FORM 4.2-1.
1
REQUIRED TRAINING FACILITIES FOR WORK-BASED
TRAINING
Trainees’
Training
Training Tools Equipment Materials Facilities
Activity/Task
Requirements
Objective/Goal
Submits and
checks
documents
Issues TRB and
Evaluation
Report LCD
School Discuss the do’s Projector
TPSAT
Orientation and don’ts while Tables and
on OJT chairs
Brief overview of
company policy
Legal policies
Monitoring and
evaluation
system
organizational
structure, legal
responsibility,
workplace safety
Familiarization LCD
on the workplace
Industry and the tools Projector Electrical
Orientation equipment Shop
Tables and
Lecture on chairs
Electrical
Installation and
Maintenance and
Written Test
ELECTRICAL Date Developed: Document No.
INSTALLATION June 2021
AND Compiled by: Issued by: Page
MAINTENANCE
NC II Timothy John N. Mandia Revision #
Electrical
Tape
PVC pipe
Service
entrance
cup 3/4
Panel board
6 branches
Butane Gas
PPE Working
table Hack saw
Phillip blade
Screw Portable
Junction
Install Driver Angle
box with
Electrical Grinder
Plan and prepare Flat screw cover
Protective Driver Electric Drill Utility box
work
Devices for with cover
Install electrical Combinatio Portable
Distribution, n Pliers
protective devices disc grinder Electrical
Power, Stanley Electrical
Install lighting Connectors
Lighting, hacksaw Shop
fixture and Long Nose ACU Outlet
Auxiliary,
auxiliary outlet Pliers Torch
Lightning Universal
Stanley
Protection and Notify completion Metal Pipe Outlet
Grounding of work Side cutting Bender Single
Systems Pliers
Stanley Metal Pipe Switch
Cutter 3-way
Multi-tester
Metal Pipe switch
Hummer Treader 4-way
switch
Single plate
2gang plate
3-gang plate
U-clamp
Circuit
Breaker
ELECTRICAL Date Developed: Document No.
INSTALLATION June 2021
AND Compiled by: Issued by: Page
MAINTENANCE
NC II Timothy John N. Mandia Revision #