This document provides a layout of the power wiring system for the transformer room of Lao Brewery Company Ltd. Key details include: - A 1,200x1,000mm opening (OAG) for the transformer room - A 1,600 KVA transformer - A single switch on the wall to control the transformer room - Wiring diagrams showing the connections for an exhaust fan, supply fan, shutter door, and non-fuse safety switch - Information on the companies involved in the construction including Architype, Archineerss, Pasashok Construction, and Comin Asia.

Uploaded by

Comin Asia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Transformer

This document provides a layout of the power wiring system for the transformer room of Lao Brewery Company Ltd. Key details include: - A 1,200x1,000mm opening (OAG) for the transformer room - A 1,600 KVA transformer - A single switch on the wall to control the transformer room - Wiring diagrams showing the connections for an exhaust fan, supply fan, shutter door, and non-fuse safety switch - Information on the companies involved in the construction including Architype, Archineerss, Pasashok Construction, and Comin Asia.

Uploaded by

Comin Asia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Xref .\X-ref_Transformer Plan_200810.

dwg

Lao Brewery Company Ltd. (LBC)


KM.12 THADEUA, HATSAYFONG DISTRICT,
Vientiane, Lao P.D.R
E-Mail : [email protected]

OAG 1,200x1,000mm (WxL)

MRU

1600 KVA transformer

EF-TR-01 GROUP

230V-2.9A
Architype Construction & Consultants
TRANSFORMER ROOM
1 SWITCH ON THE WALL (Thailand) Co.,Ltd.
140/49-50, 22nd FLOOR, ITF TOWER
SILOM ROAD, SURIYAWONG, BANGRAK
AREA 51 m2 BANGKOK, THAILAND 10500
Tel: +66 (0) 2 643 0031
[email protected] - www.architype-group.com
CONNECT WITH
SHUTTER DOOR CIRCUIT
F1
J GL
EF1 FOR EF-TR-01

LAYOUT OF POWER WIRING SYSTEM TRANSFORMER ROOM

House No.571, Unit01, Sapangmor Village,


Saysettha District, Vientiane, Lao PDR
Tel : (+856-20) 454354
E-mail : [email protected]

PASASHOK
CONSTRUCTION

RECEPTACLE SYSTEM
Pasashok Construction Co.,Ltd.
Ban Gangpayang, Hatsayfong District, Vientiane, Laos
Mobile: +85620 58859897
SYMBOL DESCRIPTION E-Mail : [email protected]

AIR CONDITIONING MOTOR CONTROL CENTER (AMCC)


Comin asia
J JUNCTION BOX FOR EXHAUST FAN 1 PH VIENTIANE OFFICE
EF1 T2 Asean Roadm, Unit 08,Wattaiyauthong Village,
Sikhottabong District,Vientiane Capital, Lao PDR
Tel : +856 30 7774 77
Email: [email protected]
J JUNCTION BOX FOR EXHAUST FAN 3 PH
EF3

J JUNCTION BOX FOR SUPPLY FAN 3 PH


OF3

J JUNCTION BOX FOR SHUTTER DOOR 3 PH


SH3

NON FUSE SAFETY SWITCH 3 PH (HEAVY DUTY TYPE)

F1
2xCU/PVC 2.5Sq.mm. CU/PVC 2.5Sq.mm. IN CONDUIT EMT Ø15mm.
SHOP DRAWING