0% found this document useful (0 votes)
81 views3 pages

Malhar Consultant Meet MOM 04.08.22

1. The minutes of the meeting held between Ashiana Housing Ltd. and various consultant teams on 04-08-2022 are documented. Key attendees are listed from both teams. 2. Action items from the meeting include sharing contact details, discussing site grading and levels with landscape and services consultants, considering stone masonry features, and connecting internal drains to an external drain. 3. Other items are to check using treated water from the STP for irrigation, adding metering to monitor water usage, reducing the thickness of non-structural walls, and analyzing structural drawings for a 22-story building.

Uploaded by

Sahil Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views3 pages

Malhar Consultant Meet MOM 04.08.22

1. The minutes of the meeting held between Ashiana Housing Ltd. and various consultant teams on 04-08-2022 are documented. Key attendees are listed from both teams. 2. Action items from the meeting include sharing contact details, discussing site grading and levels with landscape and services consultants, considering stone masonry features, and connecting internal drains to an external drain. 3. Other items are to check using treated water from the STP for irrigation, adding metering to monitor water usage, reducing the thickness of non-structural walls, and analyzing structural drawings for a 22-story building.

Uploaded by

Sahil Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Ashiana Housing Ltd.

Date: 17-08-22
Ashiana Malhar

MINUTES OF MEETING HELD AT SAYA JI ON 04-08-2022 DURING CONSULTANT'S MEET

The following were present :-


AHL Team Consultant's Team
1 Mr. Vishal Gupta VG Mr Sanjeev Mehta SM
2 Mr. SK Palit SKP Mr Prateek & Team
3 Col Sunil Damle SVD Mr Achyut Watve AW
4 Mr. Naveen Garg NG Mr Jayant Pasare JP
5 Ms. Nikita Dhiman ND Mr Amit Kendale AK
6 Mr. Dheeraj Agarwal DA Mr Yogesh Kapoor YK
7 Mr. Kapil Adhana KA Mr Ujjwal Sagar US
8 Mr. Ramshankar Sharma RSS Mr Kaustubh Nandurbarkar KN
9 Mr. Sahil Sharma SS
10 Mr Dinesh Thakur DT
11 Vinay Yadav VY

Sl.
What Who When Status
No.

Contact Details of all the persons present in the meet to be shared


1 with everyone so that smooth co-ordination could be maintained in DA 5-Aug-22
future b/w Consultant's & AHL team

It is decided to have a discussion over the grading and levels of the


2 site, along with Landscape consultant, services consultant, site team NG & DA 23-Aug-22
and head office team.

Thoughts for Stone masonry can be taken by consultant's in their


Landscape /Structural
3 future drawings for Retaining wall/Architectural features in the
Consultant -YK,SM
project.

There is a proposal given by service consultant for having an


external drain on 12m public road and connect all internal drains to
4 that outer drain. This can reduce internal drains dimesions. MEP Consultant-AK 19-Aug-22
Further, AK to check natural stream adjacent to our project for
better drainage possibilities in project.

Excess treated water from STP can be connect to the existing sewer
5 MEP Consultant-AK
line near Pawar Basti

There is a thought for Metering provision at inlet & outlet in Tower


6 Supply lines to check its proper usage & monitor. MEP Consultant-AK

Thickness of all NSW walls to be change from 150 mm to 125 mm Structural Consultant-
7
by Structural consultant as discussed in meeting. AW/JP

22 storey Building Structural Drawing to be taken from J+w Structural Consutlant-


8
Consutant to check & Analyze its costing for future purpose. AW/JP, DA

Prepared by : Sahil Sharma


Participants Contact Details for Ashiana Malha
S No. Name of Participant Contact No. E-mail Id
1 Mr. Sanjeev Mehta 9820231285 [email protected]
2 Mr. Prateek 7718092207 [email protected]
3 Mr. Achyut Watve 9822013113
4 Mr. jayant Pasare 8308819301 [email protected]
5 Mr. Amit Kendale 8446015100 [email protected]
6 Mr. Yogesh kapoor 9818469828 [email protected]
7 Mr. Ujjwal Sagar 9811198942 [email protected]
8 Mr. kaustubh Nandurbarkar 9822443305 [email protected]
9 Mr. S K Palit 9958109555 [email protected]
10 Mr. Sunil V Damle 7507025057 [email protected]
11 Mr. Arvind Pandey 8587900607 [email protected]
12 Mr. Naveen garg 9910031575 [email protected]
13 Mrs. Nikita Dhiman 9828023728 [email protected]
14 Mr. Dheeraj Agrawal 8766747979 [email protected]
15 Mr. Ram Shankar Sharma 7665006968 [email protected]
16 Mr. Sahil Sharma 8952824401 [email protected]
Ashiana Malhar
Designation Company Name
Architect Consultant Ethique
Architect Ethique
Structural Consultant J+W
Structural Consultant J+W
Services Consultant Amit Infracon
Landscape Consultant Shaheer Associates
Interior Consultant Studio design
Lighting Consultant Semblance design
VP Operations Ashiana Housing Ltd
VP Location Ashiana Housing Ltd
GM Architect Ashiana Housing Ltd
DGM Engineering Ashiana Housing Ltd
AGM-Architecture Ashiana Housing Ltd
Sr. Engineer Project Mgmnt Ashiana Housing Ltd
Project Manager Ashiana Housing Ltd
Sr. Site Engineer Ashiana Housing Ltd

You might also like