0% found this document useful (0 votes)
50 views4 pages

A554 D 455 CV Sow Con 021

The document outlines the Civil-Structural instructions and scope for the RAS Tanura Integrated Project (RTIP) under Contract S11100. It details the specific civil-structural tasks to be performed, including site grading, concrete lined ditches, and the fabrication of structural steel. The document is intended for internal use and is marked as confidential.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views4 pages

A554 D 455 CV Sow Con 021

The document outlines the Civil-Structural instructions and scope for the RAS Tanura Integrated Project (RTIP) under Contract S11100. It details the specific civil-structural tasks to be performed, including site grading, concrete lined ditches, and the fabrication of structural steel. The document is intended for internal use and is marked as confidential.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

RAS TANURA

INTEGRATED PROJECT
(RTIP)

S11100
16.2 CIVIL-STRUCTURAL INSTRUCTIONS
Document No. A554-D-455-CV-SOW-CON-021
Revision: 0 1 2 3

Prepared by: Veluchamy

Reviewed by: John Verba

DEC
Bill Everhardt
Approved by:

Owner
Mauro Cuellar
Approved by:

Revision Date: 30MAR12

Issue Purpose: IFC

Dow Engineering Company

Project No: S11100 Polyethylene Projects Issue Code: IFC


Date: 09-MAR-2012 CIVIL-STRUCTURAL INSTRUCTIONS Revision: 0
By: Veluchamy DOW CONFIDENTIAL - Do not share without permission Page: 1 of 4
Filename: 610330899.doc Doc No: A554-D-455-CV-SOW-CON-021
DOCUMENT ISSUE RECORD
Issue Date Doc.
Material or Job Spec Reason for Issue
No. Issued Rev.
1 30MAR12 0 S11100-554455 IFC

SUMMARY OF DOCUMENT REVISIONS


Rev. Date
No. Revised Section Revised Revision Description
0 30MAR12 All Document developed.

Project No: S11100 Polyethylene Projects Issue Code: IFC


Date: 09-MAR-2012 CIVIL-STRUCTURAL INSTRUCTIONS Revision: 0
By: Veluchamy DOW CONFIDENTIAL - Do not share without permission Page: 2 of 4
Filename: 610330899.doc Doc No: A554-D-455-CV-SOW-CON-021
TABLE OF CONTENTS

Section Topic

16.2 PURPOSE………………………………….………………………………………...….4

16.2.1 SCOPE……………………………………………………………………………………4

Project No: S11100 Polyethylene Projects Issue Code: IFC


Date: 09-MAR-2012 CIVIL-STRUCTURAL INSTRUCTIONS Revision: 0
By: Veluchamy DOW CONFIDENTIAL - Do not share without permission Page: 3 of 4
Filename: 610330899.doc Doc No: A554-D-455-CV-SOW-CON-021
16.2 PURPOSE

This document contains the Civil-Structural Project instructions and scope description for Contract
S11100.

16.2.1 SCOPE

The Civil – Structural scope of work for the Contract S11100 includes the following:

 Process sumps
 Site Grading
 Concrete lined ditches
 Road work except asphalt surface. Asphalt surface will be done later
 Culverts at road crossings
 Valve boxes for fire water lines
 Valve boxes for cooling water lines
 Street light foundations
 Fabrication and erection of structural steel

All work listed above and referenced on the drawings shall be executed as per the Engineering
Technical Specifications as listed in the Contract document S10010.

The TPER water stop materials will be supplied by Company as specified in the Contract S10010
and installed by S11100 Contractor.

Project No: S11100 Polyethylene Projects Issue Code: IFC


Date: 09-MAR-2012 CIVIL-STRUCTURAL INSTRUCTIONS Revision: 0
By: Veluchamy DOW CONFIDENTIAL - Do not share without permission Page: 4 of 4
Filename: 610330899.doc Doc No: A554-D-455-CV-SOW-CON-021

You might also like