0% found this document useful (0 votes)
72 views3 pages

Monthly Report Kaidah Pertambangan

Two incidents occurred in March 2022, one resulting in a lost time incident and one in property damage. A total of 62 safety interactions and 142 Take 5 sessions were conducted at the Kao Raha site. 83 workers and 63.78 manhours were recorded for March, with no positive alcohol or drug tests or additional safety trainings reported. The main news was not detailed.

Uploaded by

patrol 3mky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views3 pages

Monthly Report Kaidah Pertambangan

Two incidents occurred in March 2022, one resulting in a lost time incident and one in property damage. A total of 62 safety interactions and 142 Take 5 sessions were conducted at the Kao Raha site. 83 workers and 63.78 manhours were recorded for March, with no positive alcohol or drug tests or additional safety trainings reported. The main news was not detailed.

Uploaded by

patrol 3mky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

MONTHLY REPORT - HSE

Mont/Year: March 2022


Completed by: PT. GEO GEA MINERALINDO

ACCIDENTS, HPI, INCIDENTS OR NEAR MISSES


Date Summary Causes Related Actions Status

Decembe
January February March April May June July August September October November
Classification r
Fatality
Lost Time Incident
Alternative Work
Medical Treatment
First Aid 1
Property Damage 1
Near Misses
Unsafe acts/conditions
TOTAL: 2

SAFETY INTERACTIONS
Area January February March April May June July August September October November December
KAO RAHAI 42 56 62

TOTAL: 42 56 62

JSA (Job Safety Analyisis)


Area January February March April May June July August September October November December

TOTAL:
1
MONTHLY REPORT - HSE
TAKE 5
Januar Februar Marc
April May June July August September October November December
Area y y h
KAO RAHAI 190 142

TOTAL: 0 190 142

INSPECTIONS/AUDITS (internas o externas)


Date Name Comments / Actions / Recommendations
- ---- -----

MANPOWER
Manpower January February March April May June July August September October November December
WBN
Contractors 61 71 83
TOTAL: 61 71 83

MANHOURS
Manhours January February March April May June July August September October November December
WBN
63.78
Contractors 15.996 39.600
8
63.78
TOTAL:  15.996
39.600 8

ALCOHOL TESTS
Controls January February March April May June July August September October November December
(+) WBN
Contractors
WBN
(-) Contractors
TOTAL:

TOOLBOXES
NB OF TOOLBOXES
January February March April May June July August September October November December

TRAINING (Non including Toolboxes)


SUBJECTS

TRAINING MANHOURS

2
MONTHLY REPORT - HSE
January February March April May June July August September October November December

MAIN NEWS OF THE MONTH: