22HI0009
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 5TH DEO
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
BRGY. POBLACION, DANAO CITY, CEBU
F.Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE
- CEBU NORTH HAGNAYA WHARF RD
- K0065+000 - KO065+100, K0072+400 - K0072+500
CEBU NORTH HAGNAYA WHARF ROAD
‘SOGOD AND BORBON, CEBU
SECTION 1: K0065+000 - KO065+100, SECTION 2: KO072+400 - KO072+500
4,198 square meters
$00249CB
oO 7‘START OF THE ROAD SIO
PROTECTION PROJECT
roba8 + 00000.
SECTION 1
END OF THE ROAD SLOPE
PROTECTION PROJECT
0088 + 10000
SECTION 2
[START OF THE ROAD SIG
PROTECTION prove?
ro07a +0900
0072 50000
LOCATION PLAN
O NOT TO SCALE
BwINDEX OF SHEETS
PROJECT LENGTH DATA
‘SHEET NO.
‘SHEET CONTENTS:
STATIONING LENGTH
SECTION 1 ERE + 00 -KORES +100 10020
‘SECTION 2 GGT © 400-KOSTE + 5 100m
‘PROJECT DATA INDEX OF GHEETE, ANO DESIGN PARAMETERS
TOTAL LENGTH zon
TOTAL AREA orn
‘GENERAL REGUREMENTS
TWRTERDL AND CONSTRUCTION REQUREMENTS
‘TRAFFIC NAMACENENT SLAM AND WORKSITE LAYOUT
PROJECT BLLBOAND HONDA.
GEOTAGGED PHOTOS
PLANANO PROFLE SECTION 1
DESIGN PARAVETERS SECTION
Cumulative Equvalent Standard Ade Load (CESAL)
ALONG SECTION 1: K0065+000 - K0065+100
~
Design Lie
‘Assured Trafic Growth, TER
‘Compute CBR
Resiient Modulus
Relay, R
2
(Overall Standard Deviaton, So
Initial ServceabiltyIndox, PO
Terminal Services index, Pt
PCCP Modulus of Rupture, St (550 psi@ T4days)
‘START END
Drainage Goefcient, Ca
Load TranserCoefiont.
Loss of Support LS.
Elective Modulus of Subgrade Reaction, k
Shi | Cehi Figeter 275%) allSUMMARY OF QUANTITIES
Item No. Description unit Quantities Remarks
11.6) | PROMSION OF ConmNED FELD OFICE UEORATORY MOLNING Wonths 900 | comunceToer ct exesorou 730
'A.1.2(2) | PROVISION OF 4x2 PICK UP TYPE SERVICE FOR THE ENGINEER | each 1.00 ‘20001 THE DP STANDARD SPECCATIONS
[B.S | PROVIDE PROJECT BILLBOARD (2 PCS 4x8" DPWH, Ipc x8'COA) | each 2.00 | COMPLANCE TO DEPT. ORDER 2, SERIES OF 207
B.7 | OCCUPATIONAL SAFETY AND HEALTH PROGRAM us. 1.00 "NCONELONCE TO DEPT, ORDERS, SERIES OF 00
BS | TRAFFICMANAGEMENT Ls. 1.00 1 COMPLE TO DEPT. ORDER SERIES OF 18
B.9 | MOBILIZATION / DEMOBILIZATION Ls. 1.00 IN CONPUANCE TO DEPT ORDER 67, SERES OF 216
100(1) | CLEARING AND GRUBBING ha. 042 0027 THE DPWH STHIOHRDSFECCATONS
512(1)d | EROSION CONTROL MAT, TYPE 4 sq.m, 4,198.00 OOP THE PAH STANDARD SPEOFCATIONS
'513(1) | PERMANENT GROUND ANCHOR Lm, 6,675.00 ‘ADOPT T= OPW STANDARD SPEOFCATINS
522A(1) _ | ACTIVE PROTECTION SYSTEM sam. 4,198.00 ‘OPT THE OP STANDARD SPECIFICATIONS, HGH TENSLE WRE
NOTES: QUANTITIES ARE SUBJECT TO CHANGES AS PER ACTUAL CONDITION ON SITE.
a) AUR GiEsi S COIPE- 0 Fe WORKS!
‘THE PROJECT AIMS TO PROTECT MOTORIST FROM ROCK FALLING STRUCTURES FROM MOUNTAIN SLOPES AND ENSURES SAFE AND RELIABLE NATIONAL ROAD SYSTEM. THE TOTAL PROJECT LENGTH IS 200M
‘WHICH COMPOSED OF 2 SECTIONS, SECTION 1: KO065+000 TO KO065#4100, AND SECTION 2: KOO72+400 TO KO072+500. THIS PROJECT IS A CONSTRUCTION OF SLOPE PROTECTION STRUCTURE,
USING AN ACTIVE PROTECTION SYSTEM WITH HIGH TENSILE WIRE INCORPORATING PERMANENT GROUND ANCHORS IN EVERY 2.0M SPACING, WTH EROSION CONTROL MAT, TYPE 4
WHICH ARE SIGNIFICANT ITEMS NEEDED FOR THE PROJECT SLOPE PROTECTION STRUCTURE PROJECT AGANST ROCK FALL PROTECTION.
.=- =, leGENERAL NOTES
|. GENERAL REQUIREMENTS
1. ALL WORKS SHALL COMPLY WITH THE FOLLOWING
~ DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS, VOLUME Il
= DPWH STANDARD SPECIFICATIONS 2013 EDITION
2. UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE EXPRESSED IN MILLIMETER
WHILE DISTANCES AND ELEVATIONS ARE IN TERMS OF METER.
3. FIELD DATA OF THIS PROJECT IS BASED ON ACTUAL SURVEY CONDUCTED ON
OCTOBER 01, 2021 BY THE SURVEY TEAM OF THE DPWH CEBU STH DEO.
4, AS STAKED PLAN SHALL BE PREPARED BY THE WINNING CONTRACTOR
BASED ON THE PRE-CONSTRUCTION SURVEY JOINTLY CONDUCTED BY THE
‘CONTRACTOR, IMPLEMENTING OFFICE AND CONSTRUCTION SUPERVISION
CONSULTANTS (CSC) SERVICES / CONTRACTS.
5, INACCORDANCE WITH DEPARTMENT ORDER NO. 28 SERIES OF 2015, UPON
THE ISSUANCE BY THE DPWH OF THE NOTICE TO PROCEED (NTP), THE
IMPLEMENTING OFFICE SHALL PROVIDE THE CONTRACTOR AN EDITABLE
ELECTRONIC COPY OF THE APPROVED PLANS FOR THE PROJECT TO
FACILITATE THE PREPARATION BY THE CONTRACTOR OF THE AS - STAKED
PLAN. ANY DISPARITY BETWEEN THE AS - STAKED PLANS MAY SERVE AS.
‘THE BASIS FOR INITIAL VARIATION ORDER.
6. "AS - STAKED" SHALL BE NEW SET OF PLANS DEPICTING THE ACTUAL FIELD
REQUIREMENT. IN ADDITION, STANDARD DRAWING AND OTHER DRAWINGS
WITHOUT CHANGES NEED NOT BE REDRAWN IN THE PREPARATION OF
[AS - STAKED PLAN. A COPY OF THE APPROVED ORIGINAL DESIGN PLAN SHALL
BE INCLUDED IN THE SUBMISSION OF THE "AS-STAKED" TO FACILITATE REVIEW,
EVALUATION AND APPROVAL OF THE LATTER,
7. PRIOR CLEARANCE OR AUTHORITY SHALL BE SECURED FROM THE DISTRICT
ENGINEER FOR PORTIONS INVOLVING MAJOR CHANGES THAT WOULD ENTAIL
J SURMOUNT TO CERTAIN CHANGES ON THE ORIGINAL ITEMS OF WORK.
8. SUBMITTAL OF BIDDING DOCUMENTS THE BIDDER CONTRACTOR SHALL
SUBMIT DESIGN CALCULATION, INCLUDING ASSUMPTIONS AND INPUTS
TO COMPUTE FOR THE ANCHOR LENGTH, SPACING AND MINIMUM
PULLOUT STRENGTH. IF_A SOFTWARE PROGRAM IS USED IN THE
DESIGN, AND ITS USAGE SHALL BE ACKNOWLEDGE AND ACCEPTED BY
THE DPWH BUREAU OF DESIGN.
10.
12
GEOTECTNICAL REPORT PRESENTING DETAILED SUBSURFACE
INFORMATION AND RECOMMENDATIONS, SIGN AND SEALED BY A CIVIL
ENGINEER REGISTERED IN THE PHILIPPINES.
THE CONTRACTOR OR INSTALLER SHALL PROVIDE A TEN (10)
YEAR WARRANTY FOR LABOR AND SHALL REPLACE ANY
DEFECTIVE WORKS AT NO COST TO DPWH.
. THE CONTRACTOR/BIODER FROM THE SUPPLIER OF MATERIALS
SHALL PROVIDE A TEN (10) YEAR WARRANTY FOR MATERIALS AND
COMPONENTS AND SHALL REPLACE DEFECTIVE MATERIAL, THE
WARRANTY SHALL BE DULLY COVERED BY THE REPUTABLE
INSURANCE COMPANY.
THE CONTRACTOR / MANUFACTURER SHALL FILLY RESPECT
INTERNATIONAL PATENT RIGHTS. IT SHALL SUBMIT CERTIFICATION
THAT MATERIALS TO BE SUPPLIED THE PROJECT ARE NOT
COUNTERFEIT PRODUCTS.ll, MATERIAL AND CONSTRUCTION REQUIREMENTS, SPECIFICATION
All materials shall be accompanied with a certification issued by the
manufacturer or supplier stating compliance with the specification
requirements, non-infringement of registered patents (with patent number
clearly stated if available), and the material's country of origin.
PROPERTIES REGURENENTS TEST METHOD
og
Miscellaneous Materials
+ All miscellaneous materials such as clips, ropes! cables, ete. shall be
‘supplied by the manufacture appropriate with the system. it shall be
1d galvanized per AASHTO M 111 (ASTM A123M) or
‘equivalent.
Construction Requirements
installation necessary to construct the protection system.
Mesh System
For mesh system (active ), the anchorage using bolt/soil nail be
‘with a minimum grid spacing 2x2m.
‘be based on results of a geotechnical
investigation. Once the grouting of anchorage has achieved curing, the
‘mesh panels are installed. the rolls of mesh panel shall be positioned as
per Plans. On the slope face, the side of the mesh panel shall be securely
‘and continuously joined together using connection clips or ropes. Erosion
‘control material;s and /or hydrosedding can be added to the protection
system in cases as per the Engineer's recommendations.
Quality Control & Assurance
For pull testing, the Contractor shall perform two (2) types of soil nail!
anchor pull test;
4. Conformity Pull Test which is performed for trail anchor bolts/soil
nails prior to actual anchor boltsisoil nails installation for the
verification of peripheral surface friction resistance
2. Proof Pull Test which is performed for selected set of installed soil
nailsfanchors for the verification of the anchoring strength to meet
the required performance.
Itis preferable to conduct one(1) Conformity Pull Test if the soll condition
of the site is unpredictable only from the available data, but it can be
‘omitted if itis predictable from the a data.
‘The Contractor shall provide all necessary resources including oll torque
jauge, reaction frame, joad cell, bearing plates, and
nails specified.
he et BALEGEND
EXISTING TOPOGRAPHIC FEATURES NEW TOPOGRAPHIC FEATURES
sagas, [WAH 000) nam oe a oe te == |" a ee
a — . |= ol | eee 3
men) aon | — ease [mow Ho lee [ap f= |
Peo — |= i 7
— ar = mo || == le — | —
= = —— Hol —— ee
= o |= e@ Plt ol comm fom ye [om Fy
we [2 8 [a 1, [snomnm = | ale =
sera Cem | Ye = oO ‘sey —— ob ta
wes | > jae [=~ | aa lar | ee lee a @
ABBREVIATION AND SYMBOLS
wou sz co caronsasn Cd vr nsewurioootse. PREFERENCE PONT
wise mesost¢TON & —comeane ve. Moerooo uve, vnc Fa PORTOFVERTEN MERSECTON
errno Urwi—ePaRTUETOrPUBLCWORKS = METELEVATIN mo MoBLEORONATE AE PONTOF RTCA. CUE
fe ASHUTOONRETE monomer K——RATEOFVERCAL CURVE m= METER fe PORTOFVERTCATANENCY
ne EE os ste vor uerer Ne mauaLeRessra OCP PORTUND CEMENT CONTE
es somes een osmace we eakTorove rs worTosouE rvenent
csr wexstaoN 8 pareorsureReevaron Oe LEHTOFVEREN CURVE OM——RORURYATERLEL POT. FONTOFTANGENCY
sce BEGHNGOFCREUARCUE BEVEL EVATEN oo urrsoe —ponrcrerexsecron ROHS
au exch vw HeAOWL vara ere RENPORCEOGRETE. ROR RERFORCEDCONCETEROXCUNERT
+ oxoeer sion sioner fowr —rononny peccuvert fe ——_RFERENCEPONT
¥—esguseeen ersten mt RoTsDe ow mekTor MAY FeneoRce COnrETE DE ORDER|
‘SLOPE PROTECTION| IE CLOSED
WORK AHEAD DET OUR
me
DETOUR |
Te
MESH FENCING BARRIERS
ee
heae]
S-1 TRAFFIC CONES:
Sa
i.
S-1 TRAFFIC BOLLARDS
=a
@ apvaro
gs
$-2 BARRIER BOARD.ALONG CEBU NORTH HAGNAYA WHARF ROAD
SECTION 1: KODE5"000-KOD85"100 (RIGHT SIDE ONLY) 5363
‘SECTION 2: KO072+400 - KO072+500 (RIGHT SIDE ONLY) 8 : :
ae
ADVANCE (CLEARANCE
WARNING AREA ‘TRANSITION ‘AREA FOR
= 2 (DESIGN SPEED) AREA= ‘Onis | workers | work anea
LAYOUT 4 - PART LANE CLOSURE - 2 LANE, 2 WAY ROAD, HIGH SPEED, SHORT TERM
OP/SLOW Raa Roa OER PET—|—accanes [Using Two Traffic Controllers:
@
p= Re es
| fre —jaares SSPE — ass — Tre ne a een cee ut ts
Tonparay Hatard Marrs (EA and YE)
WORKMEN AMEAD (Symbote) 71)DPWH STANDARD PROJECT BILLBOARD
—
(ORIENTATION
NOTES: (REFER TOD.0.21 52017)
‘Sacro an 08 sn ( on aA
‘pers ggwenamor aur os hoses oven (0
saa” oy rensemces DoT
V7 ois DISPI A |
seis |_