RADIO SITE INSTALLATION DOCUMENTATION
COME_7 - 193 EXT L800
Region - MONO
MOOV AFRICA BENIN_CAPEX 2022
ATLANTIQUE TELECOM - BENIN
CAPTION LIST 1(1)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 001 51-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM (Faladema Talaki) 2022-08-07 A COME_7
Document List 1
Site Drawings 2
RADIO SITE INSTALLATION
DOCUMENTATION
Site Specifications 3
Allocation Documents 4
ATLANTIQUE TELECOM - BENIN Cabling Documents 5
MOOV AFRICA BENIN_CAPEX
2022 Test Documents 6
COME_7
Check Lists 7
193 EXT L800
Ericsson's Antenna System
4G-L800 MHz Additional Information 8
N/A
ATTENTION
This documentation must be updated on site. All
the documents must be corrected using a red pen
where changes have occurred, and signed by the
Installation Supervisor.
This documentation must then be returned to
Installation Engineering Department at Ericsson
Office for preparation of the Customer Site
Configuration Data (RBS) 1(1)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 1/127 04-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM (Faladema Talaki) 2022-04-05 A COME_7
Project: MOOV AFRICA BENIN_RAN Mod 2022_BNEW
Site: COME_7 Site Type: 193 EXT L800
1 GENERAL SITE DATA
1.1 Geographical coordinates Lat. = 1.927972 - Long. = 6.411369
1.2 Location MONO
1.3 Type of site Outdoor GT/RT
1.4 Site position Ground
1.5 Type of equipment's container Slab
2 TECHNICAL DATA RBS 6000
2.1 System GSM / 3G / 4G-LTE G900/U900/L800 MHz
2.2 RBS Type ENCLOSURE 6150
2.3 No. of Cells 3
2.4 No. of radio cabinets to install 1
2.5 Configuration 900 Mhz CELL A: 4 CELL B: 4 CELL C: 4
Configuration 3G/4G Mhz CELL A: U900/L800/L2600
CELL B: U900/L800/L2600
CELL C: U900/L800/L2600
2.6 No. of DU/ No. of Baseband 1
No. of RRU 2279 B8B20 (900/800Mhz) 3
2.7 No. of RRU 4415 B7 (2600Mhz) N/A
2.8 Floor load for one radio cabinet (fully eq.) 0.91 sqm at 330 kg
3 ELECTRICAL DATA
3.1 Rectifier Type Emerson
3.2 Power Supply 200-250V AC supply
3.3 Power Consumption/radio cab. (fully eq.) 6000W
4 ANTENNAS AND OPTICAL FIBER CABLE
4.1 Antenna height (m.a.g.l.) CELL A: 50 CELL B: 50 CELL C: 50
4.2 Antenna directions (º) CELL A: CELL B: CELL C:
4.3 Mechanical downtilt (º) CELL A: CELL B: CELL C:
4.4 Electrical downtilt G900Mhz (º) CELL A: CELL B: CELL C:
Electrical downtilt U900Mhz (º) CELL A: CELL B: CELL C:
Electrical downtilt L800Mhz (º) CELL A: CELL B: CELL C:
Antennas Product Code CELL A: CELL B: CELL C:
Antennas Type (Dual/Quad/Hexa?)
4.5 No. of feeders/fibers 3
4.6 Total Cable Tray length (m) 10
4.7 Fiber length (m) CELL A: 70/100/150 CELL B: 70/100/150 CELL C: 70/100/150
4.9 Optical Fiber type 6F 3LCD-3FullAxs SM
5 ANTENNA SUPPORT STRUCTURE
5.1 Type of tower/mast Greenfield/Rooftop SST / GT
5.1 Building Height(m)
5.2 Tower/mast/structure height(m) 60
5.3 Leg profile L/O
6 TRANSMISSION (N/A)
6.1 Type of media for Abis links(IP) Huawei
6.2 Type of connection Ethernet
TEST REPORT ( 2G/3G/4G) 1(6)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 1/153 83-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM (Faladema Talaki) 2022-08-07 A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site: COME_7 Site Type: 193 EXT L800
NE Commissioning
Date: Site name: COME_7
Site No.: COME_7 Sector Configuration:
RBS Type: Testers Name:
NE Standalone test OK NOK N/A Remarks
Cable connections inspected
System voltage verified
Fault status read
External alarms tested
Internal alarm (Fan) tested
Battery back-up tested
Antenna System Test Record
Notes:
2.6. CABINET CONFIGURATION
OK N/A Remark
2.6.1. RBS cabinet type c c
`
2.6.2. Software Package Revision c c
2.6.3. RBS Hardware Configuration c c
2.6.4. IP Setting c c
2.6.5. Number of Sector c c
2.6.6. Number of Frequency Carrier c c
2.6.9. ASC Parameter c c
2.6.10. Rx Diversity c c
2.6.11 External Alarm c c
2.7. FAULT STATUS READING
OK N/A
RBS faults status c c
(should be no alarm faults)
2.8.. INTERNAL ALARM/FAN CHECK
OK N/A
TURN OFF the FAN and check RBS faults c c
(alarm fault should be appearing)
TEST REPORT ( 2G/3G/4G) 1(1)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 3/153 83-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM (Faladema Talaki) 2022-08-07 A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site: COME_7
2.9.Test Record for Antenna System Tests
Date: Site name: COME_7
Site No.: COME_7 Sector Configuration:
RBS Type: Testers Name:
2.10.Installation Check
Sector A Sector B Sector C
Antenna Azimuth degrees
Antenna Mechanical Tilt degrees
Antenna Electrical Tilt 2G degrees
3G degrees
4G degrees
VSWR Values Sector A Sector B Sector C
Limit 1.4 GU900_L800
N/A
Remarks:
Signatures
Responsible for the record Date: ……………………… Name:………………………………
Customer Date: ……………………… Name:………………………………
Remarks:
ALLOCATION TABLE: ALARMS 1(1)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 193 19-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM (Faladema Talaki) 2022-08-07 A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site: COME_7
Site Type: 193 EXT L800
ALARM DESIGNATION
Info Inlet Usage ID Alarm Description Type Severity
Internal Alarm 3 BATTERY_LOW_VOLTAGE Level 1
Internal Alarm 4 RECTIFIER_MODULE_FAILURE Level 1
SAU 0/1 External Alarm 0 MAIN_AC_FAILURE Major Level 1
SAU 0/2 External Alarm 1 FIRE_DETECTION Level 1
SAU 0/3 External Alarm 2 BEACON_FAILURE Level 1
SAU 0/5 External Alarm 3 BBS DOOR Level 1
SAU 0/6 External Alarm 4 BBS CLU ALARM Level 1
Level 1: Critical
Level 2: Minor
Type: is either 'Closing' or 'Breaking'
All relays open means: DC power supply fails
Alarm Description Comment
BATTERY_LOW_VOLTAGE Battery Back up capacity reduce
RECTIFIER_MODULE_FAILURE Mains AC PSU Failure
GENERATOR IN SERVICE
GENERATOR FAULTY
HIGH TEMPERATURE
TMR ALARM
Alarm Plinth / Slots Branch / Color
Alarm 01
Alarm 02
Alarm 03
Alarm 04
Alarm 05
Alarm 06
Alarm 07
Alarm 08
Alarm 09
Alarm 10
Alarm 11
Alarm 12
Alarm 13
Alarm 14
Alarm 15
Alarm 16
Signatures
Responsible for the record Date: ……………………… Name:……………………………
Customer Acceptance Date: ……………………… Name:…………………………..
191
53 Yellow
Blue
Black
Red
Brown
Green
White
Orange
White 1 444
37
2037
Front
pol View
contact
19 13.
3.
12.
15.
14.
29.
8.
7.
6.
5.
11.
16.
1.
4.
10.
.
CHECK LIST (Indoor/Outdoor) 1(4)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 2/153 11-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM Faladema TALAKI 2022-08-07 A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site: COME_7 Site Type: 193 EXT L800
INDOOR/OUTDOOR INSTALLATION CHECK LIST
OK = Correctly installed
NOK = Not OK
N/A = Not applicable
A. MECHANICAL INSTALLATION OK NOK N/A COMMENTS
1 Distribution Unit, Includes DC Circuit Breakers
2 Earth Collection Bar, ECB
B. EARTHING INSTALLATION AND
OK NOK N/A COMMENTS
CONNECTION
1 Mains Earth with Earth Potential Bar
2 Earth Cable 35 mm²
C. CABINET INSTALLATION AND
OK NOK N/A COMMENTS
CONNECTION
1 Verify Cabinet Configuration with Data Sheet
6 Screw Fixed
7 Dummy Fronts Installed
8 Internal Cables
17 Fan Unit Installation
18 Cables Labelled
D. EQUIPMENT FOR PROTECTION AGAINST
OK NOK N/A COMMENTS
AC- POWER LINE DISTURBANCE
1 Extension Rack
4 AC Distribution Board
5 Primary Protection
6 Secondary Protection
`
E. FOLLOWING - UP ROUTINES OF
OK NOK N/A COMMENTS
RBS INDOOR
4 Labeling of the external cables
5 Painting of cabinet scratching
6 Record the AC voltage level to the cabinet
7 Record the DC voltage level to the battery
8 Record the bar codes
9 Site area cleaned
10
I. FOLLOWING - UP ROUTINES OF
OK NOK N/A COMMENTS
RBS OUTDOOR
1 Antenna placement information, as-built
2 Record of antenna Site Master test
3 Antenna mounting and orientation
4 Antenna grounding
5 External jumpers connected
6 Feeder cables fitted into clamps holes and straight
7 Feeder cables grounding
8 Cables labeled
9 Site area cleaned
10
CHECK LIST (Indoor/Outdoor) 4(4)
Prepared (also subject responsible if other) Document No.
Jean-marie Adjolou 2/153 11-IPA Uen
Doc respons/Approved Checked Date Rev. Site ID
MMEA NEW BU PO WAM Faladema TALAKI A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site: COME_7
Site Type: 193 EXT L800
A. POWER STATUS ON SITE OK NOK N/A COMMENTS
1 Battery Back-up System
2 Number of Batteries installed on site
2.1 Number of Batteries in the Enclosure 6150
(Mention below each Battery's Serial Number)
2.1.1 -
2.1.2 -
2.1.3 -
2.1.4 -
2.1.5 -
2.1.6 -
2.1.7 -
2.1.8 -
2.2 Number of Batteries in the BBS
(Mention below each Battery's Serial Number)
2.2.1 -
2.2.2 -
2.2.3 -
2.2.4 -
2.2.5 -
2.2.6 -
2.2.7 -
2.2.8 -
2.2.9 -
2.2.10 -
2.2.11 -
2.2.12 -
All installation activities have been completed [ NO ] [ YES ] (if no, specify below)
Problems/Comments (Refer to applicable activity numbers)
Responsible Engineer/Supervisor........…............................. Date:...........…….…..…….………..
Customer signature..............…...…..................................... Date:...........…….…..…….………..
Preliminary Acceptance Test 2G/3G/4G 1(2)
Prepared (also subject responsible if other) No.
Jean-marie Adjolou 179 61-IPA Uen
Approved Checked Date Rev Site ID
MMEA NEW BU PO WAM Faladema TALAKI 2022-08-07 A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site type: 193 EXT L800
Notification of Preliminary Acceptance Test (PAT)
The below specified Network Elements/links/others are ready for PAT and MOOV AFRICA -BENIN inspection:
Responsible Vendor: ERICSSON
(Vendor, Name)
Project Scope: 193 EXT L800
Site Name: COME_7
Site Address: Region MONO
Date and Time for Planned PAT:
This PAT considers the following:
Test Equipment Used during the PAT
Test equipment used name and S/N number Calibration Date:
1
2
3
4
5
RADIO ACCEPTANCE TEST has been completed with the following result:
ACCEPTED
ACCEPTED WITH PENDING
REJECTED
Preliminary Acceptance Test 2G/3G/4G 2(2)
Prepared (also subject responsible if other) No.
Jean-marie Adjolou 179 61-IPA Uen
Approved Checked Date Rev Site ID
MMEA NEW BU PO WAM Faladema TALAKI 2022-08-07 A COME_7
Project: MOOV AFRICA BENIN_CAPEX 2022
Site type: 193 EXT L800
Outstanding Items List
The outstanding item has to be completed before the site is ready for acceptance.
Item
Description Severity Responsible Cleared (Date)
no.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Commitment to clear these issues: Critical : 72 hours
Major : 5 days
Minor : 1 month
Agreed Outstanding Items List (to be signed at RFS testing)
Moov Africa -Benin Representative:
Name & Signature: Date:
Moov Africa -Benin Representative:
Name & Signature: Date:
Ericsson MS Supervisor:
Name & Signature: Date:
All Outstanding Items noted above have been cleared in accordance with the contract
Moov Africa -Benin Representative:
Name & Signature: Date:
Ericsson Project Supervisor:
Name & Signature: Date:
Ericsson MS Supervisor:
Name & Signature: Date:
FINAL ACCEPTANCE CERTIFICATE
Contract between Atlantique Telecom / Moov Africa - Benin and Ericsson
Radio Site: COME_7 - 193 EXT L800
This Final Acceptance Certificate (FAC) certifies that the Contractor has fulfilled the
scope of supply and other obligations in order to reach Acceptance as specified in
the Contract.
Acceptance has been performed in accordance with the conditions defined in the
Contract and as detailed in the Acceptance Plans.
The supplied System is suitable to be placed into service or (Soft Launch).
The Preliminary Acceptance Certificate (PAC) milestone is passed.
Any remaining outstanding items are not of sufficient severity to delay passing the
FAC milestone or to prevent payments as defined in the Contract.
Warranty period as defined in the Contract commences from the date of this
certificate.
Issued at ……………………. on the …………… day of ……………………, 2022, which
is the Date of Final Acceptance.
This Certificate has been duly signed by the Parties in two (2) originals and the
Parties have taken one each.
For: Moov Africa Benin (Buyer) For: Ericsson (Contractor)
(Contract responsible) (Contract responsible)
Name: ……………………….. Name: ………………………..
Position: …………………….. Position: ……………………..
Name: ………………………..
Position: ……………………..