Civil Works Progress Report

This progress measurement sheet summarizes the work completed in March-April 2022 for various civil works projects in Dukhan, Qatar. It provides updates on excavation, concrete pouring and other construction activities at Fahail, Khatiyah and Jaleha main degassing stations. Cumulative quantities of work like earth excavation and concrete are tracked against targets. The progress is reported station-wise for review and approval by the client AL Balagh.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
294 views17 pages

Civil Works Progress Report

This progress measurement sheet summarizes the work completed in March-April 2022 for various civil works projects in Dukhan, Qatar. It provides updates on excavation, concrete pouring and other construction activities at Fahail, Khatiyah and Jaleha main degassing stations. Cumulative quantities of work like earth excavation and concrete are tracked against targets. The progress is reported station-wise for review and approval by the client AL Balagh.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Progress Measurement Sheet

PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001 Project no : 4293 - GC20107100 Date: 19/05/2022
SCOPE DESCRIPTION: CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN DEGASSING STATIONS - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
STATION NAME : FAHAIL MAIN STATION.( FMDS )
Al Balagh Progress up to
BOQ Progress Qty previous Cummulative
Sr.no refernece DESCRIPTION UNIT for this period measurement Progress Qty Remarks
No period
A 2.1.2 PWCT Concret Pit in FMDS
1 2.1.3.1 Earth work excavation (L- 16.30 x W -9.00 x D 5.55 = 814.185 Cu.m). CU.M 0 814.185 814.2

Reinforcement Concrete Grade C 40 - ( Claiming 30 % from the qty for the


2 2.1.3.4 Completeion of base foundation concrete at the site) - ( Qty 180 cu.m x 30 % CU.M 54 90 144.0
= 54 Cu.m )
Foundation Blinding concrete grade C15 and Cement Mortor screed. Total
3 2.1.3.5 CU.M 18 18.0
18 Cu.m.

Prepared by: Approved by:

Technolax AL BALAGH
Progress Measurement S
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STOR
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE DESCRIPTION: CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN DEGASSING STAT
STATION NAME : KHATIYAH MAIN STAT

Al Balagh
BOQ
Sr.no
refernece DESCRIPTION
No

A 2.1.2 PWCT Concret Pit in KMDS


Earth work excavation for the KMDS Qty
1 2.1.3.1 ( Actual completed Qty as per site condition - L- 16.30 x B- 9.0 x Average
depth 7 .55 - 843.525 Approved Last invoice Qty ) = 264.060 Cu.m.

Reinforcement Concrete Grade C 40 - ( Claiming 50 % from the qty for the


2 2.1.3.4 Procure of rebars + 30 % Qty for Foundation Concrete ) - ( Qty 180 cu.m x 80
% = 144 Cu.m )

Foundation Blinding concrete grade C15 and Cement Mortor screed. Total
18 Cu.m. as per site condition Blinding 34 + Screed 6 = 40 Cu.m - total qty 18
3 2.1.3.5 Cu.m is equal to 22 Cu.m excess qty x 50 % Claiming concrete Qty. Therfore
total Qty 18 + 11 ( Excess qty 50 % Claiming ) = 29 Cu.m

Prepared by:

Technolax
Measurement Sheet
WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100 Date: 19/05/2022
MAIN DEGASSING STATIONS - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
HATIYAH MAIN STATION.( KMDS )
A
Progress up to m
UNIT Progress Qty previous Cummulative o Remarks
for this period measurement Progress Qty u
period n
t

CU.M 264.06 843.525 1107.585 ###

CU.M 144 144 ###

CU.M 3 26 29 ###

Approved by:

AL BALAGH
Progress Measurement S
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STOR
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE DESCRIPTION: CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN DEGASSING STAT
STATION NAME : JALEHA STATION
Al Balagh
BOQ
Sr.no
refernece DESCRIPTION
No

A 2.1.2 PWCT Concret Pit in JMDS

Earth work excavation for the JMDS Qty (Claiming 50% completed qty) ( L-
1 2.1.3.1 16.30 x B- 9.0 x Average depth 5.75x50% = 421.762 Cu.m.

Reinforcement Concrete Grade C 40 - ( Claiming 50 % from the qty for the


2 2.1.3.4
Procure of rebars) - ( Qty 180 cu.m x 50 % = 90 Cu.m )

Prepared by:

Technolax
Measurement Sheet
WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100 Date: 19/05/2022
MAIN DEGASSING STATIONS - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
E : JALEHA STATION.( JMDS )
Progress up to
UNIT Progress Qty previous Cummulative Remarks
for this period measurement Progress Qty
period

CU.M 421.76 421.7625

CU.M 90 90

Approved by:

AL BALAGH
Progress Measurem
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE DESCRIPTION: PIPE LINES CIVIL WORKS AT KHATIYAH - DUKH
STATION NAME : Right of
Al Balagh
BOQ
Sr.no
refernece DESCRIPTION
No

A 2.1.2 Right of Way

Track road 6 M Wide (Consider 873.340x70% of Material Mixing ,laying


1 2.1.2.1 Grading and Compaction of soil

Prepared by:

Technolax
gress Measurement Sheet
CED WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100
AT KHATIYAH - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
ON NAME : Right of way.( ROW )
Progress up to
UNIT Unit Rate Progress Qty previous Cummulative
for this period measurement Progress Qty
period

LM 768.90 350.00 350


ONS FOR PWI.
Date: 19/05/2022
ess Period: March 2022 to April 2022 month

Remarks

Approved by:

AL BALAGH
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STORAGE TANKS AT DREGASSING STATIONS
CLIENT: QE Dukhan
CONTRACTOR: AL-BALAGH TRADING AND CONTACTING CO.
SUBCONTRACTOR: Technolax Trading and Contracting Company
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE OF WORK : CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL M
EVALUATION SH

ANNEXURE -1- CIVIL WORK

BOQ Unit rate


Sr.No Description Unit
Reference Discounted(Q
AR)

2.1 Civil
2.1.1 PWCT General area
2.1.3 PWCT concrete pit

1 2,1.3.1 Earthwork excavation Cu.M 152.85

2 2.1.3.4 Reinforced concrete Grade C4O Cu.M 1,019.02


Foundation blinding concrete Grade C15 and cement mortar
3 2.1.3.5 screed Grid 1,111.66
4 2.1.2.1 Track road 6 meter wide Cu.M 768.90

TOTAL WORK EXECUTED AMOUNT IN QAR

Prepared by:

Praveen raj
Project QS
DREGASSING STATIONS FOR PWI.

AH, JALEHA AND FAHAIL MAIN DEGASSING STATIONS - DUKHAN AREA.


EVALUATION SHEET VALUATION DATE: 19-05-2022

ANNEXURE -1- CIVIL WORKS


TECHNOLAX (A1)

PREVIOUS CERTIFICATION CURRENT CERTIFICATION CUMULATIVE CERTIFIED

QTY AMOUNT (QR) QTY AMOUNT (QR) QTY

- - - - -

1,657.71 253,380.97 685.82 104,827.59 2,343.53

90.00 91,711.80 288.00 293,477.76 378.00

44.00 48,913.04 3.00 3,334.98 47.00


- - 873.34 671,511.13
- - - - -
394,005.81 1,073,151.45
-

Checked by:

Rajiv gandhi
Project Manager.
LUATION DATE: 19-05-2022

CUMULATIVE CERTIFIED

AMOUNT (QR)

358,208.56

385,189.56

52,248.02

-
795,646.14

ed by:

gandhi
ct Manager.
INVOICE
BILL TO
M/s. AL-BALAGH TRADING AND CONTACTING CO.
Project Name : EPIC FOR UTLIZATION OF PRODUCED WATER FROM STORAGE
TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001

S.No DESCRIPTION

SCOPE OF WORK : CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN
1) DEGASSING STATIONS - DUKHAN AREA.

MAIN STATION works. As per approved Measurement sheet attached for your
reference
AMOUNT IN WORDS:

(One Millian Seventy Three Thousand One Hundred Fifty One Qatar riyal and Fourty F

Please pay the cheque to "Technolax Trading and Contracting Company"


IBAN NO: QA63 MAFR 0000 0000 1001 1063 0600 1
MASRAF AL RAYAN BANK, CORPORATE BRANCH, DOHA-QATAR
CR . NO : 138540 , Tax card Number (TIN) : 6855307937

Prepared by
Rajiv Gandhi

Thank You For Your Business!


DATE 19-May-22
INVOICE TTC- 162
OM STORAGE
RA Bill no RA Bill - 02 invoice

QTY RATE UNIT AMOUNT


(QAR)

AIL MAIN

ed for your
1 1.00 LS 1,073,151.45
[42]

TOTAL 1,073,151.45

r riyal and Fourty Five dhrs only. )

Checked/approved by

our Business!

You might also like