PROJECT2: Integrated Assessment and Analysis of Hydraulic Assets For Sustainable and Resilient Flood Control Infrastructure
PROJECT2: Integrated Assessment and Analysis of Hydraulic Assets For Sustainable and Resilient Flood Control Infrastructure
Technology/Tool Estimated cost NPV (P) Roll out Strategy Range and
(P) & costing conditions for
deployment
FLOOD RISK MODELLING & ASSESSMENT
1D, 2D and 1D/2D coupled 1,800,000.00 Training for updated and high
hydrodynamic modelling adopters; resolution DTM
(MIKE software) all costs shall be bathymetric data
shouldered by rainfall/wind data
LGU water
level/stream flow
data
Calibration and
validation of the
models shall be
done on periods
with known
rainfall-runoff
data
1D, 2D and 1D/2D coupled 1,700,000.00 Training for updated and high
hydrodynamic modelling adopters; resolution DTM
(TUFLOW software) all costs shall be bathymetric data
shouldered by rainfall/wind data
LGU water level/
stream flow data
Calibration and
validation of the
models shall be
done on periods
with known
rainfall-runoff
data
Sediment transport modelling Free software Training for bathymetric data
(TELEMAC software) adopters;
all costs shall be
shouldered by
LGU
DESIGN & ANALYSIS OF FLOOD CONTROL INFRASTRUCTURES
Flood control simulation Training for updated and high
adopters; resolution
all costs shall be DTM/DEM
shouldered by bathymetric data
LGU/agency rainfall/wind data
water level/
stream flow data
land cover
Calibration and
validation of the
models shall be
done on periods
with known
rainfall-runoff
data
Design and analysis of 2,370,000.00 Training for Validated design
appropriate and resilient adopters; parameters from
flood control infrastructures all costs shall be MIKE +,
(using GeoSLOPE, STAAD shouldered by TUFLOW, &
& Civil3D) LGU/agency TELEMAC
softwares
Prepared by: