100% found this document useful (2 votes)
10K views19 pages

Mülimatt Sports Education Center Design

Uploaded by

Aayushi Pansara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
10K views19 pages

Mülimatt Sports Education Center Design

Uploaded by

Aayushi Pansara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

MÜLIMATT SPORTS CENTER

STUDIO VACCHINI ARCHITETTI

Group- 3
SURFACE ACTIVE SYSTEM
20BAR002- AFIFAH PATHERIA
20BAR011- MYANVY GAJJAR
20BAR029- PUSHTI SHAH
GENERAL INFORMATION

Beginning of works : August 2008

Completion : September 2010

Function / usage : Educational building

Material : precast Prestressed concrete


structure
Location : Windisch, Argovia,
Switzerland

Owner : Kanton Aargau

Architect : Studio Vacchini Architetti

Structural engineering : Fürst Laffranchi


Bauingenieure GmbH
https://m.facebook.com/photo.php?fbid=378309205584330&id=192071717541414&set=a.378309038917680&source=43&refid=13&__tn__=%2B%3D
GROUND
FLOOR
PLAN

width 55.14 m

length 80 m

building area 4.212


total floor area 8.818


gross cubic 59.530


volume m³

https://www.swiss-architects.com/de/architecture-news/reviews/geschickt-gefaltet
FIRST
FLOOR
PLAN

https://www.swiss-architects.com/de/architecture-news/reviews/geschickt-gefaltet
SECOND
FLOOR
PLAN

https://www.swiss-architects.com/de/architecture-news/reviews/geschickt-gefaltet
SECTION

https://www.swiss-architects.com/de/architecture-news/reviews/geschickt-gefaltet
it consists of 27 monolithically connected frame units with
a cross-sectional height of 2.59m and a span of 52.6m.
Distance between structural members is 2.9 m
http://dromanelli.blogspot.com/2020/11/livio-vacchini-mulimatt-gymnasium.html
http://dromanelli.blogspot.com/2020/11/livio-vacchini-mulimatt-gymnasium.html
Basic load transfer
Why is it a “surface active membrane structure”?

● In Plane load transfer


● Outer surface of the structure forms the membrane and gives form and
strength;carries load
● No additional support is present to pass load inside building

https://www.google.com/url?sa=i&url=https%3A%2F%2F2.zoppoz.workers.dev%3A443%2Fhttps%2Fwww.sika.com%2Fen%2Fconstruction%2Froof-systems%2Fcustom-roof.html&psig=AOvVaw0QcvV2kKA9xyXRT7D7AtnI&ust=1643 http://dromanelli.blogspot.com/2020/11/livio-vacchini-mulimatt-gymnasium.html
650584996000&source=images&cd=vfe&ved=0CAsQjRxqFwoTCPjzvtyB2vUCFQAAAAAdAAAAABAD
ONE- WAY SLAB

SPAN TO DEPTH RATIO


S:D= 21.28
S= 55.14 M

D= 2.59 M
CONNECTIONS

TENDONS WITH UPTO 6 STRANDS http://2.bp.blogspot.com/--mfsEePwssg/VWbGh_ByQZI/AAAAAAAAAQA/gbs2J9R


2o1E/s1600/20130115102809efee72316321c678171a9eecd9746a3788dd79ef.jpg

V-V II-II IV-IV III-III I-I


CONNECTION BETWEEN
DIFFERENT ELEMENTS Welded plate
connection between
the column-beam and
foundation beam.

https://fib-ch.epfl.ch/Pubs/2014/3_buildings.pdf

Connection between two column-beam elements


through tension ties.

https://fib-ch.epfl.ch/Pubs/2014/3_buildings.pdf

Connection between
the roof- beam
elements through
welded plates.
https://fib-ch.epfl.ch/Pubs/2014/3_buildings.pdf

Connection between the gym slab and column-beam element through tendons.
TRANSVERSE LOAD TRANSFER
The FUs guarantee the stability of the
structure in the transverse direction.

LONGITUDINAL LOAD TRANSFER


In the longitudinal direction, the diagonal
panels at the frame corners are
concatenated and accommodate a
continuous tension tie that ensures the
folded form.
TRANSVERSE SECTION VERTICAL LOAD TRANSFER IN
ROOF STRUCTURE

Gym slab

LOAD

REACTION
HORIZONTAL LOAD TRANSFER

Through the roof

Horizontal load is transferred through the gym slab.from the


Load
gym slab,it goes to the columns that are connected to the slab
through the tendons and then into the foundation beam,pile
foundation and finally into the ground. reaction
VERTICAL LOAD TRANSFER IN LOWER STRUCTURE

Folded
concrete V
plate

Vertical load is transferred


through the columns to the
pile foundation and then to the Pile foundation
ground below

One Frame Unit


POST -TENSIONING

BEAM TENDONS JACK

HOLLOW DUCT TO BE FILLED


WITH CEMENT GROUT

The portal frames are tensioned in two


direction :

one direction along the roof span to minimize


the bending moment

One in vertical direction to decrease the


compressive force
3D MODEL
SCALE- 1:100
3D MODEL
SCALE- 1:20

You might also like