Method study is the systematic recording and critical examination of existing and
proposed ways of doing work as a means of developing and applying easier and more
effective methods and reducing costs.
Objectives of Method Study
Some important objectives of method study are:
i. The improvement of processes and procedures.
ii. To eliminate wastage of time and labor.
iii. Prevention of fatigue and breaking the monotony (dullness) of repetitive work.
iv. To find the best way of doing a job.
v. To improve the design of workplace layout.
vi. To train the individual worker in its practice as per standardized method.
vii. Reduction of waste and scrap, improvement in quality.
viii. Effective material handling.
ix. Greater job satisfaction, higher standards of safety and health.
x. Improvement in the flow of production and processes.
Need of Method Study
i. Method/motion study is a means of enhancing the production efficiency
(productivity) of the firm by elimination of waste and unnecessary operations.
ii. It is a technique to identify non-value adding operations by investigation of all the
factors affecting the job.
iii. It is the only accurate and systematic procedure oriented techniques to establish
time standards.
iv. It is going to contribute to the profit as the savings will start immediately and
continue throughout the life of the product.
v. It has got universal applications such as in:
a. Industries
b. Marketing, sales and distributions
c. Material handling
d. Design
e. Building and other constructions
f. Hospitals
2
g. Transport etc.
Pre-requisites of Conducting a Method Study
The workers must be taken into confidence
They should not feel that they are kept in dark
Good human relationship
Good working conditions
Role of Work Study in Improving Productivity
Both the aspects of work study i.e. method study and work measurement tend to raise the
productive efficiency of the workers and hence, the productivity of an industry.
Work Study
Higher Productivity
Method study increases productivity because it:
i. Cuts down the work content of the job by eliminating unnecessary and un-
useful/unproductive motions
ii. Develops the best method of doing a job which imparts least fatigue to the
operators
iii. Results more effective use of machinery, man-power and material.
iv. Improves design of work place layout
v. Improves the better working conditions and relations
Work measurement increases productivity because it:
i. Reduces ineffective time
ii. Suggest rest, pauses and other allowances which results the operators in a position
to maintain their productive efficiency
iii. Provide a sound basis for giving incentives to the workers to produce more
iv. Calculates the correct man-power required for doing a job, and
3
v. Aids in accurate production planning
Hence, if correct and systematic work study is done in any organization than higher
productivity is natural.
Procedure of conducting Method Study
Method study procedure consists of the following steps (See Figure 1):
1. Select
2. Record
3. Critically examine
4. Develop the best method
5. Define
6. Install
7. Maintain
Recording Techniques
The recording techniques are designed to simplify and standardize the recording work.
The purpose of recording can be summarized as follows:
i. To enable the process to be clearly understood
ii. To present the existing facts for analysis
iii. To submit the proposals to the management in a form which can be easily
understood
iv. To guide supervisors and operators regarding detailed operating instructions
In order to make presentation of facts clearly, without any difficulty and to enable to
grasp them quickly and clearly, it is better to use symbols instead of written description.
The following are the basic types of diagrammatic aids used for recording and
communicating a work method. These are:
i. Process Charts
ii. Diagrams
iii. Templates and Models
4
Method Study
Factors
Economic Considerations (time pd.,
Select the job to be job nature and use)
studied Technical Considerations (skill, f, d,
N cutting tool, material)
Human considerations
Results
To achieve improved factory and workplace layout,
improved design of equipment, better working conditions, HIGHER
Recor
PRODUCTIVITY
reduction of fatigue, effective use of material, plant,
equipment and man-power
6
4. Transport It indicated the movement of an
item from one location to another.
Example: Oil flowing through a
penstock; MS bar being sent from
store to M/c shop; gear blank from
lathe to milling M/c etc.
5. Delay or Temporary Delay occurs when something stops
Storage the process and a product waits for
the next event. Example: Power
failure; traffic jam; machine
breakdown etc.
6. Operation-cum- Example: Article are being painted
Transportation as they are transported by belt
conveyor.
7
Figure 2(a): Man-type Flow Process Chart
Summary
Events No. Time Distance
(in meters)
7
2 30
Total 12 30m
8
Summary
Events Number Time Distance
1 20
1
2 15
3 8 26
1
Total 8
Exercise 3: Task: Flow process chart of equipment type- Watering the garden using hose
pipe.
Equipment: Hose-pipe
Job: Watering the garden
Chart begins: Hose lying in the cupboard Summary:
Chart ends: Hose lying in the cupboard Events No. Time Distance
(in mints.) (in m)
5 - -
1 Pipe lying in cupboard 2 - -
2 - 4
1 Lifted
Removed from tap
1 2 3 4
Lying in
Re-placed in cupboard 5 2
cupboard
9
Exercises:
Writing a letter using a shorthand typist.
Polishing the specimen and looking for the microstructure. For Home
Issuing of book (any type) from book bank. Assignment
Draw a flow process chart (man type) performing an operation on UTS M/c.
Two-hand Process Chart
A two hand process chart is a process chart in which the activities of a worker’s left hand
and right hand along with limbs are recorded while he is performing an operation at any
work station. The activities of two hands and limbs can be analyzed by providing a time
scale on the chart and repetitive, unnecessary, uneconomical activities can be neglected.
Here meaning of symbols is slightly changed as:
-----When hand is idle not performing any activity,
----- Hold---Hand holds the object so that other hand to some activities on that object,
---- Movement of hand here & their, and
------- Operation—grasps, release, assemble etc.
This chart is generally used for analysis of short duration and assembly work.
Exercise 1: Assembly of two washers and nut to bolt (See Figure 3(a)).
Chart begins: Hand empty, material in boxes.
Chart ends: Completed assembly placed in other box.
Method: Present/Proposed
Left Hand Symbol Time Symbol Right Hand
Description (LH) (Minutes) (RH) Description
To bolt 0.5m 0.5m To first washer
Pick up bolt Pick up washer
To position 0.5m 0.5m To position
Hold Assemble to bolt
Hold 0.5m To second washer
Hold Pick up washer
Hold 0.5m To position
Hold Assemble to bolt
Hold 0.5m To nut
Hold Pick up nut
Hold 0.5m To position
To box 0.5m Assemble to bolt
Put in the box Idle
Figure 3(a): Left Hand and Right Hand Chart
10
Summary:
Symbol Number Time Distance Symbol Number Time Distance
2 6
3 1.5m 6 3.0m
- 1
9 -
Exercises:
1. Draw a left hand and right hand chart for signing a letter and give detailed
summary.
For Home
2. Draw a LH and RH chart for opening a bottle of coke. Assignment
3. Draw a RH and LH chart for changing the battery of wall cloak.
Multi-activity Chart
It is a chart where a number of workers work in a group or an individual operator handles
two or more machines or equipments, their activities are recorded on a common time
scale and thus, shows inter-relations between them.
They may be of the following type:
i. Man-machine chart---one man handling one job or one machine.
ii. Man-multi machine chart---one man handling number of machines.
iii. Multi-man chart---a group is doing one job.
11
iv. Multi-man-machine chart---a number of persons working on a computer system.
Exercise 1: An operator working on two machines (See Figure 4(a)).
Time Man Machine-1 Machine-2
(in minutes) (Operator)
10 Setting M/c-1 M/c being set Idle
12
Summary:
Cycle Time= 1.4 minutes M/c Working Time= 0.6 minutes
Man’s Working Time= 1.2 minutes Machine Idle Time= 0.8 minutes
Man’s Idle Time= 0.2 minutes
1.2
Utilization: Man= 100 85%
1.4
0.6
Machine Utilization= 100 42%
1.4
Man-Machine Chart
It has two parts, on one side the action of the operator is recorded and on the other side
the action of the machine is recorded with reference to a common time scale.
Example: A man working on three machines at a time.
Time Man Machine-1 Machine-2 Machine-3
(in seconds)
Unload M/c-3 Stopped
Load & start M/c-3
Move to M/c-1 Running
Wait Running
Running
Unload M/c-1
Stopped
Wait
Assuming that the machines are running state
Figure 5: Man-machine chart
Exercises:
i. Construct a multi-activity chart of two men working on two drilling machines and
drilling a hole (with summary).
ii. Construct a man-machine chart of a man working on a computer system and is
typing an application and taking out the print. For Home
iii. Draw a man-machine chart if one man is operating one drilling machine and other Assignment
on cutting machine.
iv. Draw a man-machine chart of your choice using two men and three machines.
Also, calculate each machine utilization and men utilization percentages.
13
Flow Diagram
It is a drawing or a diagram which is drawn to scale and marks the path followed by men
and materials. Flow diagram is used to supplement the flow process chart. It shows the
relative position of productive machinery, storage area, jigs, fixtures, etc. shown by
joining the symbols with straight lines. Flow diagram may minimize the number of
movements or repetitive movements which results in a lot of saving both in cost as well
as efforts required to do a job.
B 2 A
1
2
3
C
1
1
4
A, B, C & D----Shops
Store 5
D
1 1
Out
14
Principles of Motion Economy
Principles Governing Motion Study
Set of rules were designed by Gilberth in order to develop better method. They are:
Both hands should move simultaneously. This reduces fatigue.
Both hands should complete their movements at the same time i.e. they should
start and finish their motions at the same time.
Both hands should not be idle at the same time unless in a rest period.
Between two movements there should be some time gap. The time gap is called
elapsed time (pass).
Motion of both the hands should be symmetrical and in opposite directions and
should be made simultaneously.
Hesitation in any movement observed at any time should be analyzed.
The shortest time demonstrated by any worker should be marked and efforts
should be made to attain it.
The number of motions required to do a particular work should be clearly
specified.
Variations in time for any movement should be avoided and causes recorded.
All motions should be easy, natural and should reduce fatigue.
Introduction to Therbligs
To facilitate the analysis of motion, Gilberth developed a set of smaller hand motions
some of which could be combined to give a complete motion. The smaller motions he
termed as “Therbligs” (reverse spelling of his name). They are 18 in numbers. For the
purpose of recording the motions, he split up different motions of a process into 18
fundamental hand motions. Every therblig is represented by a symbol, a definite color
and with a word or two to record the same (See Table 2).
A chart which uses or employs Therbligs is referred as “micro-motion study
chart” while a chart which uses symbols like etc. which are macroscopic
in nature is referred as process chart. SIMO chart is a microscopic chart. A single
operation may consist of many Therbligs.
15
For example:
Macroscopic motion Microscopic Motion
(Therbligs)
Operation of picking away a screw Reach hand for screw driver
driver (Transport empty)
Grasp the same (Grasp)
Take away the screw driver (Transport
loaded)
Micro-motion Study
Micro-motion study means the study of micro (small) motions know as Therbligs. Each
human activity is divided or split into small movements. The purpose of such study is to
find for an operator one best pattern of movement which involves less efforts, time, and
fatigue to accomplish a task. This study is best suited for those operations which are short
in cycle and are repeated thousands of time (such as packing of sweets into boxes, food
canes into cartons, launching of space craft, missiles, modern cricket, athletics etc.).
16
Micro-motion study involves taking motion pictures of an activity while being
performed by the operator with a timing device kept in the field of view and than film is
studied on the projector frame by frame.
Following equipments are required for this study:
1. Movie camera.
2. 16mm film for recording.
3. Micro-chronometer or Wink counter (1 Wink=1/2000 of a minute).
4. Motion picture projector with screen.
Exercise: What are the advantages and applications of micro-motion study? Give the For Home
step-wise procedure of micro-motion study. Assignment
17
Exercise: Study the motions used in following operations using therbligs:
i. Cleaning your teeth with tooth brush.
ii. Packing three types of sweets in a box.
For Home
iii. Punching a hole in a lock body. Assignment
iv. Planting a flower plant in the pot.
Note: Use both the hands in performing the above tasks.
**************
18