RAF-917-10-36-P218 - 7UT613 SAT FORMAT - Annexure 2
RAF-917-10-36-P218 - 7UT613 SAT FORMAT - Annexure 2
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
5 Visual Check…………………………………………………………………………………………….. 04
7.1. CT Measurement………………………………………………………………………………. 05
7.2. VT Measurement……………………………………………………………………………… 06
8 Differential Protection……………………………………………………………………………… 07
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 1 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
16 Functional Check………………………………………………………………………………………… 17
17 Instruments Used……………………………………………………………………………………. 17
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 2 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
1. RELAY DETAILS:
Make : SIEMENS Relay Designation :
MLFB : Firmware Version :
Nominal Current : 1.0 Amp Parameter set Version :
Relay Sl.No. : BF.Nr: Auxiliary Volt. : 110V DC
IP Address : Rated Frequency :
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 3 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 4 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
7.1. CT Measurement:
Inject current in the relay as per the table below and observe the reading on the relay display, in
secondary values and in primary values.
Injected at Side 1
R-E 1.0
Y-E 1.0
B-E 1.0
R-Y 1.0
Y-B 1.0
B-R 1.0
R-Y-B 1.0
Injected at Side 2
R-E 1.0
Y-E 1.0
B-E 1.0
R-Y 1.0
Y-B 1.0
B-R 1.0
R-Y-B 1.0
Acceptance Norm
Primary current value should be as per CT primary ratio.
Tolerance ±5%
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 5 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
7.2. VT Measurement :
Inject voltage in the relay as per the table below and observe the reading on the relay display, in
secondary values and in primary values.
R-E
Y-E
B-E
R-Y
Y-B
B-R
R-Y-B
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 6 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Current of Amp in HV side and Amp injected in LV Side respectively. The differential and
restraining currents observed in both HV & LV Side of the relay.
I diff. %
R-E
I rest. %
I diff. %
Y-E
I rest. %
I diff. %
B-E
I rest. %
I diff. %
R-Y
I rest. %
I diff. %
Y-B
I rest. %
I diff. %
B-R
I rest. %
I diff. %
R-Y-B
I rest. %
Acceptance Norm
Tolerance ±1.0% of calculated value or I nominal.
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 7 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Expected Actual
Expected Actual Expected Actual Expected Actual
Trip Trip
Pickup Pickup Drop-out Drop-out Trip Trip
Fault Type Time at Time at
Current Current Current Current Current Current
2xItrip 2xItrip
(A) (A) (A) (A) (A) (A)
(msec) (msec)
Y-E
B-E
R-Y 30msec
Y-B
B-R
R-Y-B
Y-E
B-E
R-Y 30msec
Y-B
B-R
R-Y-B
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 8 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Expected Actual
Expected Actual Expected Actual Expected Actual
Trip Trip
Pickup Pickup Drop-out Drop-out Trip Trip
Fault Type Time at Time at
Current Current Current Current Current Current
2xItrip 2xItrip
(A) (A) (A) (A) (A) (A)
(msec) (msec)
Injected at Side 1(HV Side)
R-E
Y-E
B-E
R-Y 20msec
Y-B
B-R
R-Y-B
Injected at Side 2 (LV Side)
R-E
Y-E
B-E
R-Y 20msec
Y-B
B-R
R-Y-B
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 9 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Idiff>>Set = 7.50I/InO
For test results please find omicron test kit results (Annexure ).
Acceptance Norm
Bias characteristic should be as per selected slope-1 and slope-2.
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 10 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Side on
Phase in Current 2nd Harmonic 2nd Harmonic
which
which current injected Content TRIP / BLOCK Content TRIP / BLOCK
Current
injected (Amps) (%) (%)
injected
R-E 1.0 Trip Block
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 11 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
I diff %
R-Y-B
I rest %
I diff %
R-Y-B
I rest %
8.7.V/F Protection:
8.7.1.V/F Protection:
24-1 V/f Pickup : 1.10 24-1 V/f Time Delay : 5.0 Sec
24-2 V/f Pickup : 1.40 24-2 V/f Time Delay : 1.0 Sec
Applied Time
Applied Freq Measured Measured Time
V/F Alarm setting voltage in Setting
in Hz Pick Up in Sec
V in sec
Stage -1
63.51 50 5.0
Stage -2
63.51 50 1.0
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 12 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
9. OVERCURRENT PROTECTION:
(Assigned to Side 1)
9.1. Definite Time 50(N):
Acceptance Norm
Pickup Value 1.0 · Ip and Drop out Value approx. 0,95 for I/INom ≥ 0.30
Tolerance for Pickup/Drop out ±3 % of setting value or 1% of INom
Trip Time Tolerance ±1 % or 10 ms
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 13 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Acceptance Norm
Pickup Value approx. 1.10 · Ip and Drop out Value approx. 0.90 · Ip setting value (With Disk Emulation)
Tolerance for Pickup/Drop out ±3 % of setting value or 1% of INom
Trip Time Tolerance ±1 % of reference (calculated) value, or 10 ms
Y 2.00 17.26
B 2.50 10.46
Acceptance Norm
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 14 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
BI01 Spare
BI03 Spare
BI04 Spare
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 15 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
F2 Measurements Primary
F3 Last Fault
F4 I Diff. / I Rest.
Digsi Online -> Test Fault Record -> Open Last recorded file and check the following signals are configured.
4 87-2 Trip
5 87 Trip L1
6 87 Trip L2
7 87 Trip L3
8 87 is Blocked
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 16 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:
NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :
Functional Check:
SL. No. Function Description Tested( ) Remarks
Test Block Operation checked for CT Shorting
16.2. Test Switch Operation checked for tripping isolation
16.3. Final Settings downloaded to Relay after Test
16.4. Relay found healthy
Secondary
1. Omicron / CMC
Injection Kit
2. Multimeter Fluke
Remarks:
Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 17 of 17