 57,7 2,91
-113 55,4 2,80
-114 53,0 2,68
-115 50,5 2,55
-116 47,9 2,42
-117 45,2 2,28

I
11 I 'I I I ..
GAZTRANSPORT & TECHNIGAZ Date: 3/10102 rev: 1

DETAILED COOLING-DOWN TABLE: SAMSUNG LNG CARRIER -138,570 m3

CARGO TANK No. 4 COOLING-DOWN (Cont'd) Sheet 5 of 5

Mean Temperature LNG Quantity Time


of All Sensors Required
rC] [m3] [hours]

-118 42,5 2,14


-119 39,6 2,00
-120 36,6 1,85
-121 33,5 1,69
-122 30,3 1,53
-123 27,0 1,36
-124 23,5 1,19
-125 19,9 1,01
-126 16,2 0,82
-127 12,3 0,62
-128 8,3 0,42
-129 4,1 0,21
-130 0,0 0,00

.\