Schedule of Rates (SOR) for Kerala Projects -2022
VUP,LVUP,MNB & RCC
MNB/ROB/Interchange
BOX Structure,Box
FO/FO & Major Bridge
Culvert , Slab Culvert &
without backwater
HPC Culverts
With Without With Without
Sr.
No.
Description of Items Unit Shuttering Shuttering Shuttering Shuttering Remarks
Rate Rate Rate Rate
FOUNDATION:
Laying of Plain Cement Concrete, M-15 grade as per design mix provided by SCCPL at site, for the
foundation including preparation /dressing of bed, placing of concrete in position , Vibrating &
1 Cum 750 700 750 550
finishing, Fixing of centering & shuttering whereever required , including cost of shuttering oil /
foam / coverblock and curing up to the required time period including all tools and tackels complete
as per the instructions of the Enginer In-charge.
FOUNDATION:
Laying of Cement Concrete, Any grade as per design mix provided by SCCPL at site, (Cast - in
Situ) in Bottom Slab/Raft, Retaing wall foundation,Head Wall, Cut-off wall, Toe wall, Curtain
2 Wall Etc.,placing of concrete in position , Vibrating & finishing, Fixing of centering & shuttering, Cum 1700 1400 1400 900
including cost of shuttering oil / foam / coverblock ,Fixing & Cleaning of Chute / Concrete Pump /
Boom Placer Line including all tools and tackels complete as per the instructions of the Enginer In-
charge.
SUBSTURCTURE:
Laying of Cement Concrete, Any grade as per design mix provided by SCCPL at site, (Cast - in
Situ) in Wall / Pier /Abutment /Retaingwall up to the required Height, placing of concrete in
3 Cum 2200 1700 1800 1300
position , Vibrating & finishing,Fixing of centering & shuttering including cost of shuttering oil /
foam / coverblock , Fixing & Cleaning of Chute / Concrete Pump / Boom Placer Line, cleaning of
weep holes including all tools and tackels complete as per the instructions of the Enginer In-charge.
SUPERSTURCTURE:
Laying of Cement Concrete, Any Grade as per design mix provided by SCCPL at site, (Cast - in
Situ) in Pier / Abutment Cap & Pedestals ,placing of concrete in position , Vibrating &
4 Cum 2750 2000 NA NA
finishing, Fixing of centering & shuttering,fixing of drainage spout and utility pipe, Fixing &
Cleaning of Chute / Concrete Pump / Boom Placer Line, including all tools and tackels complete as
per the instructions of the Enginer In-charge.
SUPERSTURCTURE:
Laying of Cement Concrete, Any Grade as per design mix provided by SCCPL at site, (Cast - in
Situ) in Diaphram,Top slab & Retainer placing of concrete in position , Vibrating & finishing,
5 Cum 3000 2200 3000 2000
Fixing of centering & shuttering,fixing of drainage spout and utility pipe, Fixing & Cleaning of
Chute / Concrete Pump / Boom Placer Line, including all tools and tackels complete as per the
instructions of the Enginer In-charge.
SUPER STURCTURE (GIRDER):
All charges for laying controlled cement concrete of Required Grade as per design mix provided by
SCCPL at site, in Post Tensioned Precast I Girder in proper line and level with chute/ Concrete
stationery pump/Crane Bucket including Fixing & Cleaning of Chute / Concrete Pump / Boom
6 Cum 4000 3000 NA NA
Placer Line, including necessary casting trough, Fixing centering , formwork & shutter vibrators
including cost of shuttering oil / foam / coverblock , fixing of ducting pipes ,Anchor conc /
Bearing Template etc. including all tools and tackels complete as per the instructions of the Enginer
In-charge. Girder Shuttering and accessories to be provided by SCCPL.
Fixing of Modular strip seal expansion joints including all tools /tacels and consumables complete as
7 per the instructions of the Enginer In-charge. The Expansion joints shall be provided by SCCPL Rmt. 1000 900 NA NA
free of cost .
Steel Cutting / Bending & Fixing at site with binding wire along with cost of binding wire including
8 MT. 5700 5700 5700 5700
loading and unloading complete in all respect as per the instructions of the Enginer In-charge.
Fixing of already cut and bend reinforcement at site with binding wire along with cost of binding
9 wire including loading / unloading complete in all respect as per the instructions of the Enginer In- MT. 3700 3700 3700 3700
charge.
Laying in position controlled cement concrete of required grade as per design mix provided by
SCCPL at site (Cast - in Situ) in Reinforced Concrete Crash Barrier placing in position finishing,
vibrating, Fixing of centering & shuttering including cost of shuttering oil / foam / coverblock,
10 RMT. 1700 1400 1700 1400
Fixing & Cleaning of Chute / Concrete Pump / Boom Placer Line, and straightening, cutting,
bending , placing in position and binding of reinforcement including cost of binding wire including
all tools and tackels complete as per the instructions of the Enginer In-charge.
Laying in position controlled cement concrete of required grade as per design mix provided by
SCCPL at site (Cast - in Situ) in Approach Slab placing in position finishing, vibrating, Fixing
of centering & shuttering including cost of shuttering oil / foam / coverblock , Fixing &
11 Cum. 1250 1000 NA NA
Cleaning of Chute / Concrete Pump / Boom Placer Line and straightening, cutting, bending , placing
in position and binding of reinforcement including cost of binding wire including all tools and
tackels complete as per the instructions of the Enginer In-charge.
All charges for boring & construction of 1.0m nominal dia reinforced concrete cast in situ bored piles
with rig machine/ TMR including lowering of reinforcement cage and pouring of M-30 grade of
cement concrete with chute / concrete stationary pump /crane bucket etc. including assembly/
dismanteling & washing of pipe lines including all machines , manpower,tools and tackels, layout of
works, shifting of machinery and including providing and application bentonite solution in pile pore
(minimum 5 kg of bentnite shall be used in 100 lts.) ,necessary driving 4mm thick permanent steel
12 Rmt 2500 2500 NA NA
casing up to non - collapsible strata , dewateing , formwork,compacting ,vibrating,curing and
finishing including all leads and lifts including chipping of RCC pile up to cut off level (Minimum 1
D) including cleaning of reinforcement and removal of dismantaled material but excluding cost of
reinforcement complete as per the instructions of the Engineer In-charge. Length of the Pile shall be
measured from Cut Off level to Bottom of pile. (The RMC and reinforcement shall be supplied by
SCCPL on reconcilation basis.)
614318665.xlsx 1 of 2 Kerala Project_SOR2022 -revised
Schedule of Rates (SOR) for Kerala Projects -2022
VUP,LVUP,MNB & RCC
MNB/ROB/Interchange
BOX Structure,Box
FO/FO & Major Bridge
Culvert , Slab Culvert &
without backwater
HPC Culverts
With Without With Without
Sr.
No.
Description of Items Unit Shuttering Shuttering Shuttering Shuttering Remarks
Rate Rate Rate Rate
All charges for boring & construction of 1.2m nominal dia reinforced concrete cast in situ bored piles
with rig machine/ TMR including lowering of reinforcement cage and pouring of M-30 grade of
cement concrete with chute / concrete stationary pump /crane bucket etc. including assembly/
dismanteling & washing of pipe lines including all machines , manpower,tools and tackels, layout of
works, shifting of machinery and including pproviding and application bentonite solution in pile pore
(minimum 5 kg of bentnite shall be used in 100 lts.) ,necessary driving 4mm thick permanent steel
13 Rmt 3000 3000 NA NA
casing up to non - collapsible strata , dewateing , formwork,compacting ,vibrating,curing and
finishing including all leads and lifts including chipping of RCC pile up to cut off level (Minimum 1
D) including cleaning of reinforcement and removal of dismantaled material but excluding cost of
reinforcement complete as per the instructions of the Engineer In-charge. Length of the Pile shall be
measured from Cut Off level to Bottom of pile. (The RMC and reinforcement shall be supplied by
SCCPL on reconcilation basis.)
Fabrication charges for M.S. Liner including welding as per specifications and drawings including
14 cost of other material , labour, tools and plants required for completion of work as per the MT 5700 5700 NA NA
instructions of the Engineer In-charge.
All charges for fixing of LRPC High Tensile Steel Stands including all accessories,Stressing and
Grouting complete as per drawings. including all tools /stressing jacks and tackels complete as per
15 MT 8000 8000 NA NA
the instructions of the Enginer In-charge. The LRPC HTSS shall be provided by SCCPL at site on
reconciliation basis.
All charges for Shifting and erection of PSC Giders in correct alignement including all accessories
16 MT 800 800 NA NA
/riggers required for erection complete as per the instructions of the Enginer In-charge.
Fitting & Fixing in position, true to line & Level Neoprene/ POT -PTFE/ Spherical Bearings as Per
17 Drawing and approved technical specification (Grouting material, sleeves,RMC, Each 1500 1400 NA NA
Reinforcement for RCC Pedestal & Bearing Shall be Provided By SCCPL free of cost)
Responsibility MATRIX
Sr.
No
Description Responsibilty Responsibilty Responsibilty Responsibilty Remarks
1 Design and Procurement of all Structural formwork including Launching truss etc SUBCON SCCPL SUBCON SCCPL
2 Providing space for steel yard SUBCON SCCPL SUBCON SCCPL
3 Supply of Reinforcement steel at Steel Yard SCCPL SCCPL SCCPL SCCPL
4 Electricity /Welding Machine/Welding Rod/ Water for the job SUBCON SCCPL SUBCON SCCPL
5 Space for labour Sheds SUBCON SCCPL SUBCON SCCPL
6 All tools / tackels require for the smooth Execution SUBCON SCCPL SUBCON SCCPL
7 Unloading at site, Shifting & Re-shifting of materials, if any required. SUBCON SCCPL SUBCON SCCPL
8 Vehicle for Transportation of Material SUBCON SCCPL SUBCON SCCPL
9 Insurance Policy as applicable SUBCON SUBCON SUBCON SUBCON
10 Accommodation and Transportation of Staff & Workers. SUBCON SCCPL SUBCON SCCPL
11 Security of SCCPL Supplied Materials at Site SUBCON SUBCON SUBCON SUBCON
12 Drinking Water free of cost, nearby Work Site. SUBCON SCCPL SUBCON SCCPL
13 Construction Power, nearby Work Site. SUBCON SCCPL SUBCON SCCPL
14 Housekeeping, Site Cleaning, Disposal of Debris, Maintaining Hygiene etc. SUBCON SUBCON SUBCON SUBCON
All PPEs: Safety Helmet, Safety Shoes with Top & Bottom Plate, Safety Goggles, Safety Hand
15 SUBCON SUBCON SUBCON SUBCON
Gloves, Ear Plug, Safety Belt, Fluorescent Jacket etc. as per approved safe working procedure.
16 Casting space for Girders SCCPL SCCPL SCCPL SCCPL
17 Piling Equipments SUBCON SUBCON SUBCON SUBCON
18 Progress reporting SUBCON SUBCON SUBCON SUBCON
19 Acceptance of Material Delivery Challan including Concrete Logsheets SUBCON SUBCON SUBCON SUBCON
20 Transportation of Concrete to site @ Rs 130/-CUM FOC FOC FOC FOC
21 Providing Boom Placer at site @Rs 70/-CUM FOC FOC FOC FOC
22 Supply of Expansion joints & Bearings Free of Cost SCCPL SCCPL SCCPL SCCPL
23 Supply of Aggregate at RMC @ Rs 1000 /-MT NA NA NA NA
24 Supply of Cement at RMC @ RS 6300/-MT NA NA NA NA