RAF-917-10-36-P218 - 7UT613 SAT FORMAT - Annexure 2

This document provides a test format for a transformer differential relay. It outlines 17 sections to test the relay, including: 1. Checking relay details and power system data 2. Performing visual checks and watchdog contact tests 3. Testing measured current and voltage values 4. Testing the differential protection and various characteristics 5. Testing backup overcurrent protection and thermal overload protection 6. Testing binary inputs, outputs, LED indications, function keys and fault recordings 7. Noting the instruments that will be used for the testing The test aims to fully verify the protection, operation, and performance of the transformer differential relay.

Uploaded by

SARAVANAN A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
451 views17 pages

RAF-917-10-36-P218 - 7UT613 SAT FORMAT - Annexure 2

This document provides a test format for a transformer differential relay. It outlines 17 sections to test the relay, including: 1. Checking relay details and power system data 2. Performing visual checks and watchdog contact tests 3. Testing measured current and voltage values 4. Testing the differential protection and various characteristics 5. Testing backup overcurrent protection and thermal overload protection 6. Testing binary inputs, outputs, LED indications, function keys and fault recordings 7. Noting the instruments that will be used for the testing The test aims to fully verify the protection, operation, and performance of the transformer differential relay.

Uploaded by

SARAVANAN A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 17

SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)

CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

Sr.No Description Page No

1 Relay Details ……………………………………………………………………………………………. 03

2 Relay Power system data: Transformer…………………………………………………... 03

3 Relay Power system data: Current Transformer………………………………….... 02

4 Nominal Current Of Transformer …………………………………………………………… 04

5 Visual Check…………………………………………………………………………………………….. 04

6 Watchdog Contact Checks……………………………………………………………………….. 04

7 Measured Value Test……………………………………………………………………………….. 05

7.1. CT Measurement………………………………………………………………………………. 05

7.2. VT Measurement……………………………………………………………………………… 06

8 Differential Protection……………………………………………………………………………… 07

8.1. Differential and Restrain value measurement………………………………… 07

8.2. 87-1 Pickup and Timing Test ………………………………………………………… 08

8.3. 87-2 Pickup and Timing Test……………………………………………………………. 09

8.4. Bias Characteristics Test ………………………………………………………………….. 10

8.5. Harmonics Restrain Test …………………………………………………………………… 11

8.5.1. 2nd Harmonics Restrain Test …………………………………………………… 11

8.5.2. 5th Harmonics Restrain Test……………………………………………………… 11


8.6. Stability Test…………………………………………………………………………………….. 12
8.7. V/F Protection…………………………………………………………………………………….. 12
81 V/F Protection………………………………………………………………………….. 12
82 V/F Characteristics…………………………………………………………………… 13

9 Back Up Over Current Protection Test……………………………………………………. 13

9.1. Definite Time (50/50N)……………………………………………………………………. 14

9.2. Inverse Time (51/51N)…………………………………………………………………….. 14

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 1 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

10 Thermal Over Load Protection…………………………………………………………………. 14

11 Binary Inputs Test…………………………………………………………………………………. 15

12 Binary Outputs Test………………………………………………………………………………… 15

13 LED Indication Test………………………………………………………………………………… 15

14 Function Key Test…………………………………………………………………………………… 16

15 Fault Recorder Signals……………………………………………………………………………. 16

16 Functional Check………………………………………………………………………………………… 17

17 Instruments Used……………………………………………………………………………………. 17

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 2 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

Transformer Differential Protection – 7UT (2 Winding)

1. RELAY DETAILS:
Make : SIEMENS Relay Designation :
MLFB : Firmware Version :
Nominal Current : 1.0 Amp Parameter set Version :
Relay Sl.No. : BF.Nr: Auxiliary Volt. : 110V DC
IP Address : Rated Frequency :

2. RELAY POWER SYSTEM DATA: TRANSFORMER


Rated Primary Voltage Side 1 : kV
Rated Apparent Power of Trafo. Side 1 : MVA
Star Point of Side 1 is :
Transf. Winding Connection Side 1 :
Rated Primary Voltage Side 2 : kV
Rated Apparent Power of Trafo. Side 2 : MVA
Star Point of Side 2 is :
Transf. Winding Connection Side 2 :

3. RELAY POWER SYSTEM DATA: CT’s


CT-Strpnt.Meas.Loc.1 in Dir.of Object : YES
CT Rated primary current Meas.Loc 1 :
Amps
CT Rated sec. current Meas.Loc 1 : 1.0 Amp
CT-Strpnt.Meas.Loc.2 in Dir.of Object : YES
CT Rated primary current Meas.Loc 2 :
Amps
CT Rated sec. current Meas.Loc 2 : 1.0 Amp

4. NOMINAL CURRENT OF TRANSFORMER:


Primary Secondary
Nominal Current of Transf. Side 1 : A
A
Nominal Current of Transf. Side 2 : A
A

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 3 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

5. VISUAL CHECK: Tested ( )

Inspect for no physical damage. :


Verify the wiring connection as per approved drawing. :
Confirm that only ring type Lugs are used for all CT. :
Relay case connected to a local earth bar. :
Confirm the LED & Function Key Labels are provided. :
Check that Serial no. of relay matching with serial no. of case :

6. WATCHDOG CONTACT CHECKS:


Supply OFF- F3 & F5 Terminals are Closed :
Supply ON- F3 & F5 Terminals are Open :

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 4 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

7. MEASURED VALUE TEST :

7.1. CT Measurement:

Inject current in the relay as per the table below and observe the reading on the relay display, in
secondary values and in primary values.

Primary current read on relay Secondary current read on relay


Current display in A (Side 1) / kA (Side 2) display in Amp
Phase injected
injected (Amps) IR IY IB 3I0 IR IY IB 3I0

Injected at Side 1

R-E 1.0

Y-E 1.0

B-E 1.0

R-Y 1.0

Y-B 1.0

B-R 1.0

R-Y-B 1.0

Injected at Side 2

R-E 1.0

Y-E 1.0

B-E 1.0

R-Y 1.0

Y-B 1.0

B-R 1.0

R-Y-B 1.0

 Acceptance Norm
Primary current value should be as per CT primary ratio.
Tolerance ±5%

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 5 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

7.2. VT Measurement :
Inject voltage in the relay as per the table below and observe the reading on the relay display, in
secondary values and in primary values.

Primary voltage read on relay Secondary voltage read on relay


Voltage display in V display in V
Phase injected
injected (V) UL1 UL2 UL3 N UL1 UL3 UL3 N

R-E

Y-E

B-E

R-Y

Y-B

B-R

R-Y-B

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 6 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8. DIFFERENTIAL PROTECTION (87T):

8.1. Differential and Restrain Value Measurement:

Current of Amp in HV side and Amp injected in LV Side respectively. The differential and
restraining currents observed in both HV & LV Side of the relay.

Fault I Diff / Injection in Side 1(HV Side) in % Injection in Side 2 ( LV Side) in %


Type *I Rest.
R Y B 3I0 R Y B 3I0

I diff. %
R-E
I rest. %

I diff. %
Y-E
I rest. %

I diff. %
B-E
I rest. %

I diff. %
R-Y
I rest. %

I diff. %
Y-B
I rest. %

I diff. %
B-R
I rest. %

I diff. %
R-Y-B
I rest. %

 Acceptance Norm
Tolerance ±1.0% of calculated value or I nominal.

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 7 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8.2. 87-1 Pickup and Timing Test:

Setting for 87-1 Pick-Up = 0.30 x I/InO


HV = 0.30 x = A
LV = 0.30 x = A
T I-Diff> Time Delay setting = 0.00 sec
Expected Trip Current (HV, Phase – Neutral) = (87-1 setting) x 1
Expected Trip Current (HV, Phase – Phase) = (87-1 setting) x 1
Expected Trip Current (LV, Phase – Neutral) = (87-1 setting) x 1.732
Expected Trip Current (LV, Phase – Phase) = (87-1 setting) x 0.866
Expected Trip Current (LV, Three Phase) = (87-1 setting) x 1
Expected Pickup Current = 0.85 x Expected Trip Current
Expected Dropout Current = 0.70 x Expected Trip Current
Idiff Trip = Idiff> set X Kvg X I tx rated / I ct primary

Expected Actual
Expected Actual Expected Actual Expected Actual
Trip Trip
Pickup Pickup Drop-out Drop-out Trip Trip
Fault Type Time at Time at
Current Current Current Current Current Current
2xItrip 2xItrip
(A) (A) (A) (A) (A) (A)
(msec) (msec)

Injected at Side 1 (HV Side)


R-E

Y-E

B-E

R-Y 30msec

Y-B

B-R

R-Y-B

Injected at Side 2 (LV Side)


R-E

Y-E

B-E

R-Y 30msec

Y-B

B-R

R-Y-B

Acceptance Norm: Pickup Tolerance ±5 % of setting value; Trip Time 30 ms Typical

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 8 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8.3. 87-2 Pickup and Timing Test:

Setting for 87-2 Pick-Up = 1.00 x I/InO


HV = 1.00 x = A
LV = 1.00 x = A
T I-Diff>> Time Delay setting= 0.00 sec
Expected Trip Current (HV, Phase – Neutral) = (87-2 setting) x 1
Expected Trip Current (HV, Phase – Phase) = (87-2 setting) x 1
Expected Trip Current (LV, Phase – Neutral) = (87-2 setting) x 1.732
Expected Trip Current (LV, Phase – Phase) = (87-2 setting) x 0.866
Expected Trip Current (LV, Three Phase) = (87-2 setting) x 1
Expected Pickup Current = 0.85 x Expected Trip Current
Expected Dropout Current = 0.70 x Expected Trip Current
Idiff Trip = Idiff>> set X Kvg X I tx rated / I ct primary

Expected Actual
Expected Actual Expected Actual Expected Actual
Trip Trip
Pickup Pickup Drop-out Drop-out Trip Trip
Fault Type Time at Time at
Current Current Current Current Current Current
2xItrip 2xItrip
(A) (A) (A) (A) (A) (A)
(msec) (msec)
Injected at Side 1(HV Side)
R-E
Y-E
B-E
R-Y 20msec
Y-B
B-R
R-Y-B
Injected at Side 2 (LV Side)
R-E

Y-E
B-E
R-Y 20msec

Y-B
B-R
R-Y-B

Acceptance Norm: Pickup Tolerance ±5 % of setting value; Trip Time 11 ms Typical

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 9 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8.4. Bias Characteristics Test:

Idiff>Set = 0.30 I/InO


Slope 1 set = 0.25
Base Point 1 Set = 0.00 I/In
Irest. Calculated Start Point of Slope 1 = 1.2
Idiff. Calculated Start Point of Slope 1 = 0.3

Slope 2 Set = 0.50


Base Point 2 Set = 2.50 I/In
Irest. Calculated Start Point of Slope 2 = 5.0
Idiff. Calculated Start Point of Slope 2 = 1.25

Idiff>>Set = 7.50I/InO

For test results please find omicron test kit results (Annexure ).

 Acceptance Norm
Bias characteristic should be as per selected slope-1 and slope-2.

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 10 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8.5. HARMONICS RESTRAINT TEST:

8.5.1. 2nd Harmonic Restraint:

Setting of 87-2nd Harmonic Content in I-DIFF = 10 %


Inject current greater than 87-1 setting; first with harmonic content less than setting, then with
harmonic content greater than setting; verify 87-1 operation / blocking:

Side on
Phase in Current 2nd Harmonic 2nd Harmonic
which
which current injected Content TRIP / BLOCK Content TRIP / BLOCK
Current
injected (Amps) (%) (%)
injected
R-E 1.0 Trip Block

Y-E 1.0 Trip Block


Side 1
(HV)
B-E 1.0 Trip Block

R-Y-B 1.0 Trip Block

Check cross block Time: _ _ _ _ _ msec

8.5.2. 5th Harmonic Restraint:

Setting of 87-nth Harmonic Restraint = 5.Harmonic


Setting of 87-nth Harmonic Content in I-DIFF = 25 %
Inject current greater than 87-1 setting; first with harmonic content less than setting, then with
harmonic content greater than setting; verify 87-1 operation / blocking :
Side on
Phase in Current 5th Harmonic 5th Harmonic
which
which current injected Content TRIP / BLOCK Content TRIP / BLOCK
Current
injected (Amps) (%) (%)
injected
R-E 1.0 Trip Block

Y-E 1.0 Trip Block


Side 1
(HV)
B-E 1.0 Trip Block

R-Y-B 1.0 Trip Block

Check cross block Time: _ _ _ _ _ msec


 Acceptance Norm
87-1 will operate if harmonic content more than setting and it will block if harmonic content less than
setting.
L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA
Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 11 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8.6. Stability Test:

8.6.1. External through fault:

Transformer Rated Current of A on HV Side-1and A on LV Side-2 with 1500 phase shift


between the two currents. The differential and restraining currents are observed in both the relays.

Fault Type I Diff / *I Rest. R Y B 3I0

I diff %
R-Y-B
I rest %

8.6.2. In-Zone fault:

Transformer Rated Current of A on HV Side-1and A on LV Side-2 with with 00 phase


shift between the two currents. The differential and restraining currents are observed in both the relays .

Fault Type I Diff / *I Rest. R Y B 3I0

I diff %
R-Y-B
I rest %

8.7.V/F Protection:

8.7.1.V/F Protection:

Note: This is only used as Alarm Purpose only.

24-1 V/f Pickup : 1.10 24-1 V/f Time Delay : 5.0 Sec

24-2 V/f Pickup : 1.40 24-2 V/f Time Delay : 1.0 Sec

Applied Time
Applied Freq Measured Measured Time
V/F Alarm setting voltage in Setting
in Hz Pick Up in Sec
V in sec
Stage -1
63.51 50 5.0
Stage -2
63.51 50 1.0

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 12 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8.7.2. V/F Trip Characteristic :

Applied Applied Freq in Time Setting Measured Time


V/F Trip setting
voltage in V Hz in sec in Sec
1.05 63.51 47.62 60
1.10 63.51 45.45 40
1.15 63.51 43.48 30
1.20 63.51 41.67 20
1.25 63.51 40.00 10
1.30 63.51 38.46 5
1.35 63.51 37.04 2
1.40 63.51 35.71 1

9. OVERCURRENT PROTECTION:

(Assigned to Side 1)
9.1. Definite Time 50(N):

50-1 Pickup Setting (A): 1.50 Delay Setting (s): 1.00


50N-1 Pickup Setting (A): 0.20 Delay Setting (s): 1.00
50-2 Pickup Setting (A): 2.00 Delay Setting (s): 0.50
50N-2 Pickup Setting (A): 0.60 Delay Setting (s): 0.50

50-1/ 50-1/ 50-1/ 50-2/


50-2/ 50-2/50N-2
50N-1 50N-1 Actual 50N-1 Actual 50N-2 Actual
50N-2 Actual Actual Trip
Phase Actual Pickup Drop Out Trip Time @ Drop out
Pickup current Time @2 x
current current 2 x setting current
(A) setting (sec)
(A) (A) (sec) (A)
R

 Acceptance Norm
Pickup Value 1.0 · Ip and Drop out Value approx. 0,95 for I/INom ≥ 0.30
Tolerance for Pickup/Drop out ±3 % of setting value or 1% of INom
Trip Time Tolerance ±1 % or 10 ms

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 13 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

9.2 Inverse Time 51(N):

51 Pickup Setting (A): 1.00 Time Dial Setting: 0.60


51N Pickup Setting (A): 0.60 Time Dial Setting: 0.60
IEC Curve : Normal Inverse

Actual Operating Time (s) Operating Time (s) Operating Time(s)


Actual Drop
Pickup @ 2 x Setting @ 5 x Setting @ 10 x Setting
Phase out current
current
(A) Calculated Measured Calculated Measured Calculated Measured
(A)
R 6.017 2.568 1.782

Y 6.017 2.568 1.782

B 6.017 2.568 1.782

N 6.017 2.568 1.782

 Acceptance Norm
Pickup Value approx. 1.10 · Ip and Drop out Value approx. 0.90 · Ip setting value (With Disk Emulation)
Tolerance for Pickup/Drop out ±3 % of setting value or 1% of INom
Trip Time Tolerance ±1 % of reference (calculated) value, or 10 ms

10. THERMAL OVER LOAD PROTECTION:


Assigned to Side 2
K-Factor : 1.0
Thermal Time Constant : 1.0 min.
Thermal Overload Alarm : 90 %

Without Pre load Condition


Current Injected Thermal Overload
Phase Expected Trip Time Actual Trip Time
in Amp Alarm in %
in sec in sec
R 1.50 35.27

Y 2.00 17.26

B 2.50 10.46

 Acceptance Norm

Time Tolerance ±3 % or 1 s for I/(k ·INom) > 1.25;

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 14 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

11. BINARY INPUT:

Binary Input check:


Tested( ) Remarks
BI No. BI Assigned to as per approved Schematic drawings

BI01 Spare

BI02 Tx. Diff. Relay Test Block in Test Mode

BI03 Spare

BI04 Spare

BI05 Tx. Diff. Relay BI DC Supply Fail

12. BINARY OUTPUT:

Binary Output check:


BO No. BO Assigned to as per approved Schematic drawings Tested Resistance in Ω
BO1 Differential Protection Trip to HV Trip Coil 1
BO2 Not Applicable
BO3 Not Applicable
BO4 Differential Protection Trip to HV Gr A Trip Relay (86-1)
BO5 Differential Protection Trip to LV Trip Coil
BO6 Spare
BO7 Spare
BO8 Spare
Live Contact Relay Fail To BCU

13. LED INDICATION:

LED Indication check:


LED No. LED Assigned to as per approved Schematic drawings Tested Remarks
LED 1 87-1 Differential Trip Latched
LED 2 87-2 Differential Trip Latched
LED 3 Differential R Phase Trip Latched
LED 4 Differential Y Phase Trip Latched
LED 5 Differential B Phase Trip Latched
LED 6 Relay Pickup Latched

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 15 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

LED Indication check:

LED Indication check:


LED No. LED Assigned to as per approved Schematic drawings Tested Remarks
LED 7 Spare Un Latched
LED 8 Spare Un Latched
LED 9 Spare Un Latched
LED 10 Thermal OL Alarm Un Latched
nd
LED 11 2 Harmonic Blocked Latched
th
LED 12 5 Harmonic Blocked Latched
LED 13 Test Block in Test Mode Un Latched
LED 14 Relay BI DC Fail Un Latched

14. FUNCTION KEY:

Function Key check:


F.Key No. Function Key Assigned to Tested Remarks
F1 Event Log

F2 Measurements Primary

F3 Last Fault

F4 I Diff. / I Rest.

15. FAULT RECORDER SIGNALS:

Digsi Online -> Test Fault Record -> Open Last recorded file and check the following signals are configured.

Fault Recorder Signal check: (Minimum Requirement As Per KM Standard)


1 87 Picked up
2 87 General Trip
3 87-1 Trip

4 87-2 Trip

5 87 Trip L1

6 87 Trip L2

7 87 Trip L3
8 87 is Blocked

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 16 of 17
SITE ACCEPTANCE TEST FORMAT FOR TRANSFORMER DIFFERENTIAL RELAY – 7UT (2 Winding)
CLIENT: CONSULTANT: CONTRACTOR:

NEW 132 KV RAF-1 SUBSTATION AND ASSOCIATED WORKS FOR THE Contract No. : GTC/917/2018
REPLACEMENT OF RAF-A 132KV SWITCHYARD Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

Fault Recorder Signal check: (Minimum Requirement As Per KM Standard)


nd
9 87 Cross Block 2 Harmonic

Fault Recorder Signal check: (Minimum Requirement As Per KM Standard)


th th
10 87 Cross Block n Harmonic (5 Harmonic)
11 Time Over Current Pickup
12 Time Over Current Trip
13 49 Overload Alarm (Thermal OL Theta Alarm)

16. FUNCTIONAL CHECK:

Functional Check:
SL. No. Function Description Tested( ) Remarks
Test Block Operation checked for CT Shorting
16.2. Test Switch Operation checked for tripping isolation
16.3. Final Settings downloaded to Relay after Test
16.4. Relay found healthy

17. INSTRUMENTS USED:

Equipment Calibration due


Sl. No Description Make / Model Calibration date
Sl No. date

Secondary
1. Omicron / CMC
Injection Kit

2. Multimeter Fluke

Remarks:

L&T/ABB LAHMEYER INTERNATIONAL/ KAHRAMAA


Signature Signature

Name Name
Date Date
Doc.No. RAF-917-10-36-P218 Rev. 0 Page No. 17 of 17