High Wall AC Installation Manual
High Wall AC Installation Manual
1 Remote controller 1
2 2
R-03 dry battery
more than G
10cm 3 1
Mounting plate
4 1
Drain hose
Arrangement of piping 4X50
directions 5 Steel nail, cement
6
more than 10cm
Rear left F 6 4X25 Plastic cap
4
A Screw
Left Rear
right 1
7 Drain-elbow
Right
C 8 Cover 1
Below
9 Cushion 4
more than10cm
more than 30cm 10 1
Pipe supporting plate
0010
3 Installation of the Indoor Unit
380
260
Drawing of pipe
184.3 580 184.3
140 500 140
1. Insert the drain hose into the dent of heat insulation materials of indoor unit.
2. Insert the indoor/outdoor electric cable from backside of indoor unit, and pull it
out on the front side, then connect them.
3. Coat the aring seal face with refrigerant oil and connect pipes.
Cover the connection part with heat insulation materials closely, and make sure
xing with adhesive tape
Pipe supporting
plate
Lid for right Drain hose
piping
Lid for left piping
Lid for under piping pipe
Indoor/outdoor electric cable
When the mounting plate is rst xed Hang surely the unit body onto the upper notches of the
1. Carry out, based on the neighboring pillars or lintels, a proper leveling for the plate mounting plate. Move the body from side to side to verify its
secure xing.
to be xed against the wall, then temporarily fasten the plate with one steel nail.
In order to x the body onto the mounting plate,hold up
2. Make sure once more the proper level of the plate, by hanging a thread with a
the body aslant from the underside and then put it down
weight from the central top of the plate, then fasten securely the plate with the perpendicularly. mounting plate
attachment steel nail.
3. Find the wall hole location A using a measuring tape
A=113mm 1. Take out cushion blocks on When you unload the indoor unit,please use
the left and right angle beads
as shown in the following your hand to arise the body to leave agraffe,
24K Figure.
then lift the bottom of the body outward
slightly and lift the unit aslant until it
2. Remove 2 gaskets under the
B= cross-flow fan. leaves the mounting plate.
3. Clean the burr on the surface of fracture to avoid the power agraffe mounting plate
wire from being scratched after removing the virtual opening
30mm
Remove terminal cover at right bottom corner of indoor unit, then take off wiring
cover by removing its screws.
% ĭPP
12K A=41mm Insert from outside the room cable into left side of the wall hole, in which the
pipe has already existed.
When the mounting plate is xed side bar and lintel
Pull out the cable on the front side, and connect the cable making a loop.
Fix to side bar and lintel a mounting bar, Which is separately sold, and then Insert the cable from the back side of the unit, then pull it out on the front side.
fasten the plate to the xed mounting bar. Loosen the screws and insert the cable ends fully into terminal block, then
Refer to the previous article, “ When the mounting plate is rst xed “, for the tighten the screws.
position of wall hole. Pull the cable slightly to make sure the cables have been properly inserted and
tightened.
2 Making a Hole on the Wall and Fitting the Piping Hole Cover After the cable connection, never fail to fasten the connected cable with the
wiring cover.
Make a hole of 60 mm in diameter, slightly descending to outside the wall.
Install piping hole cover and seal it off with putty after installation
Wall hole
(Section of wall hole) Note When connecting the cable, con rm the terminal number of indoor and
G Piping hole pipe outdoor units carefully. If wiring is not correct, proper operation can not
be carried out and will cause defect.
2
Outdoor unit
1 Installation of Outdoor Unit
Power cable: Install according to Drawing for the installation of indoor and outdoor units
3G2.5mm
2 2 Connection of pipes
-mod 18: 3G2.5mm2
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
Indoor unit
Outdoor unit and the bending radius should be 30 to 40 mm or longer.
Connecting the pipe of gas side rst makes working easier.
The connection pipe is specialized for R410A.
<+)<+%$+$; Forced fastening without careful centering may
Half union Flare nut
damage the threads and cause a leakage of gas.
<+)<+%$+$;
Pipe Diameter( ) Fastening torque
Liquid side6.35mm(1/4") 18N.m
Liquid/Gas side9.52mm(3/8") 42 N.m
Gas side 12.7mm(1/2") 55N.m
Spanner Torque wrench Gas side 15.88mm(5/8") 60 N.m
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 7m, the function of the unit will be
affected. If the pipe has to be lengthened, the refrigerant should be charged,
according to 20 g/m. But the charge of refrigerant must be conducted by profes-
sional air conditioner engineer. Before adding additional refrigerant, perform air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
Power cable:
CAUTION
6G0.75mm
Outdoor unit
Indoor unit
B Indoor unit
B
A
Outdoor unit
Indoor unit
A
BR
/
BL
1
POWER
SUPPLY Y/G
Outdoor unit
Max.Elevation: Amax=15m
Outdoor unit In case the elevation A is more
than 5m, oil trap shoud be
<+)<+%$+$; installed every 5~7m
B Oil trap Max. Length: Bmax=25m
In case the pipe length B is
Indoor unit more than 7m, if the liquid pipe
A
diameter is 6.35mm the refrigerant
should be charged, according to 20g/m
;if the liquid diameter is 6.35mm the
refrigerant should be charged,
according to 50g/m
3 Connection
Use the same method on indoor unit. Loosen the screws on terminal block and
insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor
unit.
If wiring is not correct, proper operation can not be carried out and controller
may be damaged.
Fix the cable with a clamp.
4 Attaching Drain-Elbow
3
5. No gas leakage? 3 On Drainage
In case of gas leakage, tighten parts of pipe connection. If
leakage stops, then proceed 6. steps ƽ Please install the drain hose so as to be downward slope without fail.
ƽ Please don’t do the drainage as shown below.
If it does not stop gas leakage, discharge whole refrigerants from the service
port. After Àaring work again and vacuumize, ¿ll up prescribed
refrigerant from the gas cylinder. Less than
5cm
6. Detach the charge hose from the service port, open 2-way valve and 3-way. Turn
the valve rod anticlockwiseuntil hitting lightly. It becomes The end is imm- It waves. The gap with the There is the bad
high midway. ersed in water. ground is too smal smell from a ditch
7.To prevent the gas leakage, turn the service port’s cap, the valve rod’s cap for 2-way
valve and 3-way’s a little more than the point where the torque increases suddenly.
ƽ Please pour water in the drain pan of the indoor unit, and con¿rm that drainage
8. After attaching the each caps, check the gas leakage around the caps. is carried out surely to outdoor.
ƽ In case that the attached drain hose is in a room, please apply heat insulation to
it without fail.
Step 1. Step 2.
2-way valve Liquid Side
3-way valve Gas Side Open
Gaugemanifold(for R410A)
Ƶ Refrigerant charge label
Anti countercurrent joint
Step 3. Contains fluorinated greenhouse gases
covered by the Kyoto Protocol A
Close
Tube(for R410A)
Vacuum pump(for R410A) R410A 1= kg
B
2 2= kg
Step 4. Step 6. 2-way valve C
2-way valve 1
3-way valve
3-way valve 1+2= kg
O D
Open 90
F E
Correct Incorrect
4
2015 Johnson Controls, Inc. www.johnsoncontrols.com Doc. No.: AH9FZHAH--151103