1. PTS: Section The VT Burden shall be 100VA as per PTS, which shall
III, Clause be complied. Manufacturer has complied as per the data
2.A.c.4 schedule for 32-TMSS-02, Rev.2, Clause 4.13 and the
same shall be complied in all applicable documents.
2. General It shall be noted that the control cables and their cross
section used for the connection between the GIS and LCC
shall be submitted during design stage for further review
and approval.
3. PTS: Confirm to supply the special tools as per PTS Appendix-
Appendix- XIII.
XIII
4. General It shall be noted that the earthing arrangement for GIS
shall be submitted during design stage for further review
and approval.
Page 2 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
6. General It shall be noted that, the division of work (Chapter T5)
shall be mutually agreed between the BSP Contractor and
the vendor/manufacturer and any deviations shall be
notified to SEC separately before awarding the contract.
A. Compliance on Manufacturer’s responsibility statement for ELK-3, 420kV GIS , HGIS & 420kV GIL
Page 3 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Compliance Statement to 01-TMSS-01 Rev. 3
1. - Compliance for Clause 11.3 is missing. Also the signature
from Contractor’s responsible and stamp of manufacturer
is required on the document. Revised document shall be
submitted complying with the above.
Page 5 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
4.1.23 with proper justification.
11. 32-TMSS-05, The Bidder’s reply is not associated with the compliance
Rev.1, Clause statement for 01-TMSS-01, Rev.03. The revised
4.3.4 response shall be submitted for the particular clause.
Compliance Statement to 32-TMSS-02 Rev. 2
12. 32-TMSS-02, We noted the Bidder’s clarification for the mentioned
Rev.2, Clause clause as “The GIS is equipped with self-closing non-
4.5.9 return valves. However, while taking the meter off the
valve an insignificant small amount of gas in the
Density meter will be lost“. We need the confirmation
from Manufacturer that the above clarification about the
gas lost already notified to SEC during pre-qualification
and accepted.
13. 32-TMSS-02, It shall be noted that the Quantity & Location of 380kV
Rev.2, Clause GIS Surge arrestors shall be decided as per
4.18.1 EMTDC/insulation coordination study during design
stage. EMTDC/insulation coordination study during
design stage. If such calculations/studies are not under
manufacturer’s scope, then contractor should comply
accordingly.
14. 32-TMSS-02, It shall be clarified with the approval reference for sub-
Rev.2, Clause suppliers for the components and attach the relevant
4.23.5 approved list of sub suppliers.
15. 32-TMSS-02, Submit the type test report for our references.
Rev.2, Clause
4.23.5
C. Compliance to Data Schedule
Page 6 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Compliance Statement to Data Schedule under 32-TMSS-02 Rev. 2 - For New Diameters
1. 32-TMSS-02, Column ‘A’ shall not be filled by the bidder as it is
Rev.2, Data designated for NGSA’s specified data/parameter.
Schedule, Revised data schedule shall be submitted. Moreover,
Page: 35 of each sheet of the same data schedule shall be signed &
62 sealed by both Manufacturer and the contractor.
Page 7 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Manufacturer & Contractor.
6. 32-TMSS-02, As mentioned in Data Schedule Page 62 of 62, other
Rev.2, Data particulars shall be filled in column ‘C’ by the bidder
Schedule such as the technical reference with clause number for
each data given by the bidder under clause 4.2, 4.4, 4.5,
4.9, 4.10. i.e. Clause Reference from technical standards
for each given data shall be provided.
7. 32-TMSS-02, Bidders has mentioned “No” under Special tools
Rev.2, Data requirements and also mentioned as “Project Specific”.
Schedule Need clarification on the above.
clause 6.0
Page 9 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Compliance Statement to 53-TMSS-01, Rev. 2
3. - Bidder’s compliance to 53-TMSS-01, Rev.2 is noted with
no deviations.
Compliance Statement to 53-TMSS-03, Rev. 0
4. - Bidder’s compliance to 53-TMSS-03, Rev.0 is noted with
no deviations.
Compliance Statement to 54-TMSS-01, Rev. 2
5. - Bidder’s compliance to 54-TMSS-01, Rev.2 is noted with
no deviations.
C. Compliance to Data Schedule
Page 10 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
clause 4.3.1 voltage, shall be mentioned along with the relevant
clause numbers from the referred international standards
or with the particular reference from where the
manufacturer chosen such values and those references
with the particular clause number shall be mentioned
under column ‘C’.
5. 53-TMSS-01, The mentioned values for Guaranteed No-Load & Load
Rev.2, Data Losses shall be within the acceptable limit and the
Schedule supporting document shall be provided to prove the
clause 4.3.4 mentioned value of losses. The attached calculation
under Annexure-IX is made for Al Kahafah station and
separate calculation shall be submitted for Ar Rass
expansion project.
6. 53-TMSS-01, The reference from technical standards shall be provided
Rev.2, Data under column ‘C’ for the given values for Maximum
Schedule Symmetrical & Asymmetrical short circuit current for
clause 4.3.6 which windings are designed to thermally withstand.
7. 53-TMSS-01, It shall be confirmed that the accessories such as tap
Rev.2, Data changer, motor driving units, Oil/Gas relay for OLTC,
Schedule Buccholz Relay, Pressure relief Device, WTI, OTI and
clause 4.5 HV, LV, TV Bushings shall be from the SEC/NG
approved manufacturer.
8. 53-TMSS-01, The reference from technical standards with particular
Rev.2, Data clause number shall be provided under column ‘C’ for
Schedule the given values for BIL, Power Frequency withstand
clause 4.10 voltage, Creepage distance and cantilever strength for
each bushing. LV & TV bushing type designation shall
be cross verified whether it is oil to oil or oil to XLPE
Page 11 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
and confirm accordingly.
9. 53-TMSS-01, The manufacturer details for cooling Fans shall be
Rev.2, Data provided and also it shall be from NG/SEC approved
Schedule manufacturers.
clause 4.14
Compliance Statement to Data Schedule under 54-TMSS-01 Rev. 2
10. - Each sheet of the data schedule shall be signed &
stamped by the manufacturer and contractor.
11. - Dissolved gases in the oil shall be interpreted as per IEC
60599. Test Report for Oil properties shall be submitted
for batch of oil to be filled complying to Table 2 of IEC
60296 during project execution stage.
Page 13 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Compliance Statement to 53-TMSS-03, Rev. 0
4. - Bidder’s compliance to 53-TMSS-03, Rev.0 is noted with Noted.
no deviations.
Compliance Statement to 54-TMSS-01, Rev. 2
5. - Bidder’s compliance to 54-TMSS-01, Rev.2 is noted with Noted.
no deviations.
C. Compliance to Data Schedule
Compliance Statement to Data Schedule under 53-TMSS-01 Rev. 2
1. - Each sheet of the data schedule shall also be signed & Noted. Revised data
sealed by Manufacturer. schedule will be submitted at
detail design stage.
2. 53-TMSS-01, The Design Ambient temperature shall be a single value Noted. Revised data
Rev.2, Data i.e. 55 deg C (Max) and other values for yearly shall be schedule will be submitted at
Schedule removed as it is not going to add any values for design or detail design stage.
clause 4.1 it shall be clarified why it has been added under Design
Ambient temperature.
3. 53-TMSS-01, It is mentioned that the temperature rise values shall be Please be noted that
Rev.2, Data as per 01-TMSS-01 and it must be clarified with the maximum ambient
Schedule particular clause reference where it is matching with. temperature is 55℃ for
clause 4.3.1 outdoor equipment. So
temperature rise limit shall
be deducted based on IEC
60076-02 table.2.
4. 53-TMSS-01, Impedance voltage at each tap position, Maximum Noted. Revised data
Rev.2, Data Design Flux Density, Current density at rated output, No schedule will be submitted at
Schedule Load Current, BIL, BSL, Power Frequency withstand detail design stage.
clause 4.3.1 voltage, shall be mentioned along with the relevant
Page 14 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
clause numbers from the referred international standards
or with the particular reference from where the
manufacturer chosen such values and those references
with the particular clause number shall be mentioned
under column ‘C’.
5. 53-TMSS-01, It shall be confirmed that the mentioned values for Please clarify the acceptable
Rev.2, Data Guaranteed No-Load & Load Losses shall be within the limit value for no load loss
Schedule acceptable limit. and load loss.
clause 4.3.4
6. 53-TMSS-01, The reference from technical standards shall be provided Noted. Revised data
Rev.2, Data under column ‘C’ for the given values for Maximum schedule will be submitted at
Schedule Symmetrical & Asymmetrical short circuit current for detail design stage.
clause 4.3.6 which windings are designed to thermally withstand.
7. 53-TMSS-01, It shall be confirmed that the accessories such as tap Confirmed.
Rev.2, Data changer, motor driving units, Oil/Gas relay for OLTC,
Schedule Buccholz Relay, Pressure relief Device, WTI, OTI and
clause 4.5 HV, LV, TV Bushings shall be from the SEC/NG
approved manufacturer.
8. 53-TMSS-01, The reference from technical standards with particular Noted. Revised data
Rev.2, Data clause number shall be provided under column ‘C’ for schedule will be submitted at
Schedule the given values for BIL, Power Frequency withstand detail design stage.
clause 4.10 voltage, Creepage distance and cantilever strength for
each bushing. LV & TV bushing type designation shall
be cross verified whether it is oil to oil or oil to XLPE
and confirm accordingly.
9. 53-TMSS-01, The manufacturer details for cooling Fans shall be Detail information of cooling
Rev.2, Data provided and also it shall be from NG/SEC approved fan shall be submitted at
Schedule manufacturers. detail design stage.
Page 15 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
clause 4.14
Compliance Statement to Data Schedule under 54-TMSS-01 Rev. 2
10. - Each sheet of the data schedule shall be stamped by the Noted. Revised data
manufacturer as well. schedule will be submitted at
detail design stage.
11. - Dissolved gases in the oil shall be interpreted as per IEC 1. Dissolved gasses in the oil
60599. Test Report for Oil properties shall be submitted shall be interpreted as per IEC
for batch of oil to be filled complying to Table 2 of IEC 60599.
60296 during project execution stage. →IEC 60599 standard is
applicable for oil filled
electrical equipment in
service and not for new oil.
So this is not suitable for this
new project.
Page 16 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
direct redundant FO interface (dual port) without any
converter between DGA and SAS LAN
D. Compliance to Outline Diagram for 380/132/13.8kV, 500MVA Auto Transformer
1. The outline diagram for Power transformer not submitted. Please clarify the meaning of
outline diagram. If required
document is outline drawing,
please refer to submitted
outline drawing.
IV. Equipment: 3ph 60Hz 380kV 60MVAR ONAN Shunt reactor
Make: Hyosung Heavy Industries Corporation, Korea.
A. Compliance on Manufacturer’s responsibility statement for 3ph 60Hz 380kV 60MVAR ONAN Shunt reactor
1. - Bidder’s compliance to Manufacturer’s responsibility
statement is noted with no deviations.
Page 17 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Compliance Statement to 53-TMSS-03, Rev. 0
5. - Bidder has mentioned as N/A as a compliances to 53-
TMSS-03. It must be clarified why the above standard is
Not Applicable (N/A)
Page 21 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Page 22 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
from where the manufacturer chosen such values and
those references shall be given under column ‘C’.
5. 58-TMSS-01, Knee Point in Magnetic flux versus Current curve (curve It shall be submitted at detail
Rev.2, Data to be enclosed) – Response from Bidder is YES. But, design stage.
Schedule there is no such curve with the data schedule. It shall be
clause 4.3.1 enclosed with the revised submittal.
6. 58-TMSS-01, The reference with clause number from technical Please be noted that those
Rev.2, Data standards shall be provided under column ‘C’ for the values are based on 01-
Schedule given values for Impulse withstand voltage, Power TMSS-01, Rev.3 and IEC
clause 4.3.2 Frequency withstand voltage and Switching Impulse 60076-10. Revised data
withstand voltage. schedule will be submitted at
detail design stage.
7. 58-TMSS-01, The mentioned values for Guaranteed Losses shall be Please clarify the acceptable
Rev.2, Data within the acceptable limit and the supporting document limit value for no load loss
Schedule shall be provided to prove the mentioned value of losses. and load loss.
clause 4.3.6 The IEC Clause reference also shall be mentioned under
column ‘C’ with the particular clause numbers.
8. 58-TMSS-01, It shall be confirmed that the accessories such as Confirmed.
Rev.2, Data Buchholz Relay, Pressure relief Device, WTI, OTI, OLI
Schedule and HV & Neutral Bushings shall be from the SEC/NG
clause 4.3.7 approved manufacturer.
to 4.3.13
9. 58-TMSS-01, The reference with clause number from technical Please be noted that those
Rev.2, Data standards shall be provided under column ‘C’ for the values are based on 01-
Schedule given values for BIL, Switching Impulse withstand TMSS-01, Rev.3 and IEC
clause 4.3.23 voltage, Power Frequency withstand voltage, Creepage 60076-10. Revised data
distance and cantilever strength for each bushings. schedule will be submitted at
detail design stage.
Page 23 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
10. 58-TMSS-01, It is mentioned that the particular clause is not under Noted. Revised data
Rev.2, Data manufacturer’s scope and in such a case, the contractor schedule will be submitted at
Schedule shall comply it and compliance statement shall be detail design stage.
clause4.3.29 revised accordingly.
Compliance Statement to Data Schedule under 54-TMSS-01 Rev. 2
11. - Each sheet of the data schedule shall be stamped by the Noted. Revised data
manufacturer. schedule will be submitted at
detail design stage.
12. - Dissolved gases in the oil shall be interpreted as per IEC 1. Dissolved gasses in the oil
60599. Test Report for Oil properties shall be submitted shall be interpreted as per IEC
for batch of oil to be filled complying with Table 2 of IEC 60599.
60296 during project execution stage. →IEC 60599 standard is
applicable for oil filled
electrical equipment in
service and not for new oil.
So this is not suitable for this
new project.
1. PTS: Section The VT Burden shall be 100VA as per PTS, which shall
III, Clause be complied. Manufacturer has complied as per the data
2.C.c.7 schedule for 32-TMSS-02, Rev.2, Clause 4.13 and it shall
be complied here as well.
2. General It shall be noted that the control cables and their cross
section used for the connection between the switchgear
and the LCC shall be submitted during design stage for
further review and approval.
3. PTS: Confirm to supply the special tools as per PTS
Appendix- requirements. Appendix-XIII. One (1) set of special tools
XIII shall be supplied to each 132kV GIS#2 and 132kV GIS#3
Page 25 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
as both are located in different locations.
Page 26 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
2.C.c.8 stage. If the above studies/calculations are not by
Manufacturer’s scope, it shall be complied by the
contractor and compliance statement shall be revised
accordingly.
5. PTS- It shall be noted that the GIB routings are shown in the
SECTION- tender layout CT- 920223, Rev.0 is tentative only and
III, Clause actual shall be confirmed during design stage. However,
2.C.c.11 we have revised 132kV GIS#1 & 2 layout by showing
the GIB routings for only RE developer feeders and for
rest of the feeders only duct banks have been considered.
Bidder has to follow as per Amendment-1.
6. PTS- The partial discharge monitoring sensors for the proposed
SECTION- equipment as per PTS shall be integrated with the On-line
III, Clause Partial Discharge
2.D. Monitoring System for existing/ongoing phase-1 or
otherwise a separate new standalone online PDMS require
under this PTS, if it can’t be integrated with the existing
system. Confirm to comply.
7. PTS- Bidder has mentioned that Special tools have been not
APPENDIX- included since they have been already provided with the
XIII, original GIS. We have noted it and bidder needs to
confirm to supply the same special tools as specified in
PTS#22CR328, Appendix-XIII for each 132kV GIS#2
and 132kV GIS#3 as both shall be installed in different
locations.
8. PTS- Bidder has to consider the revised 132kV GIS#2 &
APPENDIX- 132kV GIS#3 SLD and Layouts as per the Amendment-
I, 1.
Page 27 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Compliance Statement to 32-TMSS-05 Rev. 1
9. 32-TMSS-05, Compliance statement for 32-TMSS-05, Rev.1 is missing.
Rev.1
Compliance Statement to 32-TMSS-02 Rev. 2
10. 32-TMSS-02, It shall be noted that the Quantity & Location of 132kV
Rev.2, Clause GIS Surge arrestors shall be decided as per
4.18.1 EMTDC/insulation coordination study during design
stage. If such study not included in Manufacturer’s
scope, it shall be complied by the main contractor and
compliance shall be revised accordingly.
11. 32-TMSS-02, It shall be clarified with the approval reference for sub-
Rev.2, Clause suppliers for the components and attach the relevant
4.23.5 approved list of sub suppliers.
12. 32-TMSS-02, Submit the type test report for our references.
Rev.2, Clause
4.23.5
C. Compliance to Data Schedule
Compliance Statement to Data Schedule under 32-TMSS-02 Rev. 2 -
1. 32-TMSS-02, Each sheet of the same data schedule shall be signed &
Rev.2, Data sealed by both Manufacturer & Contractor.
Schedule
2. 32-TMSS-02, Each mentioned data shall be revised corresponding to
Rev.2, Data the units with the respective temperature or duration (in
Schedule Seconds)
clause 4.9
Page 28 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
3. 32-TMSS-02, As mentioned in Data Schedule Page 62 of 62, other
Rev.2, Data particulars shall be filled in column ‘C’ by the bidder
Schedule such as the technical reference with clause number for
each data given by the bidder under clause 4.2, 4.4, 4.5,
4.9, 4.10, 4.11 i.e. Clause Reference from technical
standards for each given data shall be provided.
4. 32-TMSS-02, It shall be clarified with the approval reference for sub-
Rev.2, Data suppliers for the components and attach the relevant
Schedule approved list of sub suppliers.
clause 4.11,
4.12, 4.13,
4.15, 4.16,
4.18
5. 32-TMSS-02, Bidders has not mentioned anything under Special tools
Rev.2, Data –SF6 Gas Maintenance Cart. Special tools for each 132
Schedule kV GIS#2 & 132kV GIS#3 shall be considered
clause 6.0 separately as both GIS shall be installed in different
locations.
Compliance Statement to Data Schedule under 38-TMSS-07 Rev. 1
6. Compliance statement for 38-TMSS-07, Rev.1 data
schedule is missing.
Compliance Statement to Data Schedule under 32-TMSS-05 Rev. 1
7. Compliance statement for 32-TMSS-05, Rev.1 data
schedule is missing.
D. Compliance to SLD & Layout
1. The Single Line & Gas Schematic Diagram and GIS
Page 29 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Layout & Requirements shall be reviewed during design
stage. We cannot approve and fix any proposal at this
stage as this is LSTK project including Engineering and
Design. However, bidder has to modify the layout &
diagrams based on the relevant modifications in 132kV
GIB routing as per the revised substation layout &
132kV SLD attached with Amendment-1 and submit
with the revised submittals.
VII. Equipment: 132kV Gas Insulated Switchgear (GIS), Type of GIS: 145SP-3
Make: Hyundai Electric & Energy Systems Co., Ltd., Korea
A. Compliance on Manufacturer’s responsibility statement for 132kV Gas Insulated Switchgear (GIS)
1. - Bidder’s compliances are noted with do deviations on Please refer to attachment #1
Manufacturer’s responsibility statement. However, the for the revised manufacture’s
type of 132kV GIS/GIL shall be mentioned with the responsibility statement.
revised document.
3. - PTS No. shall be corrected with the title of the Please refer to attachment for
document. the revised compliance
statement.
4. PTS- Bidder’s query about VT quantity is noted. We We did not receive
SECTION- recommend to follow the revised SLD for 132kV GIS#2 Amendment-1 during
III,Clause:2.C and 132kV GIS#3 attached with Amendment-1. If any bidding stage.
.c.6 further clarifications on VT quantity, shall be discussed
with the next cycle of post bid clarifications based on
bidder’s response.
5. PTS- The VT Burden shall be as per PTS. Bidder to confirm to Confirmed.
SECTION- comply accordingly.
III,Clause:2.C
.c.7
6. PTS- It shall be noted that the Quantity & Location of 132kV We did not receive
SECTION- GIS Surge arrestors shall be decided as per Amendment-1 during
III, Clause EMTDC/insulation coordination study during design bidding stage.
2.C.c.9 stage. However, Bidder has to consider the Surge arrestor
Page 31 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
requirements based on the revised 132kV GIS #2 & 132kv
GIS#3 SLD attached with amendment-1.
7. PTS- It shall be noted that the GIB routings are shown in the We did not receive
SECTION- tender layout CT- 920223, Rev.0 is tentative only and Amendment-1 during
III, Clause actual shall be confirmed during design stage. However, bidding stage.
2.C.c.10 we have revised 132kV GIS#1 & 2 layout by showing
the GIB routings for only RE developer feeders and for
rest of the feeders only duct banks have been considered.
Bidder has to follow as per Amendment-1.
8. PTS- The partial discharge monitoring sensors for the proposed Confirmed.
SECTION- equipment as per PTS and it shall be integrated with the
III, Clause On-line Partial Discharge Monitoring System for
2.D. existing/ongoing phase-1 or otherwise a separate new
standalone online PDMS require under this PTS, if it can’t
be integrated with the existing system. Confirm to
comply.
9. PTS- Bidder has to confirm to supply the same special tools as As per pre-bid clarification
APPENDIX- specified in PTS#22CR328, Appendix-XIII separately for #1, S/N 82, one set of special
XIII, each 132kV GIS#2 and 132kV GIS#3 as both GIS have to tools for 132 kV GIS is
be separately installed in different locations. required.
10. PTS- Bidder has to consider the revised SLD and Layouts as We did not receive
APPENDIX- per the Amendment-1. Amendment-1 during
I, bidding stage.
11. - Bidder has mentioned that the Outdoor equipment (Tublar Confirmed, please refer to
Conductor, Outdoor surge arresters, free standing current the attachment.
transformer, Aluminium bus bars, Termination Hardware,
Ring/Split core C.T's for TEE protection, XLPE/Air
terminations (Cable Pot Heads), etc.) were excluded from
Page 32 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
GIS supplier's scope. In such a case, it shall be confirmed
that the above will be supplied by the main contractor and
compliance statement updated accordingly.
Compliance Statement to 31-TMSS-06 Rev. 1
12. Bidder’s compliance to 31-TMSS-06, Rev.1 is noted Noted.
with no deviations.
Compliance Statement to 32-TMSS-05 Rev. 1
13. 32-TMSS-05, Compliance statement for 32-TMSS-05, Rev.1 is missing. For 145 kV GIB, it will be as
Rev.1 per 145 kV GIS PQ (32-
TMSS-02, Rev.02).
Compliance Statement to 32-TMSS-02 Rev. 2
14. 32-TMSS-02, It shall be noted that the Quantity & Location of 132kV Confirmed.
Rev.2, ClauseGIS Surge arrestors shall be decided as per
4.18.1 EMTDC/insulation coordination study during design
stage. It shall be confirmed by the contractor and the
compliance statement shall be revised accordingly.
15. 32-TMSS-02, It shall be clarified with the approval reference for sub- Confirmed. Sub-supplier list
Rev.2, Clause suppliers for the components and attach the relevant will be provided for SEC
4.23.5 approved list of sub suppliers. approval in design stage.
C. Compliance to Data Schedule
Compliance Statement to Data Schedule under 32-TMSS-02 Rev. 2 -
1. 32-TMSS-02, Each sheet of the same data schedule shall be signed & Confirmed, please refer to
Rev.2, Data sealed by both Manufacturer & Contractor. the attachment.
Schedule
2. 32-TMSS-02, As mentioned in Data Schedule Page 62 of 62, other Confirmed, please refer to
Rev.2, Data particulars shall be filled in column ‘C’ by the bidder the attachment.
Page 33 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
Schedule such as the technical reference with clause number for
each data given by the bidder under clause 4.1, 4.2, 4.4,
4.5, 4.9, 4.10, 4.11 i.e. Clause Reference from technical
standards for each given data shall be provided.
3. 32-TMSS-02, It shall be clarified with the approval reference for the Confirmed, please refer to
Rev.2, Data components and attach the relevant approved list for the attachment.
Schedule such components mentioned under 32-TMSS-02, Rev.2,
clause 4.11, Data Schedule clause 4.11, 4.12, 4.13, 4.15, 4.16, 4.18.
4.12, 4.13,
4.15, 4.16,
4.18
4. 32-TMSS-02, Bidder to confirm that the Special tools for each 132 kV As per PTS & pre-bid
Rev.2, Data GIS#2 & 132kV GIS#3 shall be supplied separately as clarification #1, S/N 82,
Schedule both GIS shall be installed in different locations. only one set of special tools
clause 6.0 for 132 kV GIS shall be
submitted along with the bid.
Compliance Statement to Data Schedule under 38-TMSS-07 Rev. 1
5. - Each sheet of Compliance statement for 38-TMSS-07, Confirmed, please refer to
Rev.1 data schedule shall be signed and sealed by both the attachment.
manufacturer and contractor.
6. - The clause number from the respective technical standards Please refer to attachment
with clause number shall be mentioned under column ‘C’ for revised data schedule
particular to Power frequency with stand voltage and #5 for test report of UHF
mentioned under clause 5.1 of data schedule 38-TMSS- PD sensor during SEC PQ.
07, Rev.1.
Page 34 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
7. - Bidder has mentioned in PTS Compliance statement for Partial discharge monitoring
PTS-SECTION-III, Clause: 2.D that, On-line PDMS and sensors are included in
HFCT PD sensors shall be supplied by main contractor. In 132KV GIS & shall be
such a cases, the relevant portions of 38-TMSS-07, Rev.1 integrated with the On-line
shall be filled by the contractor and submitted with the Partial Discharge Monitoring
revised submittal. System for existing/ongoing
phase-1.
If it can’t be integrated with
the existing system, then
PDMS technical offer from
SEC approved & pre-
qualified list will be
submitted at base design
stage for SEC review &
approval.
Compliance Statement to Data Schedule under 32-TMSS-05 Rev. 1
8. Compliance statement for 32-TMSS-05, Rev.1 data For 145 kV GIB, it will be as
schedule is missing. per 145 kV GIS PQ (32-
TMSS-02, Rev.02).
D. Compliance to SLD & Layout
1. The Single Line & Gas Schematic Diagram and GIS We did not receive
Layout & Requirements shall be reviewed during design Amendment-1 during
stage. We cannot approve and fix any proposal at this bidding stage.
stage as this is LSTK project including Engineering and
Design. However, bidder has to modify the layout &
diagrams based on the relevant modifications in 132kV
GIB routing as per the revised substation layout &
Page 35 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
132kV SLD attached with Amendment-1
VIII. Equipment: 132kV Gas Insulated Switchgear (GIS), Type of GIS: HSG-144D
Make: Hyosung Heavy Industries Corporation, Korea
A. Compliance on Manufacturer’s responsibility statement for 132kV Gas Insulated Switchgear (GIS)
1. - Noted with do deviations on Manufacturer’s responsibility
statement. The type of 132kV GIS/GIL shall be
mentioned with the revised document. Also 132kV GIL
shall be included with manufacturer’s responsibility
statement.
Page 38 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
1. 32-TMSS-02, As mentioned in Data Schedule Page 62 of 62, other
Rev.2, Data particulars shall be filled in column ‘C’ by the bidder
Schedule such as the technical reference with clause number for
each data given by the bidder under clause 4.1, 4.2, 4.4,
4.5, 4.9, 4.10, 4.11 i.e. Clause Reference from technical
standards for each given data shall be provided.
2. 32-TMSS-02, It shall be clarified with the approval reference for the
Rev.2, Data components and attach the relevant approved list for
Schedule such components mentioned under 32-TMSS-02, Rev.2,
clause 4.11, Data Schedule clause 4.11, 4.12, 4.13, 4.15, 4.16, 4.18 .
4.12, 4.13,
4.15, 4.16,
4.18
3. 32-TMSS-02, Bidder to confirm that the Special tools for each 132 kV
Rev.2, Data GIS#2 & 132kV GIS#3 shall be supplied.
Schedule
clause 6.0
Compliance Statement to Data Schedule under 38-TMSS-07 Rev. 1
4. Compliance statement for 38-TMSS-07, Rev.1 data
schedule is missing.
Compliance Statement to Data Schedule under 32-TMSS-05 Rev. 1
5. Compliance statement for 32-TMSS-05, Rev.1 data
schedule is missing.
D. Compliance to SLD & Layout
1. The Single Line & Gas Schematic Diagram and GIS
Layout & Requirements shall be submitted separately for
Page 39 of 40
RFX 4000071727
EXPANSION OF AR RASS PV 380/132kV BSP#9095 – Technical Proposal Review
Subject: S& ESD Com m ents on TECHNICAL PR OPOSAL from AL-BABTAIN
Department/Division: PCDD/S&ESD
CONTR ACTING CO., Saudi Arabia
ITEM PTS/CLAUSE/ CONCLUSION
SEC COMMENTS BIDDER’S REPLY SEC REPLY
NO. PAGE NO. / REMARKS
132kV GIS#2 & 132kV GIS#3 and it shall be reviewed
during design stage. We cannot approve and fix any
proposal at this stage as this is LSTK project including
Engineering and Design. However, bidder has to modify
the layout & diagrams based on the relevant
modifications in 132kV GIB routing as per the revised
substation layout & 132kV GIS #2 & #3 SLD attached
with Amendment-1
IX. Equipment: 13.8kV Grounding transformer
Make: Hyundai Electric & Energy Systems Co., Ltd., Korea
Page 40 of 40